Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-00048
StatusFinaled
Name COLLIER KELLY
Site Address 8300 W OVERLAND RD
Project NameWAL-MART EXPANSION
Customer Number 
ePlanReviewNo
Description
WAL-MART SUPERSTORE EXPANSION * TO CONSTRUCT AN 80, 885 SQ. FT. ADDITION TO THE EXISTING WAL-MART STORE. THE ADDITION WILL BE TO THE SOUTH, WEST AND WEST HALF OF THE NORTH SIDES OF THE EXISTING BUILDING. THIS PERMIT ALSO INCLUDES THE REMODEL OF THE EXISTING PORTIONS OF THE BUILDING AND GARDEN CENTER AREAS PER THE APPROVED PLANS. THE ADDITION WILL INCLUDE A NEW GROCERY RETAIL AREA, BANK TENANT, VISION CENTER, FUTURE TENANT SPACE AND ENLARGED STOCK AND RECEIVING AREAS, AS WELL AS RELOCATION OF THE PHARMACY AND McDONALD'S RESTAURANT AREAS. CONSTRUCTION TO MATCH EXISTING BUILDING; MASONRY EXTERIOR WALLS, STEEL FRAME COLUMNS AND ROOF STRUCTURE. THIS BUILDING IS FULLY FIRE SPRINKLED. THIS IS A V-N CONSTRUCTION, UNLIMITED AREA BUILDING. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. PC#010-00/DRH99-00170/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/17/2003  
Telephone call  4/18/2001 DONE
final cert
Permanent Occupancy 3/22/20013/22/2001 DONE
Details
BLD-Final3/21/20013/22/20013/22/2001APASS
DetailsRuss Owen
###-####ok for perm oc,letter from engimneer and special inspection ok . 3/22/2001 11:29:23 AM
DOC - Permit Finaled3/22/20013/22/20013/22/2001APASS
DetailsRuss Owen
Added by Inspector: 407 On 3/22/2001 11:29:57 AM
Permanent occupancy  3/22/2001 DONE
Perm. Occ. Cert. #8602 issued 3-22-01 to wal-Mart Super Store (addn.)
Code Occupancy Approval  3/20/2001 PASS
Final Inspection - Signed off - complies with drh99-00170
Fee Review-notes1/7/20001/7/20003/19/2001 DONE
were is the plumbing permit
Temporary occupancy  3/14/2001 PART
Temp. Occ. Cert. #4524 issued 3-14-01 to Wal-Mart (expansion).
BLD-Final3/12/20013/13/20013/13/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/12/2001 at 16:59:34. Contact: ###-####.ok temp oc. need letter from MTI-Engineer to approve letter . also rear trash compactor area has racks that need bolts. also need perm oc from zoning.all others have signed perm. 3/14/2001 10:02:17 AM
Code Occupancy Approval  3/13/2001 FAIL
Inspected for Final - Bonded for Temporary to complete landscaping. n Signed Temporary 3/13/01
Print Occupancy Form  3/12/2001 DONE
BLD-Final3/6/20013/8/20013/8/2001AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/06/2001 at 15:34:50. Contact: ###-####.needs achd, zoning,repair 3 rear exit corridors,racking missing bolts,mti final letter. 3/8/2001 11:33:59 AM 3/8/2001 11:34:10 AM
Code Occupancy Approval  3/8/2001 FAIL
Inspection made for occupancy - NOT READY. Contacted Miles w/ ESI - left message - still have some landscaping to complete - striping at parking to the rear of the bldg - northeast corner - can't see the landscape planter at the south side of the building - planter is covered by garbage can lids, hoses and misc. items. Asked him if he could have Walmart move stuff off of planter so I could see what was actually there for plants.
FIRE-Final Inspection3/6/20013/7/20013/7/2001APASS
DetailsJoe Tawney
Reinsp OK for permanant occupancy 3/7/2001 1:04:10 PM
FIRE-Final Inspection3/1/20013/2/20013/2/2001PFAIL
DetailsJoe Tawney
###-####. 3/2/2001 12:30:03 PM Final Fail C/N issued 3/5/2001 8:14:48 AM
BLD-Framing/Rough-in2/1/20012/2/20012/2/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/01/2001 at 16:19:28. Contact: ###-####.ok to sheetrock sofit at front of store ,check stands. 2/2/2001 12:19:04 PM
BLD-Framing/Rough-in2/1/20012/1/20012/1/2001PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/01/2001 at 09:59:50. Contact: ###-####.
BLD-Framing/Rough-in1/26/20011/29/20011/29/2001APART
DetailsRuss Owen
ceiling grid miles ###-#### break room . 1/29/2001 1:04:44 PM
Override - Parcel Holds  1/26/2001  
FIRE-Alarm Testing1/22/20011/23/20011/23/2001APART
DetailsJoe Tawney
###-#### ext 55371 Richard OK on alarm test except for 2 Ansul systems not yet installed. 1/23/2001 4:53:34 PM
BLD-Framing/Rough-in12/21/200012/22/200012/22/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/21/2000 at 07:55:48. Contact: ###-####.ok to drop ceiling tile in bakery.ok to cover walls in east end smoking room and complete exit corridor in adjacent area. 12/22/2000 10:03:04 AM
FIRE-Final Inspection11/20/200011/20/200011/20/2000PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/20/2000 at 08:28:33. Contact: ###-####. okay to occupy MacDonalds only 11/20/2000 4:43:22 PM
FIRE-Final Inspection11/16/200011/17/200011/17/2000PFAIL
DetailsJoe Tawney
###-####. Reinsp Fail Electrics under hood and taped spklr heads 11/17/2000 7:24:22 PM
BLD-Final11/14/200011/15/200011/15/2000PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/14/2000 at 16:39:25. Contact: ###-####. 11/15/2000 4:10:33 PM ok to occ mac ds and use front door by mac ds 11/15/2000 4:31:21 PM
Plan resubmittals received  11/9/2000 DONE
received two copies of revised sheetsCS1, A1, A5, A5.5, TS1, E1.2, E2.2 E3.2. ROUTED TO CARL D. KMM
FIRE-Final Inspection11/6/200011/7/200011/7/2000PFAIL
DetailsJoe Tawney
###-####. Fail Taped heads, door hdwre, possible overspacing 11/8/2000 8:01:26 AM
BLD-Final11/6/200011/7/200011/7/2000PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/06/2000 at 15:33:58. Contact: ###-####.
BLD-Conference11/7/200011/7/200011/7/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/7/2000 1:24:20 PM w/ bldr re final
BLD-Final11/2/200011/3/200011/3/2000ACANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/02/2000 at 08:46:58. Contact: ###-####. Recalled for Carl D. PM. 11/3/2000 12:10:06 PM
BLD-Final11/3/200011/3/200011/3/2000PFAIL
DetailsCarl Dependahl
fn per jim sly; keep c/n, need fire& details requested re grease duct 11/3/2000 4:47:36 PM
BLD-Framing/Rough-in10/16/200010/17/200010/17/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/16/2000 at 14:51:35. Contact: ###-####. 10/17/2000 9:40:43 AM 10/17/2000 10:24:01 AM wip 10/17/2000 12:42:34 PM
BLD-Framing/Rough-in10/13/200010/16/200010/16/2000ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/13/2000 at 14:09:01. Contact: .
BLD-Conference10/13/200010/13/200010/13/2000PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/13/2000 w/ supt re c/n of 10-12...detail to be onsite; need furthter info re grease duc/shaft.
BLD-Framing/Rough-in10/11/200010/12/200010/12/2000AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/11/2000 at 16:36:12. Contact: .c/n re walls at McDonalds area. 10/12/2000 4:22:26 PM
BLD-Conference10/11/200010/11/200010/11/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/11/2000 w/new supt re insp process
BLD-Framing/Rough-in9/29/200010/2/200010/2/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/29/2000 at 12:14:55. Contact: ###-####. ok to cover fixture storage & mop sink 10/2/2000 4:27:10 PM
BLD-Framing/Rough-in9/25/20009/26/20009/26/2000AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/25/2000 at 11:23:53. Contact: .
part ok to cover deck at west entry& overhang; c/n issued re corridor at storeroom 9/26/2000 4:23:09 PM
BLD-Framing/Rough-in8/29/20008/30/20008/30/2000AFAIL
DetailsCarl Dependahl
wall mark ###-####; rear corridor; c/nre lid detail. possible stop work for masons...no calls for insp to our office w/ w.i.p. 8/30/2000 3:10:05 PM
BLD-Other8/21/20008/21/20008/21/2000PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/21/2000 at 11:08:25. Contact: ###-####.called in error, plbg insp??? 8/21/2000 4:20:44 PM
BLD-Framing/Rough-in7/20/20007/21/20007/21/2000ACANC
DetailsJim Sly
ceiling grid as per Jim Sly mark ###-####
BLD-Framing/Rough-in7/21/20007/21/20007/21/2000APART
DetailsJim Sly
Ceiling components ok except (spot check) spacer bars at final ceiling insp. 4-5 (front) occupancies.
BLD-Framing/Rough-in7/20/20007/20/20007/20/2000PNR
DetailsCarl Dependahl
ceiling grid---###-#### mark
BLD-Other7/12/20007/12/20007/12/2000PFAIL
DetailsCarl Dependahl
Mark; ###-####. Ceiling; seismic, accustical- inspection. Install seismic stuff & recall. 7/13/00 11:35:20 AM
BLD-Framing/Rough-in7/7/20007/7/20007/7/2000PPART
DetailsCarl Dependahl
masonry pouring at 1:30 no phone number Clifford
BLD-Concrete6/29/20006/30/20006/30/2000APART
DetailsDixie Fellows
will be on site spec inspector on site 6/30/00 8:33:27 AM
BLD-Foundation6/28/20006/29/20006/29/2000APART
DetailsCarl Dependahl
grout pour clifford no phone W.I>P. MTI onsite for masonry 6/30/00 8:14:42 AM
BLD-Footing6/28/20006/28/20006/28/2000PPART
DetailsCarl Dependahl
Lonnie ###-#### Mti onsite-some discrepancy noted on report of 6-13 Re: compaction 6/29/00 10:00:29 AM
BLD-Final6/28/20006/28/20006/28/2000PFAIL
DetailsCarl Dependahl
temp occ mark ###-####
BLD-Footing6/28/20006/28/20006/27/2000PFAIL
DetailsCarl Dependahl
multiple insp's; c/n re "final" or occupancy for garden ctr... need fire
BLD-Foundation6/26/20006/27/20006/27/2000ADONE
DetailsTom Arcoraci
pour at 7:30 ###-####
BLD-Footing6/27/20006/27/20006/27/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/27/2000 at 07:34:25. Contact: ###-####. MTI onsite 6/28/00 2:06:59 PM MTI onsite, pending reports 6/28/00 2:13:29 PM
BLD-Foundation6/23/20006/26/20006/26/2000APART
DetailsCarl Dependahl
masonary insp---esi--###-#### spoke w/ mason- all insps to be called to office 6/27/00 2:33:12 PM
FIRE-Sprinkler Rough-in6/22/20006/22/20006/22/2000PFAIL
DetailsJoe Tawney
Mark ###-#### Not ready for sprinkler R/I no plans on site. 6/23/00 11:23:27 AM
BLD-Framing/Rough-in6/21/20006/21/20006/21/2000PFAIL
DetailsCarl Dependahl
wall insp--mark ###-#### Partial insp. phase 1; C/N: bulkhead attachment etc. 6/22/00 9:36:51 AM
BLD-Framing/Rough-in6/16/20006/19/20006/19/2000PPART
DetailsCarl Dependahl
Mark ###-#### need eng.'s ok for structure; ok to "1side" walls. Submit changes. 6/21/00 11:18:32 AM
FIRE-Sprinkler Rough-in5/18/20005/19/20005/19/2000APART
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 05/18/2000 at 15:38:57. Contact: ###-####. Ok to cover supply line on North center of building. 5/22/00 10:47:32 AM
BLD-Concrete5/19/20005/19/20005/19/2000PNR
DetailsCarl Dependahl
Insp. @ around 1:00. Lonnie- ###-#### Called, left msg....no response. 5/22/00 11:38:17 AM
BLD-Other5/17/20005/18/20005/18/2000AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/17/2000 at 16:27:21. Contact: ###-####. Recall; Req'd in error?? 5/22/00 9:29:39 AM
FIRE-Final Inspection5/18/20005/18/20005/18/2000PPART
DetailsJoe Tawney
###-#### Ok to cover supply line at North center & NW corner of facility 5/22/00 9:15:02 AM
FIRE-Sprinkler Rough-in5/12/20005/15/20005/15/2000APART
DetailsJoe Tawney
###-#### Ok to cover supply line at NE corner of bldg. 5/15/00 2:58:11 PM
FIRE-Sprinkler Rough-in5/11/20005/12/20005/12/2000ACANC
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 05/11/2000 at 15:53:54. Contact: ###-####. Inspection cancelled to be rescheduled. 5/12/00 2:05:03 PM
FIRE-Sprinkler Rough-in5/11/20005/12/20005/12/2000PPART
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 05/11/2000 at 16:49:35. Contact: ###-####. Ok to cover (2) thrust blocks on north side. 5/12/00 2:05:25 PM
BLD-Framing/Rough-in5/12/20005/12/20005/12/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/12/2000 at 07:07:59. Contact: ###-####. Roof deck..has MTI onsite. 5/15/00 11:05:35 AM
FIRE-Sprinkler Rough-in5/10/20005/11/20005/11/2000APART
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 05/10/2000 at 14:39:04. Contact: ###-####. Partial supply line cover at NE corner of bldg. 5/11/00 2:41:39 PM
BLD-Framing/Rough-in5/11/20005/11/20005/11/2000PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/11/2000 at 07:54:47. Contact: ###-####. Unable to contact- left msg. 5/12/00 9:51:37 AM
BLD-Concrete4/27/20004/28/20004/28/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/27/2000 at 13:16:06. Contact: . Pend. spec. insp. reports 4/28/00 3:04:00 PM
BLD-Footing4/27/20004/28/20004/28/2000APART
DetailsCarl Dependahl
###-#### Pend. spec. insp. reports. 4/28/00 3:03:37 PM
BLD-Concrete4/25/20004/26/20004/26/2000APART
DetailsCarl Dependahl
rebar ###-#### Pend. sp. insp. reports. 4/28/00 8:40:30 AM
BLD-Footing4/26/20004/26/20004/26/2000PPART
DetailsCarl Dependahl
###-#### Pend. sp. insp. report. 4/28/00 8:43:21 AM
BLD-Concrete4/24/20004/25/20004/25/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/24/2000 at 13:47:49. Contact: . Maonry, met w/Mickleson onsite. pend MTI's report. 4/26/00 11:21:23 AM
BLD-Concrete4/19/20004/20/20004/20/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/19/2000 at 12:17:27. Contact: ###-####. Pend. spec. insp. reports. ext. wall ftg's. 4/26/00 11:12:14 AM
BLD-Footing4/17/20004/18/20004/18/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/17/2000 at 13:28:44. Contact: ###-####. MTI onsite met w/supt. & subs. for conc. & masonry. 4/19/00 9:20:05 AM
BLD-Conference4/11/20004/11/20004/11/2000APART
DetailsBill VanDegrift
Added by Inspector: 330 On 4/11/00 engineer to resubmit site plan showing 8" sewer instead of 21" sewer, grade apx .5%
Routing Off Site - A.C.H.D3/22/20003/22/20003/22/2000 DONE
brought in impact certificate for new Walmart 00-09867 paid for on 3-22-00
Issue PAID IN FULL permit  3/22/2000 DONE
Plan resubmittals received  3/20/2000 DONE
PLAN RESUBMITTALS RECEIVED FROM PERRY L. BUTCHER AND ASSOCIATES, ARCHITECTS, RECEIVED TWO SETS OF A, P, M, AND E SHEETS AND MISC. OTHERS, AND SMALL DOCUMENTS, FORWARDED ALL TO JOHN MENARD.3/20/00 DAR
Routing - PLAN CHECK2/18/2000 3/6/2000 PASS
PLANS APPROVED FOR ISSUE, SUBJECT TO AGREED UPON RESUBMITTALS TO BE FORWARDED TO THIS OFFICE WITHIN THE WEEK.
PLANS/APPL TAKEN TO FRONT DESK  3/6/2000 PASS
Print Occupancy Form  3/6/2000 DONE
Inspection Record Card- Bld  3/6/2000 DONE
Telephone call  3/6/2000 DONE
called talked to jill -told her about achd was needed before picking up the permit.
Plan assigned to (JCM)1/8/2000 3/6/2000 PASS
DetailsJohn Menard
3/6/00 15:30:08 JCM - activity updated through activity BLDA022 from case BLD00-00048.
Plan resubmittals requested  2/29/2000 PEND
E-mailed Jill Styron and copied Doug Hurley and Phil Harlan at Perry L. Butcher Architects. Also faxed a copy of the resubmittal request to Jill Styron 3/1/00.
Plan resubmittals received  2/24/2000 DONE
RECEIVED TWO COPIES REVISED SHEETS C-1.0, SP1, A1, A5, A5.1, A6.1, PH1, CS1, GA1, GA3, MK1, MM1, P1, P2, M1, M2, M4, M5, GP1, GP3, GP4, GP5, GP6, GM2, E1, E1.1, E1.2, E1.3, E2, E2.1, E2.2, E2.4, EM1, FA1, AND TWO COPIES OF RESPONSE LETTER. ROUTED TO JOHN M. KMM
Routing - FIRE2/16/20002/17/20002/17/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  2/17/2000 PASS
DetailsBill Alexander
Routing - PLAN CHECK1/27/2000 2/16/2000 PEND
Plan resubmittals requested  2/16/2000 PEND
E-MAILED JILL STYRON AT PERRY L. BUTCHER ARCHITECTS WITH ATTACHED COMMENT LIST AND REQUESTED REVISIONS.
Received Certificate of Value  2/9/2000 DONE
RECIEVED REVISED CERT. OF VALUE PROJECT VALUE $4,761,200 ELECT. #128,298.50 PLUMB. $97,494.00 MECH. $101,556.80 FIRE SPRINKLER $52,809.00.
RECEIVED CERT. OF VALUE FOR THE FOUNDATION PERMIT. PROJECT VALUE $338,800 ELECT. $100,000 PLUMB. $121,660.00 MECH. FIRE SPRINKLER N/A KMM ROUTED ALL TO JOHN M AND FILE. KMM
Routing Off Site - STRUCTURAL1/11/2000 2/7/2000 PASS
REQUIRES STRUCT. CALCS. CONTACTED PHIL OF THIS NEED. KMM
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
1/11/2000 RECEIVED STRUCT. CALCS. CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
2/4/2000 CONTACTED PDQ TO TAKE REVISED PLANS TO OUTSIDE ENG. KMM
Plan resubmittals received  2/7/2000 DONE
RECEIVED ONE COPY OF REVISED STRUCT. SHEETS S2,24, & S2.1 ROUTED TO JOHN M. KMM
Plan resubmittals received  2/4/2000 DONE
RECEIVED STRUCTURAL PLAN RESUBMITTALS CACULATIONS, SHEETS S2,S2.1 AND S4, FORWARDED SAME TO JOHN MENARD. 2/4/00 DAR
ONLY RECEIVED TWO COPIES. JOHN IS REQUESTING THREE. CONTACTED JILL STYRON OF THIS NEED. KMM
Additional plans submitted  2/4/2000 DONE
RECEIVED ONE COPY OF STRUCT. PLANS WITH A LETTER ADDRESSED TO JOHN M. REQUESTING A FOUNDATION PERMIT.STILL REQUIRES A CERT. OF VALUE PLUS REVISED FOR THE BUILDING. MINUS THE FOOTING/ FOUNDATION ROUTED TO JOHN M.
Routing - PLUMBING1/20/2000 1/26/2000 PASS
ROUTE TO PUBLIC WORKS WHEN BACK FROM PLUMB. KMM
Routing - PUBLIC WORKS1/26/2000 1/26/2000 PASS
Telephone call  1/24/2000 DONE
RECEIVED CALL FROM JILL STYRON AND KELLY COLLIER REGARDING FOUNDATION PERMIT. I REQUESTED A LETTER BE WRITTEN TO JOHN MENARD REGARDING SCOPE OF WORK AS WELL AS A CERT. OF VALUE AND REVISED CERT OF VALUE FOR THE ADDITION. AND A SET OF PLANS THEY WERE TOLD THAT THE GRADING PERMIT WOULD HAVE TO BE ISSUED BEFORE FOUNDATION PERMIT CAN BE GRANTED. KMM
Routing - PLANNING1/18/2000 1/20/2000 PASS
Approved per CUP99-099 & CUP99-146 and DR99-170 & DR99-251
Routing - PUBLIC WORKS1/10/2000 1/18/2000 FAIL
REQUIRES DRAINAGE PLAN PER BRIAN MURPHY. 1/18/00 DAR
Plan routing begun/NEW & ADDTN  1/10/2000  
Plans ACCEPTED BY PLAN TECH  1/8/2000 DONE
Plans were submitted without civil or landscape plans. spoke with Tempra about landscape plans and Brian about civil sheets. They were told these sheets were submitted with the grading and drainage permit Bld99-03717. kmm
Received Certificate of Value  1/7/2000 DONE
Application received  1/7/2000  
Routing Off Site - C.D.H12/28/1999 12/28/1999 PASS
Recd Pcfee & Taken To Pln CK