Final | 12/12/2018 | 12/12/2018 | 12/12/2018 | P | PASS |
Brian Scoles
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak
|
Final | 12/11/2018 | 12/11/2018 | 12/11/2018 | P | FAIL |
Brian Scoles
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- needs combustion air registers in doors in garage cut in- rest is good
|
Rough-in | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | PASS |
Brian Scoles
|
|
|
mec and firepl Phone #: ###-#### Inspection requested via web by Oleg Chervak- fireplace R/I ok- hvac R/I ok
|
Pressure Test | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass
|
Rough-in | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | FAIL |
Brian Scoles
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- fireplace thimble is installed upside down doesnt meet clearance- crawl not complete- need to fix all rips and tears in arma flex- b vent doesnt have 1" clearance to sheetrock and insulation shield needs to go all the way to roof pitch- dryer vent duct needs seal to termination box- exhaust fan flex in master toilet needs to be ran above gas line- fresh air damper needs sealed- reinspection fee issued for ongoing issues on R/I of new construction- left correction notice front window
|
Pressure Test | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- gauge wont zero out
|