Final | 8/23/2019 | 8/23/2019 | 8/23/2019 | A | PASS |
Brian Scoles
|
|
|
Jake is your contact Phone #: ###-#### Inspection requested via web by Kim Adams- final ok- card signed
|
Final | 8/15/2019 | 8/16/2019 | 8/16/2019 | A | PART |
Brian Scoles
|
|
|
Jake is your contact Phone #: ###-#### Inspection requested via web by Kim Adams- Temp occupancy ok- All roof penetrations need roofed in- Is air balance done ?
|
Final | 8/14/2019 | 8/15/2019 | 8/15/2019 | A | PART |
Brian Scoles
|
|
|
Jake is your contact Phone #: ###-#### Inspection requested via web by Kim Adams- need to label f/s dampers on grid- need to roof in all penetrations on roof- secondary drains from coil can not tie into primary furnace drains- air balance still needs completed- temp occupamcy ok this permit only- other mech contractor inspection still needs on gas piping called in
|
Rough-in | 8/5/2019 | 8/7/2019 | 8/7/2019 | A | PART |
Brian Scoles
|
|
|
Robert is the contact Phone #: ###-#### Inspection requested via web by stan lillquist- R/I ok on 4 classrooms and hallway ok for ceiling tiles-
|
Rough-in | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | PASS |
Brian Scoles
|
|
|
bathrooms and offices, Robert is your contact. Phone #: ###-#### Inspection requested via web by stan lillquist- 2 fire/smoke damper framong and clearances ok, ok for angles- seal on ducts in classrooms, offices and bathrooms ok- ok to cover- still need to look at linesets for a/cs and minisplits- ok for ceiling grid
|
Rough-in | 6/18/2019 | 6/19/2019 | 6/19/2019 | A | PASS |
Chad Schwendiman
|
|
|
Duct sealing inspection. Robert is the contact Phone #: ###-#### Inspection requested via web by stan lillquist
|