Final | 10/18/2019 | 10/21/2019 | 10/21/2019 | A | PASS |
Brian Scoles
|
|
|
duane Phone #: ###-####- final ok- card signed
|
Final | 10/17/2019 | 10/18/2019 | 10/18/2019 | P | CANC |
Brian Scoles
|
|
|
Dawne Phone #: ###-####- per phone from Dwayne no power to fan will do airbalance when operational- will reschedule
|
Final | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | PART |
Brian Scoles
|
|
|
Dwayne Phone #: ###-#### 1- need air balance report onsite for hood and registers 2- need engineer approval on galv duct versus ss for hood exhaust 3- need to permantley tag gas line with address 4- need engineer approval on hood exhaust fan on how it will be controlled and what CFM quantity wanted 5 seal gas line pentration on roof
|
Pressure Test | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | PASS |
Brian Scoles
|
|
|
Dwayne Phone #: ###-####- 20lb gas pass tagged meter location
|
Final | 8/30/2019 | 9/3/2019 | 9/3/2019 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-####- class 2 hoods shall over hang 6" minimum all sides of equipment- need to install duct work per prints missing registers- is exhaust duct from class 2 hood SS per prints- will need air balance report also
|