INSP-Final Inspection | 7/22/2019 | 7/23/2019 | 7/23/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Kenny Caldwell is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | CANC |
Troy Cobbley
|
|
|
Missing ceiling tile, not ready for final.
Kenny Caldwell is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed for the head in the Lobby. Piping can be covered.
|
INSP-Sprinkler Rough-in | 7/9/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed for all areas except for the front lobby area where one additional pendant has been added. Either the pendant needs removed or plan mods are needed due to this being a remote area. Piping can be covered in all areas except this lobby area.
Kenny Caldwell is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|