Final | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | PASS |
Brian Scoles
|
|
|
final ok- card signed
|
Rough-in | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | PASS |
Brian Scoles
|
|
|
Phase III cover - call Cary for info Phone #: ###-#### Inspection requested via web by Brandon Sorensen- R/I final stage ok- ok to insulate
|
Rough-in | 7/1/2019 | 7/2/2019 | 7/2/2019 | A | PASS |
Brian Scoles
|
|
|
Open office area cover Phone #: ###-#### Inspection requested via web by Brandon Sorensen- R/I ok- ok for grid to be finished- registers flex ok
|
Final | 6/6/2019 | 6/7/2019 | 6/7/2019 | P | PART |
Brian Scoles
|
|
|
Partial Final - call cary Phone #: ###-#### Inspection requested via web by Brandon Sorensen- final for front entry area and 2 back offices ok- temp occupancy ok- call in when remaing grid is installed with registers
|
Final | 5/31/2019 | 6/3/2019 | 6/3/2019 | P | NR |
Brian Scoles
|
|
|
PM inspection - final - call scott Phone #: ###-#### Inspection requested via web by Brandon Sorensen- still need to remove seperation wall and install grid to have registers installed in- talked with GC onsite-
|
Rough-in | 5/30/2019 | 5/31/2019 | 5/31/2019 | A | PASS |
Brian Scoles
|
|
|
hard lids for conference and 2 offices Phone #: ###-#### Inspection requested via web by Brandon Sorensen- register, flex and grid 3 rooms ok for ceiling tiles
|
Rough-in | 3/20/2019 | 3/21/2019 | 3/21/2019 | A | PASS |
Brian Scoles
|
|
|
Rough In - call cary Phone #: ###-#### Inspection requested via web by Brandon Sorensen- phase one seal on duct ok- ok to insulate- ok for grid
|