Case Summary (BLD) | | | 4/7/2003 | | |
|
|
|
|
BLD-Grading Inspection | 7/17/2000 | 7/17/2000 | 7/17/2000 | | PASS |
Rita DeYoung
|
|
|
agreed to allow house final if contractor had an area behind the garage regraded to provide drainage away from house. This has been completed satisfactorally.
|
BLD-Final | 7/12/2000 | 7/13/2000 | 7/13/2000 | A | PASS |
Tony Young
|
|
|
###-#### C of C #19700 issued 7/13/00 1:40:51 PM
|
BLD-Final | 7/10/2000 | 7/11/2000 | 7/11/2000 | P | FAIL |
Tony Young
|
|
|
dennis ###-#### fn Need T.R. sign off. 7/12/00 10:39:34 AM
|
BLD-Final | 7/7/2000 | 7/10/2000 | 7/10/2000 | A | FAIL |
Tony Young
|
|
|
dennis ###-#### Need Terry Records signoff & mec. & misc. items to finish. 7/11/00 11:49:58 AM
|
BLD-Final | 7/6/2000 | 7/7/2000 | 7/7/2000 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/06/2000 at 13:15:41. Contact: ###-####. Canel re-call when mec. is done. 7/10/00 9:47:09 AM
|
BLD-Framing/Rough-in | 5/15/2000 | 5/16/2000 | 5/16/2000 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### No repair doc's 5/16/00 1:22:28 PM
|
BLD-Framing/Rough-in | 5/16/2000 | 5/16/2000 | 5/16/2000 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 5/12/2000 | 5/15/2000 | 5/15/2000 | P | CANC |
Tom Arcoraci
|
|
|
###-#### Unable to respond by 5pm 5/16/00 9:56:50 AM
|
BLD-Energy code compliance | 5/5/2000 | 5/8/2000 | 5/8/2000 | P | PART |
Jim Storey
|
|
|
3 idems required verifacation ok to rock all areas but c/n areas. 5/8/00 5:23:43 PM
|
BLD-Energy code compliance | 5/5/2000 | 5/8/2000 | 5/8/2000 | P | PART |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/4/2000 | 5/5/2000 | 5/5/2000 | P | PART |
Jim Storey
|
|
|
###-#### call first after 1 c/n holes in truss and mlb need engineering. 5/5/00 3:18:14 PM
|
BLD-Framing/Rough-in | 4/20/2000 | 4/21/2000 | 4/21/2000 | A | FAIL |
Jim Sly
|
|
|
###-#### Need sprinkler R/I prior to frame 4/21/00 2:00:41 PM
|
BLD-Foundation | 3/9/2000 | 3/10/2000 | 3/10/2000 | P | PASS |
Russ Owen
|
|
|
###-#### Ok letter from soilds engineer. 3/14/00 11:12:48 AM
|
BLD-Footing | 3/8/2000 | 3/8/2000 | 3/8/2000 | P | PART |
Russ Owen
|
|
|
###-#### Needs soils letter of compliance from engineer, also enlarged footings are not inplace at locations shown on plans, contractor said he will dig these out. 3/9/00 2:13:30 PM
|
Issue PAID IN FULL permit | | | 3/8/2000 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 2/14/2000 | 2/14/2000 | 2/22/2000 | | PASS |
Dan Overy
|
|
|
2/22/2000 09:23:38 DJO - activity updated through activity BLDA022 from case BLD00-00028.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/22/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/22/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/22/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 2/14/2000 | | DONE |
|
|
|
plans have been approved and ready for issuance as soon as 10 day appeal period ends (02-22-2000)
|
Plans ACCEPTED BY PLAN CHECK | | | 2/14/2000 | | |
|
|
|
|
Routing - PUBLIC WORKS | 1/5/2000 | 1/5/2000 | 2/9/2000 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 1/5/2000 | 1/5/2000 | 2/8/2000 | | PASS |
Rita DeYoung
|
|
|
took to terry records 1/5/00
Grading plan indicates driveway grades up to 40%. Contacted contractor to tell him the driveway must be redesigned. He said that that they have already taken four feet off of the lot pad to lessen the steepness of the driveway. I told him this grading must be permitted and should have been before it was done.
Approved grading and drainage plan.
|
Application received | | | 1/5/2000 | | |
|
|
|
|
Routing - PLANNING | 2/9/2000 | 2/9/2000 | | | PEND |
|
|
|
took to tom curren 2/9/00
|
Plan Review Report | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Pending Assignment by DJO | 1/5/2000 | | | | PEND |
Dan Overy
|
|
|
took to terry records 1/5/00
|
Case Summary (BLD) | | | | | |
|
|
|
|
Telephone Call | | | | | |
|
|
|
left mess that permit is ready
|