Information based on query as of Thursday, May 9, 2024.
Permit Information
Permit NumberFIR18-00829
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2033 S HUDSON AVE
Project NameSkyline Apartments Bldg G
Customer Number 
ePlanReviewYes
Description
[Skyline Apartments Building G]
The fire sprinkler scope of work consists of installing a new fire sprinkler system into a new three-level apartment building per NFPA 13R, 2016, and the City of Boise. The system has floor control valves, residential sprinklers and CPVC piping.

• The underground piping is under permit FIR18-00813

[BLD17-04628]
Building G: (SKYLINE APARTMENTS – BUILDING TYPE 2, Building A, B, C, E, G and J) (24 units) PLAN MOD RELOCATE WASHER/DRYER FROM BATHROOM TO HALLWAY ADD CLOSED DOOR AS NOTED ON APPROVED PLANS 7-2-18**AJS**The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 25,320 square foot three story VB Type of Construction apartment building (8,458 sq. ft. 1st story and 8,431 sq. ft. 2nd story and 8,431 sq. ft. 3rd story). Each unit is 1 story. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, 1-hr dwelling unit separations, 1-hour fire barriers for stair and breezeways, rated doors in breezeway, interior nonbearing walls, millwork, and finishes. Special Inspection is NOT required. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **ajs**192-unit apartment project with (9) apartment buildings, clubhouse, and associated site work

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/1/201910/2/201910/2/2019PPASS
DetailsJim Page
Final fire sprinkler inspection complete.

Jon Beazer is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection9/12/20199/17/20199/16/2019PCANC
DetailsJim Page
Jon Beazer is the contact. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in/Hydro4/29/20194/30/20194/30/2019PDONE
DetailsTroy Cobbley
The overhead hydro was witnessed with no visible loss on the guage. Gerardo Phone #: ###-####
INSP-Sprinkler Rough-in3/26/20193/26/20193/26/2019PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.

Gerardo Arce is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in3/12/20193/13/20193/13/2019PCANC
DetailsJim Page
Had to get to other inspections, this request will need to be rescheduled.

Gerardo Arce is the contact. Thank you for your work! Phone #: ###-#### Inspection requested via web by Stan Beus