Rough-in | 7/7/2020 | 7/7/2020 | 7/7/2020 | P | PASS |
Ben Livingston
|
|
|
Please call 30 mins. prior to arrival. Shane: ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum -hps hpc 2nd floor area B&C 100lb
|
Rough-in | 6/15/2020 | 6/15/2020 | 6/15/2020 | P | PASS |
Ben Livingston
|
|
|
Please call Shayne at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 1st floor area A 100lb snowmelt
|
Rough-in | 6/3/2020 | 6/4/2020 | 6/4/2020 | A | PASS |
Ben Livingston
|
|
|
Please call Shayne at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 5 100lb tests, 1st floor hydronic loop, 1st to 4th floor risers, 2nd floor tie ins to vavs
|
Rough-in | 5/29/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Chad Schwendiman
|
|
|
Mechanical Pipe, Please call Fernando at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 100lb pass for level 1 area A pumped condensate, low pressure condensate and low pressure steam.
|
Rough-in | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | PASS |
Ben Livingston
|
|
|
Mechanical Pipe, please call/text Shane at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - condencing water utility yard 100lb part.
|
Rough-in | 4/28/2020 | 4/28/2020 | 4/28/2020 | P | CANC |
Ben Livingston
|
|
|
Med Gas. Please call Shane at least 30 min prior to inspection, he is prepared to do video or photos if needed. Phone #: ###-#### Inspection requested via web by Rhonda Marcum - med gas under PLM permit-
|
Rough-in | 4/23/2020 | 4/23/2020 | 4/23/2020 | P | PASS |
Ben Livingston
|
|
|
Please call Fernando at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 1st floor area A 100lb hydronic loop
|
Rough-in | 4/8/2020 | 4/9/2020 | 4/9/2020 | A | PASS |
Ben Livingston
|
|
|
Mechanical Piping Rough-in Inspection. Please call prior to arrival. Please contact Fernando ###-####. Phone #: ###-#### Inspection requested via web by Rhonda Marcum - hydronic loop suply and return 100lb area A 3rd floor
|
Rough-in | 3/31/2020 | 3/31/2020 | 3/31/2020 | P | PASS |
Ben Livingston
|
|
|
Please call Fernando at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 3rd floor area A lowpressure steam& condensate 100lb
|
Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 | A | PASS |
Ben Livingston
|
|
|
Mechanical Pipe, please call Fernando at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 2nd floor area D&B high pressure steam, condensate, chilled water supply & return 100lb - 2nd floor A pump condensate 100lb - 3rd floor A hydronic 100lb columb 11w - 7w
|
Rough-in | 3/12/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Ben Livingston
|
|
|
Mechanical Piping Inspection. Please call prior to arrival. Fernando: ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 2nd floor MOB low pressure steam and condensate 100lb - 2nd floor MOB hydronic loop 100lb
|
Rough-in | 2/10/2020 | 2/11/2020 | 2/11/2020 | P | PASS |
Ben Livingston
|
|
|
Please call Fernando at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 2nd floor HWS and HWR area B,C,D 100lb hydronics -
|
Rough-in | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Chad Schwendiman
|
|
|
Mechanical piping, please call Fernando at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 100lb hydronic pass for the trunk lines on 4 systems in area D 2nd floor. Noted on approved plans
|
Rough-in | 12/17/2019 | 12/18/2019 | 12/18/2019 | P | PASS |
Ben Livingston
|
|
|
Please call Fernando at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 2nd floor hydronic loop marked in yellow 100 lb test -
|
Rough-in | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | PASS |
Ben Livingston
|
|
|
Please call Fernando at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 12" supply and return chiller piping from mechanicalroom to out side the building, full length pipes no joints -
|