INSP-Final Inspection | 7/18/2019 | 7/19/2019 | 7/19/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire alarm inspection for area of work complete.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 7/16/2019 | 7/17/2019 | 7/17/2019 | P | FAIL |
Jim Page
|
|
|
Audible sound from speaker was very distorted, need to troubleshoot audible issue and schedule a re-inspect after issue is resolved.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Sprinkler Rough-in/Hydro | 7/12/2019 | 7/12/2019 | 7/12/2019 | P | CANC |
Jim Page
|
|
|
Inspection request was not made by Protex per conversation with Morgan, appears the GC made the request without coordination with Protex. This request is cancelled after talking to Morgan.
Jon Phone #: ###-####
|