Mec-Aging Inspection | 5/25/2020 | 5/25/2020 | 5/26/2020 | | PASS |
Jack Reynolds
|
|
|
Doc Permit Finaled ok
|
DOC - Permit Finaled | 5/26/2020 | 5/26/2020 | 5/26/2020 | A | PASS |
Jack Reynolds
|
|
|
Doc Permit Finaled ok
|
Pressure Test | 10/30/2019 | 10/31/2019 | 10/31/2019 | A | PASS |
Jack Reynolds
|
|
|
Inspection requested via web by Andrea Creek - 20lb gas pressure test in mech room ok
|
Pressure Test | 10/26/2019 | 10/28/2019 | 10/28/2019 | A | PART |
Jack Reynolds
|
|
|
Thanks, Jeff Creek ###-#### Phone #: ###-#### Inspection requested via web by Andrea Creek - 20lb gas pressure test ok - contractor stated new CSST from will be ran to furnace. Need to see a pressure test on new piping added into mech room
|
Pressure Test | 10/23/2019 | 10/24/2019 | 10/24/2019 | A | FAIL |
Jack Reynolds
|
|
|
MOVED GAS LINE NEED PRESSURE TEST Phone #: ###-#### Inspection requested via web by Andrea Creek - gas line in shop was under 20lb - under ground gas line 20lb ok backfill ok - need to verify gas meter is sized properly for new load
|