Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberFIR19-00321
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 1653 N MOCKBEE PL
Project NameHyde-Heidorn Residence
Customer Number 
ePlanReviewYes
Description
New residential sprinkler system for a new single family dwelling.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/11/201912/12/201912/11/2019APASS
DetailsJim Page
Final fire sprinkler inspection is complete.

Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Final Inspection12/11/201912/12/201912/11/2019PCANC
DetailsJim Page
Phone #: ###-#### >> Inspection requested via web by Jessia Maxwell Inspection cancelled from web by: Jessia Maxwell
INSP-Final Inspection12/9/201912/9/201912/9/2019PCANC
DetailsTroy Cobbley
Please all Jess before heading down. Phone #: ###-#### >> Inspection requested via web by Jessia Maxwell Inspection cancelled from web by: Jessia Maxwell
INSP-Sprinkler Rough-in/Hydro7/8/20197/8/20197/8/2019PPASS
DetailsJim Page
All tenting in place at time of inspection, rough to cover inspection for overhead fire sprinkler piping complete, approved for cover.

Please call James Mair ###-#### Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Sprinkler Rough-in7/2/20197/5/20197/5/2019AFAIL
DetailsTroy Cobbley
I tried calling the contact phone number three times but it won't even ring. I tried calling Clarence but it just goes to voice mail. I went to job site and made no contact. I however walked and looked at the tenting. On the main level laundry room the cpvc piping disappears behind the insulation on the wall (not sure what is going on here) and the ladder has been removed so I have no access to the upper floor to look at tenting. I walked around the house but I'm unsure it the roofing is approved to walk on. No piping can be covered. Sticker left on site.

Please call James Mair ###-#### Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Sprinkler Rough-in7/1/20197/1/20197/1/2019PPART
DetailsTroy Cobbley
The rough-in appears to match the revised plans. Piping can not be covered until a tenting inspection has been passed. Hanger issue was not resolved yet.

Clearance Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro6/25/20196/25/20196/25/2019PFAIL
DetailsJim Page
Piping installed does match city approved drawings. Overspaced hangers on level 1. System held 200 psi for hydrostatic test but if changes need to be made to match city approved drawings then a re-hydro will be required. Head in level 3 bedroom is to close to heat register, need 24 inchs off of heat registers with 13D.

Plans are stuffed in riser drain valve Phone #: ###-#### Inspection requested via web by Jessia Maxwell