INSP-Final Inspection | 4/3/2020 | 4/3/2020 | 4/3/2020 | A | PASS |
Jim Page
|
|
|
Final inspection for underground supply is complete.
|
INSP-Sprinkler Rough-in/Hydro | 4/3/2020 | 4/3/2020 | 4/3/2020 | A | DONE |
Jim Page
|
|
|
Underground hydrostatic test has been witnessed, no pressure loss was observed.
|
INSP-Sprinkler Rough-in | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | CANC |
Jim Page
|
|
|
Rough in inspection is for overhead, this permit is underground install, this request is cancelled.
Aron Foster is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Supply line flush | 12/19/2019 | 12/20/2019 | 12/20/2019 | A | PASS |
Troy Cobbley
|
|
|
The underground flush was witnessed.
Todd is the contact. Thanks for all you! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for UBR complete, IBR approved for cover. Remaining underground to be installed at a later date.
Bryan Collins is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|