Final | 2/6/2020 | 2/6/2020 | 2/6/2020 | P | PASS |
Brian Scoles
|
|
|
Roger Graves has a copy of the air balance report on site. Phone #: ###-#### Inspection requested via web by Doug Madsen- final ok- air balance ok- equipment under hood set- card signed
|
Final | 1/10/2020 | 1/13/2020 | 1/13/2020 | A | PART |
Brian Scoles
|
|
|
Roger Graves the site superintendent will be the onsite contact his phone number is ###-####. Phone #: ###-#### Inspection requested via web by Doug Madsen 1- oven needs set under hood to check clearances 2- air balance on EF 2 for hood onsite 3- R/A in storage room needs R6 flex duct installed 4- need approved fittingand ducting to class 2 hood and sealed- has make shift ducting to hood need to replace
Roof is good- call in final when all equipment and corrections made and air balance report onsite
|
Rough-in | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | PASS |
Brian Scoles
|
|
|
Roger Phone #: ###-####- R/I ok- hard lids ok for cover- insulation ok- ok for ceiling grid- class 2 exhaust approved via engineer for running in galvanized
|
Rough-in | 11/22/2019 | 11/25/2019 | 11/25/2019 | A | PART |
Brian Scoles
|
|
|
Roger Graves is the job site contact ###-#### Phone #: ###-#### Inspection requested via web by Doug Madsen- seal on all ducting ok- need to finish insulation on all ducting above hard lids- all register cans need installed in bathrooms and flex for hard lid cover- call in R/I inspection when these are completed- need engineer approval on galv duct for class 2 hood shows to run in aluminum
|