Case Summary (BLD) | | | 1/2/2001 | | DONE |
|
|
|
|
BLD-Final | 6/19/2000 | 6/19/2000 | 6/19/2000 | P | PASS |
Russ Owen
|
|
|
Matt ###-####
|
BLD-Energy code compliance | 3/20/2000 | 3/21/2000 | 3/21/2000 | A | PART |
Russ Owen
|
|
|
Andy ###-#### No correction notice found for prior framing corrections. 3/21/00 4:17:52 PM
|
BLD-Framing/Rough-in | 3/20/2000 | 3/21/2000 | 3/21/2000 | A | FAIL |
Russ Owen
|
|
|
Andy ###-#### No prior correction notice found, called number but no answer, as requested as a re-inspection. 3/21/00 4:18:23 PM
|
BLD-Framing/Rough-in | 3/17/2000 | 3/20/2000 | 3/20/2000 | P | PASS |
Wes Worcester
|
|
|
late pm reinspection dennis ###-####
|
BLD-Energy code compliance | 3/17/2000 | 3/20/2000 | 3/20/2000 | P | PASS |
Wes Worcester
|
|
|
late pm dennis ###-####
|
BLD-Framing/Rough-in | 3/16/2000 | 3/17/2000 | 3/17/2000 | A | FAIL |
Wes Worcester
|
|
|
###-#### Truss engineering, crawl insulation reversed 3/20/00 10:22:59 AM
|
BLD-Framing/Rough-in | 3/6/2000 | 3/7/2000 | 3/7/2000 | A | PART |
Wes Worcester
|
|
|
MATT ###-#### SHEAR WALL-CALL 1ST BEFORE INSP Shear & nail #5 per approved plan- all other shear ok. 3/7/00 11:30:05 AM
|
BLD-Foundation | 1/28/2000 | 1/28/2000 | 1/28/2000 | P | PASS |
Russ Owen
|
|
|
found wall ---chris ###-#### 2# 4 bars in all walls 1/31/00 1:09:10 PM
|
BLD-Footing | 1/26/2000 | 1/27/2000 | 1/27/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/26/2000 at 11:45:43. Contact: ###-####. poured before inspection no plans or people on site cant locate property pins work appears ok 1/27/00 3:16:48 PM
|
BLD-Foundation | 1/27/2000 | 1/27/2000 | 1/27/2000 | P | PASS |
Russ Owen
|
|
|
chris ###-#### nothing there 1/28/00 1:35:57 PM footing dupplicate insp 1/28/00 1:36:35 PM
|
Inspection Record Card- Bld | | | 1/25/2000 | | DONE |
|
|
|
|
Telephone call | | | 1/25/2000 | | DONE |
|
|
|
left message gave dollar amount
|
Issue PAID IN FULL permit | | | 1/25/2000 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 1/19/2000 | | 1/25/2000 | | PASS |
Steve Munroe
|
|
|
1/25/2000 10:47:30 DJO - activity updated through activity BLDA022 from case BLD00-00055.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/25/2000 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/25/2000 | | DONE |
|
|
|
|
Pending Assignment by DJO | 1/10/2000 | | 1/19/2000 | | DONE |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 1/10/2000 | 1/10/2000 | 1/11/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 1/10/2000 | 1/10/2000 | 1/10/2000 | | DONE |
|
|
|
|
Application received | | | 1/10/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 1/11/2000 | 1/11/2000 | | | PEND |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
Called designer to inform him that I need to talk to the engineer, who won't be back till Monday. I have questions on the first floor wall bracing. All the walls are not adding up to what the engineer is calling out plus I need the engineer to do calcs. on the hold-downs.
|
Plan Reviewer's activity | | | | | |
|
|
|
ADDITIONAL INFORMATION RECEIVED FROM DAN WINBERG ON SHEAR DEVELOPMENT. ALL EXTERIOR WALLS TO BE SHEATHED WITH OSB.
|