Permit Information
Permit NumberPLM18-03158
StatusFinaled
Name RM MECHANICAL
Site Address 8000 S FEDERAL WAY
Project NameMicron B17C Cafeteria Remodel
Customer Number 
ePlanReviewNo
Description
Alteration: Demo and replace some existing sinks and floor drains.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final5/22/20195/23/20195/23/2019APASS
DetailsEric Strole
We would like to schedule a plumbing final inspection for the Micron Building 17C Tray wash. Dakota Potts is the site contact there ###-####. Please contact prior to arrival. Thank you. Phone #: ###-#### Inspection requested via web by RM Mechanical
Final5/22/20195/22/20195/22/2019PNR
DetailsEric Strole
We would like to schedule a plumbing final inspection for the Micron Building 17C Tray wash. Dakota Potts is the site contact there ###-####. Please contact prior to arrival. Thank you. Phone #: ###-#### Inspection requested via web by RM Mechanical
Plumbing Rough-in4/29/20194/30/20194/30/2019APASS
DetailsEric Strole
We would like to schedule a wall and rough-in inspection for tomorrow morning at Micron Bldg 17C. Dakota Potts is the site contact ###-####. Thank you. Phone #: ###-#### Inspection requested via web by RM Mechanical
Groundwork4/19/20194/22/20194/22/2019APASS
DetailsEric Strole
We would like to schedule a groundwork inspection for tomorrow afternoon please. Site contact is Dakota Potts ###-####. Please call in advance. Thank you. Phone #: ###-#### Inspection requested via web by RM Mechanical
Groundwork4/18/20194/19/20194/19/2019PNR
DetailsEric Strole
We would like to schedule a groundwork inspection for tomorrow afternoon please. Site contact is Dakota Potts ###-####. Please call in advance. Thank you. Phone #: ###-#### Inspection requested via web by RM Mechanical
Final1/30/20191/31/20191/31/2019ACANC
DetailsEric Strole
We had this final inspection completed and passed by Eric Strole yesterday but ESI did not have the card on site for Eric to sign off. ESI is requesting that the card be signed by jurisdiction so we need him to come back out. Please call Martin Yingling at ###-#### 1 hour prior to arrival. Thank you. Phone #: ###-#### >> Inspection requested via web by RM Mechanical
Final10/29/201810/30/201810/30/2018APART
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by RM Mechanical-Starbucks pass.
Final10/26/201810/29/201810/29/2018PCANC
DetailsEric Strole
Phone #: ###-#### >> Inspection requested via web by RM Mechanical Inspection cancelled from web by: RM Mechanical
Final10/26/201810/26/201810/26/2018PCANC
DetailsEric Strole
Final inspection for the Permit Phone #: ###-#### >> Inspection requested via web by RM Mechanical Inspection cancelled from web by: RM Mechanical
Final10/16/201810/17/201810/17/2018PPART
DetailsEric Strole
Partial final in servery area Phone #: ###-#### Inspection requested via web by RM Mechanical-Cold wells pass. Temp final ok.
Plumbing Rough-in10/2/201810/3/201810/3/2018PPART
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by RM Mechanical-Groundwork and inwall dwv pass.
Pressure Test10/1/201810/2/201810/2/2018PPASS
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by RM Mechanical-Last 20 lb gas test pass.
Other9/26/20189/26/20189/26/2018PDONE
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by RM Mechanical-Conferance on backflows.
Final9/20/20189/21/20189/21/2018APART
DetailsEric Strole
Partial Final for Vending Area Phone #: ###-#### Inspection requested via web by RM Mechanical-Vending area final ok.
Pressure Test9/17/20189/18/20189/18/2018PPASS
DetailsEric Strole
Pressure Test for Natural Gas Phone #: ###-#### Inspection requested via web by RM Mechanical-20 lb gas test pass.
Plumbing Rough-in8/28/20188/29/20188/29/2018PPART
DetailsEric Strole
Water/Sewer rough in (vending area) Phone #: ###-#### Inspection requested via web by RM Mechanical-Vending area pass.
Pressure Test8/24/20188/27/20188/27/2018APART
DetailsEric Strole
Gas pipe rough in Phone #: ###-#### Inspection requested via web by RM Mechanical-20 lb gas test inwall only pass.
Plumbing Rough-in8/24/20188/24/20188/24/2018PPART
DetailsEric Strole
Waste ; Vent Rough in Phone #: ###-#### Inspection requested via web by RM Mechanical-Inwall rough-in pass.
Pressure Test8/24/20188/24/20188/24/2018PFAIL
DetailsEric Strole
Gas pipe rough in Phone #: ###-#### Inspection requested via web by RM Mechanical-20 lb test requires a 30 lb gauge.
Med/Gas Systems8/24/20188/24/20188/24/2018PCANC
DetailsEric Strole
Gas pipe rough in Phone #: ###-#### Inspection requested via web by RM Mechanical
Plumbing Rough-in8/22/20188/23/20188/23/2018ACANC
DetailsEric Strole
Waste ; Vent Wall Rough In Phone #: ###-#### Inspection requested via web by RM Mechanical
Groundwork8/14/20188/15/20188/15/2018PPASS
DetailsEric Strole
Underground Waste ; Vent Phone #: ###-#### Inspection requested via web by RM Mechanical
Groundwork8/13/20188/14/20188/14/2018AFAIL
DetailsEric Strole
Underground Waste ; Vent Phone #: ###-#### Inspection requested via web by RM Mechanical-Need to vent combination waste & vent per the 2017 ISPC.
Water and/or Sewer8/10/20188/13/20188/13/2018PPASS
DetailsEric Strole
Underground Waste ; Vent Phone #: ###-#### Inspection requested via web by RM Mechanical