MIS-Aging Inspection | 7/14/2020 | 7/14/2020 | 7/15/2020 | | CANC |
Tell Riley
|
|
|
|
MIS-Aging Inspection | 4/14/2020 | 4/14/2020 | 4/16/2020 | | CANC |
Tell Riley
|
|
|
|
MIS-Aging Inspection | 1/14/2020 | 1/14/2020 | 1/15/2020 | | CANC |
Tell Riley
|
|
|
does not look like issue was resolved//
|
ELE-Conference | 3/22/2019 | 3/25/2019 | 3/25/2019 | A | DONE |
Daryl DeGrange
|
|
|
No Access
|
ELE-Conference | 3/21/2019 | 3/22/2019 | 3/22/2019 | A | FAIL |
Rock A. Hudson
|
|
|
Check back, still no ELE permit. Boise City Ordinance Section 4-05-18 ELECTRICAL PERMIT REQUIRED Before any person installs or alters any electrical wiring, equipment, apparatus or fixture, they shall file a permit application with the Electrical Section. 1st notice posted 2-19-19. 2nd notice posted 2-26-19. 3rd notice posted 3-15-19. Must apply for electrical permit. Electrical contractor must then schedule conference. Stop work order posted, tag parcel, double fees applied.
|
PLM-Conference | 2/26/2019 | 2/26/2019 | 2/26/2019 | P | DONE |
Matt Wrobel
|
|
|
any questions call Jim Sly no access all plumbing work must be permitted double permit fee will be required
|
MEC-Conference | 2/26/2019 | 2/26/2019 | 2/26/2019 | P | DONE |
Jack Reynolds
|
|
|
Any questions call Jim Sly - no access to home - any mechanical working being performed needs a permit
|
ELE-Conference | 2/26/2019 | 2/26/2019 | 2/26/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Any questions call Jim Sly No access. Told by individual on site new wiring to micro and dishwasher at least. No permit yet.
|
BLD-Conference | 2/26/2019 | 2/26/2019 | 2/26/2019 | P | CANC |
Jim Sly
|
|
|
|