INSP-Final | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | DONE |
Troy Cobbley
|
|
|
Permit finaled
RICK FRY Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
DOC - Permit Finaled | | | 10/18/2019 | | DONE |
|
|
|
per Troy C emailed on 10-18-19
|
INSP-Sprinkler Rough-in/Hydro | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping ok to cover. JON HOLMSTEAD Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the two hardlids where the sprinkler piping is ok for cover. Please call Rudy with time frame. Thanks Phone #: ###-#### Inspection requested via web by Jeff Packham
|