Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-00080
StatusFinaled
Name STUART ANDERSONS BLACK ANGUS
Site Address 1731 S ENTERTAINMENT AVE
Project NameBLACK ANGUS RESTAURANT
Customer Number 
ePlanReviewNo
Description
STUART ANDERSON BLACK ANGUS RESTAURANT * TO CONSTRUCT A NEW 6,725 S.F. SINGLE STORY RESTAURANT WITH ASSOCIATED SITEWORK. NOTE THIS BUILDING IS FULLY FIRE SPRINKLERED AS REQUIRED PER UBC SECTION 904.2.3.1. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMONT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. MJP DRH99-00156 PC#021-00 GRADING AND DRAINAGE PERMITED UNDER BLD00-00083 UNDER SAME PLANS AS BLD00-00080 KMM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/23/20036/23/20036/23/2003 DONE
Fee Review-notes6/23/20036/23/20036/23/2003 DONE
Fee Review-notes1/12/20001/12/200010/18/2000 DONE
called jeff at ###-#### and left mesg needing final cert.
Permanent Occupancy 8/9/20008/9/2000 DONE
Details
BLD-Final8/8/20008/9/20008/9/2000APASS
DetailsCarl Dependahl
Jeff ###-####
Permanent occupancy  8/9/2000 DONE
Perm. Occ. Cert. #8326 issued 8-9-00 to the Black Angus Restaurant.
BLD-Final8/4/20008/7/20008/7/2000AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/04/2000 at 14:56:52. Contact: ###-####. not ready 8/7/2000 11:57:05 AM
BLD-Final8/7/20008/7/20008/7/2000PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/07/2000 at 10:04:20. Contact: ###-####.
Temporary occupancy  8/7/2000 DONE
Temp. Occ. Cert. #4047 issued 8-7-00 to Stuart Anderson's Black Angus.
Code Occupancy Approval  8/7/2000 PASS
Meets compliance with DRH99-00156 - PASS
BLD-Final8/3/20008/4/20008/4/2000AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/03/2000 at 12:39:40. Contact: ###-####. need elec & fire, no insp 8/4/2000 3:23:19 PM
FIRE-Final Inspection8/3/20008/4/20008/4/2000APASS
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 08/03/2000 at 17:18:54. Contact: ###-####. Reinsp. ok for perm. occ. 8/7/00 8:38:06 AM
FIRE-Final Inspection8/2/20008/3/20008/3/2000PFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 08/02/2000 at 07:28:06. Contact: ###-####. Reinsp. fail alarm system emergency lights 8/7/00 8:30:52 AM
FIRE-Final Inspection8/2/20008/3/20008/3/2000PFAIL
DetailsJoe Tawney
EARLE-- ###-#### FIRE FN Reinsp. fail alarm system emergency lights 8/7/00 8:31:08 AM
FIRE-Final Inspection8/1/20008/2/20008/2/2000ACANC
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 08/01/2000 at 12:28:18. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 08/02/2000 at 07:26:15.
BLD-Other7/31/20008/1/20007/31/2000ACANC
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 07/31/2000 at 14:26:08. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/31/2000 at 14:27:51.
FIRE-Final Inspection7/27/20007/28/20007/28/2000PFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 07/27/2000 at 17:01:36. Contact: ###-####. Final fail C/N issued. 7/31/00 8:31:51 AM
BLD-Framing/Rough-in7/26/20007/27/20007/27/2000PPART
DetailsJim Storey
GARY --###-#### CEILING INSP ceilling ok except above hood ceilling required and all trash to be removed. 7/28/2000 8:42:38 AM
BLD-Conference7/26/20007/26/20007/26/2000PPART
DetailsCarl Dependahl
###-####-gary for conf; call for final. 7/26/2000 4:26:31 PM
FIRE-Conference7/26/20007/26/20007/26/2000PPART
DetailsJoe Tawney
gary ###-#### fire conf Conf with Gary Gen Contractor. 7/27/00 10:42:08 AM
FIRE-Supply Line Flush7/11/20007/12/20007/12/2000APART
DetailsJoe Tawney
PER JOE T. 9:00--ERIC ###-#### Ok on supply line flush 7/12/00 1:07:43 PM
BLD-Framing/Rough-in6/29/20006/29/20006/28/2000 PART
DetailsCarl Dependahl
BLD-Framing/Rough-in6/27/20006/27/20006/27/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/27/2000 at 07:19:26. Contact: ###-####. shafts@ hoods-need verify htg. ok for grease duct, told Alan H. 6/28/00 2:14:03 PM
BLD-Framing/Rough-in6/26/20006/26/20006/26/2000PFAIL
Details
Scheduled by a contractor via Hello! on 06/26/2000 at 09:59:44. Contact: ###-####. need proper assy for grease shaft and must follow same to the letter 6/26/00 4:58:36 PM
BLD-Wall cover6/9/20006/9/20006/9/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/09/2000 at 08:25:07. Contact: ###-####. verified engineering design and put in carls box for archival. 6/12/00 9:08:15 AM
BLD-Framing/Rough-in6/7/20006/7/20006/7/2000PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/07/2000 at 06:47:46. Contact: ###-####. c/n fail ok to insul ext. walls; eng'r to address street issues 6/19/00 11:37:13 AM
BLD-Framing/Rough-in6/5/20006/6/20006/6/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/05/2000 at 15:00:09. Contact: ###-####. Ext. nailing; need anchor bolts, straps etc. @ sw's...eng'r to address. 6/7/00 10:04:44 AM
BLD-Conference5/25/20005/26/20005/26/2000APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/25/2000 at 15:02:22. Contact: ###-####. W/supt. roof diaphram ok. 5/31/00 9:17:54 AM
BLD-Framing/Rough-in5/25/20005/26/20005/26/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/25/2000 at 15:03:07. Contact: ###-####.
FIRE-Supply Line Cover5/8/20005/8/20005/8/2000PPART
DetailsJoe Tawney
jim ###-#### underground Ok supply line cover 5/9/00 11:34:57 AM
BLD-Foundation4/27/20004/27/20004/27/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/27/2000 at 09:13:40. Contact: ###-####. Address wrong? MTI onsite for fnd. 4/28/00 3:00:26 PM
Pending Assignment by MYS1/12/2000 4/25/2000 DONE
DetailsMarlene Southard
Routing - PLANNING1/19/2000 4/25/2000 DONE
Approved per DRH99-00156.
Plan routing begun/NEW & ADDTN  4/25/2000 DONE
BLD-Footing4/22/20004/24/20004/24/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/22/2000 at 14:01:39. Contact: ###-####. Pending soils & spec. insp. reports..is this mis-addressed. 4/26/00 12:14:24 PM
(F) Reprint permit  4/3/2000 DONE
Issue PAID IN FULL permit  3/31/2000 DONE
Telephone call  3/2/2000 DONE
LEFT MESS THAT PERMIT IS READY
Plan Reviewer's activity  3/2/2000 DONE
Print Pending Permit.LaserJet4  3/2/2000 DONE
Case Summary (BLD)  3/2/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/2/2000 DONE
Inspection Record Card- Bld  3/2/2000 DONE
Plan assigned to (M_P)1/13/2000 3/2/2000 PASS
DetailsMike Phillips
3/2/2000 10:34:19 M_P - activity updated through activity BLDA022 from case BLD00-00080.
Routing - PLUMBING2/29/2000 3/1/2000 DONE
Routing - PUBLIC WORKS2/25/2000 2/29/2000 DONE
Additional plans submitted  2/29/2000 DONE
RECEIVED A GEOTECHNICAL ENGINEERING STUDY FROMMCG ARCHITECTS, FORWARDED SAME TO MIKE PHILLIPS. 2/29/00 DAR
Routing - PLAN CHECK2/23/2000 2/25/2000 PEND
Plan resubmittals received  2/25/2000 DONE
received five copies of revised civil sheets c-3 and c-5. Two copies of revised plumbing sheets. Put with plans and routed to pw and plumbing. kmm
Routing - FIRE2/23/20002/23/20002/23/2000 PASS
DetailsBill Alexander
Routing - FIRE2/15/20002/17/20002/17/2000 FAIL
DetailsBill Alexander
Require water flow sprinkler design information.
Plan Review Completed(1st rev)  2/17/2000 FAIL
DetailsBill Alexander
Routing - PLAN CHECK2/2/2000 2/15/2000 PEND
ROUTING TO FIRE FOR REVIEW.
Plan Reviewer's activity  2/15/2000 PEND
ROUTING TO FIRE FOR REVIEW. WAITING FOR OTHERS TO APROVE PROJECT PRIOR TO PERMIT ISSUANCE.
Print Pending Permit.LaserJet4  2/15/2000 PEND
Plan resubmittals received  1/24/2000 DONE
RECEIVED TWO COPIES OF LANDSCAPE SHEETS L1.1, L2.1, L2.2. MARTY DOES NOT NEED TO REVIEW RESUBS. PUT RESUBS WITH BUILDING PLANS. KMM
Routing - PLUMBING1/19/2000 1/24/2000 FAIL
1/24/2000 ROUTED TO FIRE FOR GRADING ONLY AT THIS TIME. KMM
Routing - PUBLIC WORKS1/13/2000 1/19/2000 FAIL
WASH TRASH AREA DRAIN CONNECTED TO THE STORMWATER SYSTEM PER BRIAN MURPHY. 1/19/00 DAR
Plans ACCEPTED BY PLAN TECH  1/13/2000 PEND
REQUIRES LANDSCAPE PLANS AND SPECS. BOOKS. REQUIRES SOILS REPORT. CONTACTED SCOTT WILSON OF THIS NEED. KMM
PLANS WERE SUBMITTED END OF DEC. HOWEVER I HAD TO WAIT FOR PLAN CHECK FEE TO BE SUBMITTED. PERMIT DESK RECIEVED CHECK 1-12-2000 PM. KMM
1/26/00 RECEIVED ONE COPY OF PROJECT MANUAL. ROUTED TO MIKE P. STILL REQUIRES SOILS REPORT. KMM
Received Certificate of Value  1/13/2000 PASS
Application received  1/12/2000  
Routing Off Site - C.D.H12/14/1999 12/14/1999 PASS
Routing - PLAN CHECK3/1/2000   PEND