Permanent Occupancy | | | 10/2/2012 | | DONE |
Tisha Gallop
|
|
|
never issued a C of O originally, ok to issue now per Rita; all required inspections has passed. Mailed hard copy of C of O to tenant.
|
Case Summary (BLD) | | | 10/2/2012 | | DONE |
Tisha Gallop
|
|
|
|
Letter of compliance | | | 8/4/2000 | | DONE |
|
|
|
Letter of Compliance #18536 issued 8-4-00.
|
BLD-Final | 8/3/2000 | 8/3/2000 | 8/3/2000 | P | PASS |
|
|
|
###-#### work complete ok to sign perm col and issue c/o 8/4/2000 8:22:07 AM
|
BLD-Final | 6/22/2000 | 6/22/2000 | 6/21/2000 | P | PASS |
Joe Tawney
|
|
|
reinsp ok for permanant occupancy
|
Temporary occupancy | | | 5/3/2000 | | PART |
|
|
|
Temp. Occ. cert. #4010 issued 5-3-00 to D. L. Evans Bank.
|
BLD-Final | 4/27/2000 | 4/28/2000 | 4/28/2000 | A | PART |
Jim Storey
|
|
|
Dale ###-#### plm and safteyglass 4/28/00 3:00:53 PMok for temp. 4/28/00 3:56:16 PM
|
FIRE-Final Inspection | 4/26/2000 | 4/26/2000 | 4/26/2000 | P | PART |
Joe Tawney
|
|
|
Final ok for temp. occ.
|
FIRE-Final Inspection | 4/25/2000 | 4/26/2000 | 4/26/2000 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 04/25/2000 at 12:30:16. Contact: ###-####. Work not complete not ready for inspection. 4/26/00 3:35:38 PM
|
FIRE-Final Inspection | 4/26/2000 | 4/26/2000 | 4/26/2000 | P | PART |
Joe Tawney
|
|
|
dale ###-#### Final ok for temp. occ. 4/28/00 8:45:35 AM
|
BLD-Framing/Rough-in | 4/14/2000 | 4/17/2000 | 4/17/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### Grip ok 4/17/00 1:23:48 PM
|
BLD-Conference | 4/12/2000 | 4/13/2000 | 4/13/2000 | A | PART |
|
|
|
dale ###-#### reviewed the project with the super resubs on the jobsite approved by jb 04/13/2000
|
Plan Reviewer's activity | | | 4/12/2000 | | PASS |
|
|
|
On 4/12/2000 floor plan changes were submitted for this project. Floor plan changes make occupant load at 29 persons, only one exit required still. All notes and attachments on original approved plans are still valid. Changes approved and applicant instructed to submit resubmittal drawings through the structural field inspector.
|
Plan resubmittals received | | | 4/11/2000 | | DONE |
|
|
|
PLAN RESUBMITTALS RECEIVED FROM OLSON AND ASSOCIATES, GEORGE SLAUGHTER, FORWARDE SAME TO JASON BLAIS. TWO SETS OF SHEETS A1.0, A2.0, A3.0, A4.0,A5.0 AN A6.0, PLUS SMALL DOCUMENTS. 4/11/00 DAR
|
BLD-Framing/Rough-in | 3/27/2000 | 3/27/2000 | 3/27/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/27/2000 at 10:50:03. Contact: . Interior only. 3/28/00 9:13:47 AM
|
BLD-Framing/Rough-in | 3/23/2000 | 3/24/2000 | 3/24/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### No approved plans 3/27/00 4:20:37 PM
|
Issue PAID IN FULL permit | | | 2/15/2000 | | DONE |
|
|
|
|
Routing - FIRE | 2/4/2000 | 2/9/2000 | 2/9/2000 | | PASS |
Sam Rogers
|
|
|
|
Plan Review Completed(1st rev) | | | 2/9/2000 | | PASS |
Sam Rogers
|
|
|
|
Routing - PLAN CHECK | 2/9/2000 | | 2/9/2000 | | PASS |
|
|
|
Plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/9/2000 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/9/2000 | | DONE |
|
|
|
|
Plan assigned to (JCB) | 1/19/2000 | | 2/9/2000 | | PASS |
Jason Blais
|
|
|
|
Telephone call | | | 2/9/2000 | | DONE |
|
|
|
left mess that permit is ready
|
Routing - PLAN CHECK | 1/20/2000 | | 2/4/2000 | | PEND |
|
|
|
Plan review sent to architect. No response required. Permit issuance dependant on fire department approval. Plans routed to fire dept.
|
Plan resubmittals received | | | 2/4/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED PLANS. ROUTED TO JASON B.
|
Meeting | | | 2/2/2000 | | |
|
|
|
Met with George Slaughter, architect's representative and went over preliminary review. Immediate resubmittal drawings required prior to a formal review. Several items missing or incorrect. Waiting for resubmittal drawings.
|
Routing - PLANNING | 1/19/2000 | | 1/20/2000 | | PASS |
|
|
|
|
Pending Assignment by MYS | 1/19/2000 | | 1/19/2000 | | DONE |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 1/19/2000 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLANNING, PLAN CHECK and FIRE.
|
Routing - PUBLIC WORKS | 1/12/2000 | | 1/13/2000 | | DONE |
|
|
|
|
Plan routing begun/TENANTS | | | 1/12/2000 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/12/2000 | | DONE |
|
|
|
|
Received Certificate of Value | | | 1/11/2000 | | PASS |
|
|
|
|
Application received | | | 1/11/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/11/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | | | |
|
|
|
|