Permit Information
Permit NumberBLD00-00070
StatusFinaled
Name D L EVANS BANK
Site Address 3845 W STATE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
New bank tenant in an existing 4,159 sq.ft. bank building per approved plans on file. Work to include altering restrooms to meet current accessibility standards, accessibility upgrade work (3' doors, lever hardware), new portion of exterior wall and new drive-up window affecting the exterior appearance, some new interior walls with doors and windows, interior finish, seismic bracing upgrade for existing suspended ceiling, plumbing, mechanical, and electrical work. NOTE: Previous tenant was U.S. Bank. (P.C.#016-00) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  10/2/2012 DONE
DetailsTisha Gallop
never issued a C of O originally, ok to issue now per Rita; all required inspections has passed. Mailed hard copy of C of O to tenant.
Case Summary (BLD)  10/2/2012 DONE
DetailsTisha Gallop
Letter of compliance  8/4/2000 DONE
Letter of Compliance #18536 issued 8-4-00.
BLD-Final8/3/20008/3/20008/3/2000PPASS
Details
###-#### work complete ok to sign perm col and issue c/o 8/4/2000 8:22:07 AM
BLD-Final6/22/20006/22/20006/21/2000PPASS
DetailsJoe Tawney
reinsp ok for permanant occupancy
Temporary occupancy  5/3/2000 PART
Temp. Occ. cert. #4010 issued 5-3-00 to D. L. Evans Bank.
BLD-Final4/27/20004/28/20004/28/2000APART
DetailsJim Storey
Dale ###-#### plm and safteyglass 4/28/00 3:00:53 PMok for temp. 4/28/00 3:56:16 PM
FIRE-Final Inspection4/26/20004/26/20004/26/2000PPART
DetailsJoe Tawney
Final ok for temp. occ.
FIRE-Final Inspection4/25/20004/26/20004/26/2000AFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 04/25/2000 at 12:30:16. Contact: ###-####. Work not complete not ready for inspection. 4/26/00 3:35:38 PM
FIRE-Final Inspection4/26/20004/26/20004/26/2000PPART
DetailsJoe Tawney
dale ###-#### Final ok for temp. occ. 4/28/00 8:45:35 AM
BLD-Framing/Rough-in4/14/20004/17/20004/17/2000APART
DetailsTom Arcoraci
###-#### Grip ok 4/17/00 1:23:48 PM
BLD-Conference4/12/20004/13/20004/13/2000APART
Details
dale ###-#### reviewed the project with the super resubs on the jobsite approved by jb 04/13/2000
Plan Reviewer's activity  4/12/2000 PASS
On 4/12/2000 floor plan changes were submitted for this project. Floor plan changes make occupant load at 29 persons, only one exit required still. All notes and attachments on original approved plans are still valid. Changes approved and applicant instructed to submit resubmittal drawings through the structural field inspector.
Plan resubmittals received  4/11/2000 DONE
PLAN RESUBMITTALS RECEIVED FROM OLSON AND ASSOCIATES, GEORGE SLAUGHTER, FORWARDE SAME TO JASON BLAIS. TWO SETS OF SHEETS A1.0, A2.0, A3.0, A4.0,A5.0 AN A6.0, PLUS SMALL DOCUMENTS. 4/11/00 DAR
BLD-Framing/Rough-in3/27/20003/27/20003/27/2000PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/27/2000 at 10:50:03. Contact: . Interior only. 3/28/00 9:13:47 AM
BLD-Framing/Rough-in3/23/20003/24/20003/24/2000PFAIL
DetailsRuss Owen
###-#### No approved plans 3/27/00 4:20:37 PM
Issue PAID IN FULL permit  2/15/2000 DONE
Routing - FIRE2/4/20002/9/20002/9/2000 PASS
DetailsSam Rogers
Plan Review Completed(1st rev)  2/9/2000 PASS
DetailsSam Rogers
Routing - PLAN CHECK2/9/2000 2/9/2000 PASS
Plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  2/9/2000  
Inspection Record Card- Bld  2/9/2000 DONE
Plan assigned to (JCB)1/19/2000 2/9/2000 PASS
DetailsJason Blais
Telephone call  2/9/2000 DONE
left mess that permit is ready
Routing - PLAN CHECK1/20/2000 2/4/2000 PEND
Plan review sent to architect. No response required. Permit issuance dependant on fire department approval. Plans routed to fire dept.
Plan resubmittals received  2/4/2000 DONE
RECEIVED TWO COPIES OF REVISED PLANS. ROUTED TO JASON B.
Meeting  2/2/2000  
Met with George Slaughter, architect's representative and went over preliminary review. Immediate resubmittal drawings required prior to a formal review. Several items missing or incorrect. Waiting for resubmittal drawings.
Routing - PLANNING1/19/2000 1/20/2000 PASS
Pending Assignment by MYS1/19/2000 1/19/2000 DONE
DetailsMarlene Southard
Plan routing begun/TENANTS  1/19/2000 DONE
Route to PUBLIC WORKS, PLANNING, PLAN CHECK and FIRE.
Routing - PUBLIC WORKS1/12/2000 1/13/2000 DONE
Plan routing begun/TENANTS  1/12/2000  
Plans ACCEPTED BY PLAN TECH  1/12/2000 DONE
Received Certificate of Value  1/11/2000 PASS
Application received  1/11/2000  
Recd Pcfee & Taken To Pln CK  1/11/2000 DONE