INSP-Final Inspection | 7/19/2019 | 7/22/2019 | 7/22/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire sprinkler inspection complete.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 7/15/2019 | 7/16/2019 | 7/16/2019 | P | FAIL |
Jim Page
|
|
|
Large soffit ubstruction over the top of range will need sprinkler protection added. Escutcheon does not cover the entire sprinkler hole in a few places throughout the house, need holes repaired so escutcheon covers entire sprinkler hole with no gaps.
Please call an hour ahead. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Supply line flush | 2/1/2019 | 2/4/2019 | 2/4/2019 | A | DONE |
Jim Page
|
|
|
Underground supply flush witnessed.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 1/22/2019 | 1/23/2019 | 1/23/2019 | P | CANC |
Jim Page
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping and tenting (all tenting in place at time of inspection) complete, approved for cover.
|
INSP-Sprinkler Rough-in | 12/19/2018 | 12/20/2018 | 12/20/2018 | A | PART |
Troy Cobbley
|
|
|
Tenting and rough in passed for the most part. One area in the Master Bedroom needs tenting repaired prior to cover and cpvc piping compatibility with the insulation spray foam needs to be verified prior to cover on any of the vertical sprinkler lines. All other areas can be covered. The control valve under the riser needs to be removed
. Please call about an hour ahead so me and the contractor can meet with you. Phone #: ###-#### Inspection requested via web by Sam Ball
|