Final | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PASS |
Brian Scoles
|
|
|
final - call scott Phone #: ###-#### Inspection requested via web by Brandon Sorensen
|
Rough-in | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
Brian Scoles
|
|
|
rough - call scott Phone #: ###-#### Inspection requested via web by Brandon Sorensen- R/I ok- ok for ceiling tiles excluding break room where condensate drain work will be doneneeds to be in approved metal GC is on it
|
Rough-in | 6/19/2019 | 6/19/2019 | 6/19/2019 | A | PART |
Brian Scoles
|
|
|
Cover Phone #: ###-#### Inspection requested via web by Brandon Sorensen- condensste drain needs to be ran in approved material thats plenum rated for condeser pan and minisplit head drain- registers flex and insulation ok
|
Rough-in | 5/30/2019 | 5/30/2019 | 5/30/2019 | P | PASS |
Brian Scoles
|
|
|
rough in - call scott Phone #: ###-#### Inspection requested via web by Brandon Sorensen- seal on duct ok- ok to insulate
|