INSP-Final Inspection | 3/22/2019 | 3/25/2019 | 3/25/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 3/22/2019 | 3/22/2019 | 3/22/2019 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection for area of work complete.
|
INSP-Alarm Testing | 3/21/2019 | 3/22/2019 | 3/22/2019 | A | CANC |
Jim Page
|
|
|
Request was for a final inspection, this request is cancelled.
Mike will be there at 7:00 am Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 3/8/2019 | 3/8/2019 | 3/8/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, area of work approved for cover.
Phone #: ###-#### Inspection requested via web by Sam Ball
|