Final | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Brian Scoles
|
|
|
Meeting Jay for confirmation @ 9am. Thanks Phone #: ###-#### Inspection requested via web by Gary Reeves- final ok
|
Conference | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | PASS |
Brian Scoles
|
|
|
duct blast test pass
|
Rough-in | 4/3/2019 | 4/3/2019 | 4/3/2019 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- R/I ok
|
Rough-in | 4/2/2019 | 4/3/2019 | 4/3/2019 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- need nail plate 2nd floor flor and ceiling on pvc flue- need to insulate outside air in joist in garage- duct in crawl laying on ground needs supportted to minimum 4" off ground- left notice on furnace
|
Pressure Test | 4/2/2019 | 4/3/2019 | 4/3/2019 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- 20lb gas pass tagged meter location- 5lb flue pass
|
Rough-in | 3/28/2019 | 3/29/2019 | 3/29/2019 | P | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- fresh concrete pour in garage no access to furnace or man j- outside air in garage needs insulated to R-8- reschedule when access is ok
|
Pressure Test | 3/28/2019 | 3/29/2019 | 3/29/2019 | P | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- fres concrete pour in garage- no access
|