Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-00081
StatusFinaled
Name ST LUKES
Site Address 190 E BANNOCK ST
Project NameST LUKES-WEST WING
Customer Number 
ePlanReviewNo
Description
SLRMC WEST WING STAIRWELL - To demo interior North half of exisitng floor areas on the first & third floor and on the West half of the second floor, approximately 12,000 s.f.of the approximately 30,000 s.f. West Wing first three stories. To add new structural support beams & columns to carry the floor at the 1st, 2nd & 3rd floors where opening for new stairs & enclosure will be constructed. To add anchors & place reinforcement at designated walls for placement of new shotcrete structural shear walls at all three floor levels. To make all construction & finish to comply with 2-hour stair enclosure requirements within an existing Type I-FR structure. To protect existing openings at and in enclosure per code. Upgrade electrical, mechanical, plumbing, sprinkler and alarm system per plans & code. No new interior construction or finish beyond the scope clearly shown on the approved plans at the area of the Northwest corner of the floor; maintenance of existing exit corridor systems & upgrade of new accessible restroom. All per approved plans, notes thereon and attachments of plan review comments. NOTE: This building is fully sprinkled. PC#00-0024/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Conference7/10/20087/10/20087/10/2008PDONE
DetailsForrest France
Per Forrest France's e-mail see scanned and attached documents- ok to doc final for Fire///7-10-08 BAS
DOC - Permit Finaled  7/10/2008 DONE
DetailsBarbara Stitt
Per Dave Hannah ok to Doc Final this permit 7-10-08 BAS
Letter of compliance  7/10/2008 DONE
CHANGE STATUS TO (ISS)  2/23/2007 DONE
Plan resubmittals received  3/6/2003 DONE
Received one copy of documentation from CH2MHill responding to Carl's comments. One copy of memo dated 3-5-03 regarding stairway beam. One copy affidavit memo dated August 16,2001 ( with relevant attachments) and one copy affidavit memo dated February 7,2002 ( with relevant attachments). Routed to Dan S per Curtis. kmm
BLD-Conference2/12/20022/12/20022/12/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/12/2002 6:28:38 PM w/ Mike Cotner & supt re finals for west wing project...need eng's ok for MTI's observations & schmidt hammer tests
BLD-Conference12/17/200112/17/200112/17/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 12/17/2001 11:01:53 AM w/ CH2M hill eng'r...need final report/affidavit for seismic upgrade, Spec insp reports appear inadequate(failures,improper test methods); must show bldg up to specs.
BLD-Conference12/7/200112/7/200112/7/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 12/7/2001 12:22:44 PM w/ Jason, st Luke's supt. at site. need appropriate test reports & all sign-offs for project...ok to use stairs.
FIRE-Final Inspection10/25/200110/26/200110/26/2001APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/25/2001 at 08:10:17. Contact: ###-####. okay to use stair enclosure 10/26/2001 11:26:21 AM
BLD-Final10/25/200110/26/200110/26/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/25/2001 at 08:11:17. Contact: ###-####. stair enclosure only ok for t/o; need eng's/spec insp's approval affidavits for entire west wing remodel project, add appropriate signage at doors. complete tile-floor surface & maintain exiting as req'd. 10/26/2001 11:28:30 AM
BLD-Conference10/25/200110/25/200110/25/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/25/2001 12:24:07 PM w/ kelly re final
FIRE-Supply Line Cover10/23/200110/24/200110/24/2001AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/23/2001 at 11:58:16. Contact: ###-####. penetrations; floor needs grinding down; clean storage of constrcution materials 10/23/2001 2:41:50 PM
BLD-Conference10/24/200110/24/200110/24/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/24/2001 11:39:50 AM w/ Rick re finals for stair enclosure...ok w/o tiles til upper floor const complete if exit maintained
BLD-Conference10/8/200110/8/200110/8/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/8/2001 10:39:32 AM reviewed Mti reports, as permit #'s had been incorrect
BLD-Conference10/5/200110/5/200110/5/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/5/2001 3:05:07 PM rec'd arch's letter ok'ing deletion of ts col's...no longer req'd as hvac unit support
BLD-Conference9/24/20019/24/20019/24/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 9/24/2001 8:35:18 AM reviewed MTI report....shotcrete section.
BLD-Conference8/14/20018/14/20018/14/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/14/2001 10:34:46 AM w/ St Lukes; revised spec insp reports rec'd...(permit #s were incorrect on some ); final MTI affidavit re west wing stair is mentioned, but not rec'd at this time
FIRE-Final Inspection7/24/20017/24/20017/24/2001AFAIL
DetailsRick Jackson
Added by Inspector: 409 On 7/24/2001 9:58:43 AM penetration from sink drain into enclosure; sprinklers required; smoke seals on doors; requested sprinkler and alarm plans for 1-2-3rd floor remodels
Print Occupancy Form  7/24/2001 DONE
BLD-Conference6/26/20016/26/20016/26/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/26/2001 11:30:28 AM onsite w/ supt, obtain other oks, submit engs ok for discrepancies/modifications
BLD-Conference6/1/20016/1/20016/1/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/1/2001 8:01:32 AM w/ proj mgr re modifications, need eng'g stamped
BLD-Conference5/25/20015/25/20015/25/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 5/25/2001 7:47:48 AM w/ John Schultz re: modifications to upgrade, need eng's letter
BLD-Conference5/16/20015/16/20015/16/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/16/2001 4:59:01 PM w/ proj mgr, need engs ok for shearwalls changed
BLD-Conference5/16/20015/16/20015/16/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/16/2001 4:59:01 PM w/ proj mgr, need engs ok for shearwalls changed
BLD-Conference5/8/20015/8/20015/8/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 5/8/2001 3:03:32 PM w/ proj mgr...needeng'r to address discrepancies & missed tests by MTI.
BLD-Conference4/25/20014/25/20014/25/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 4/25/2001 9:30:31 AM w/ new proj mgr...obtain insps as req'd
Fee Review-notes1/13/20001/13/20004/19/2001 DONE
BLD-Conference4/17/20014/17/20014/17/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/17/2001 3:15:10 PM w/John; re prior actions on project...need call insps when placing shotcrete
BLD-Framing/Rough-in3/19/20013/19/20013/19/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/19/2001 4:11:39 PM reviewed insp reports for shot-crete; steel added at stairs ok.
BLD-Concrete2/7/20012/12/20012/12/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/07/2001 at 13:37:46. Contact: ###-####. pend insp rport for shotcrete 2/12/2001 3:16:49 PM
BLD-Framing/Rough-in1/31/20011/31/20011/31/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/31/2001 at 08:34:01. Contact: ###-####. part, clg at stairs ok to tile, need fasteners per ul detail at gyp face layer at stair walls2/1/2001 11:53:20 AM 2/1/2001 11:55:02 AM
Plan resubmittals received  1/26/2001 DONE
Received reinforcing steel inspection report. routed to Jim Storey. KMM
BLD-Conference1/19/20011/19/20011/19/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/19/2001 12:31:53 PM w/ Kelly re c/n...ok if arch certifies fix at beams
BLD-Framing/Rough-in1/17/20011/18/20011/18/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/17/2001 at 15:20:22. Contact: ###-####.wip on wrapping col's & beams, need arch's letter 1/18/2001 4:02:27 PM
BLD-Conference1/17/20011/17/20011/17/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/17/2001 10:15:19 AM w/ framer at stair enclosure, keep c/n re indiv. protection of members...beams, col's. requested arch's response
BLD-Framing/Rough-in1/15/20011/16/20011/16/2001AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/15/2001 at 08:26:55. Contact: ###-####. c/n isued re fire rating at beam/ col's at stairs... need 2hrindivi 1/16/2001 2:02:49 PM dual?? 1/16/2001 2:02:57 PM
BLD-Other1/8/20011/9/20011/9/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/08/2001 at 14:13:06. Contact: ###-####.
BLD-Framing/Rough-in12/21/200012/22/200012/22/2000ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/21/2000 at 11:39:01. Contact: ###-####. conf only w/ proj. mgr. 12/22/2000 10:13:57 AM
BLD-Other8/8/20008/8/20008/8/2000PPART
Details
Scheduled by a contractor via Hello! on 08/08/2000 at 08:48:50. Contact: ###-####. looked at the r-baron the 1st level prior to shotgrete, all sp insp must be caught up prior to pour of same spoke with danny 8/9/2000 11:10:02 AM
BLD-Other4/12/20004/13/20004/13/2000APART
Details
Scheduled by a contractor via Hello! on 04/12/2000 at 15:05:51. Contact: ###-####. need sp insp scope letter all per the sp insp approvals. 04/13/2000
Receive PAYMENT IN FULL  3/30/2000 DONE
Issue & PRINT FEE-DUE permit  3/6/2000 DONE
Routing - FIRE2/25/20002/29/20002/29/2000 PASS
DetailsSam Rogers
delayed submtall of AS and FA plans req'd
Routing Off Site - STRUCTURAL1/14/20001/28/20002/29/2000 PASS
SENT PLANS TO STRUCTURAL ENGINEERING CONSULANTVIA PDQ. 1/14/00 DAR
ROUTED STRUCT. CALCS THAT WERE RECEIVED ON 1/27/00 TO OUTSIDE ENG. KMM
1/28/2000 RECEIVED COMMENTS BACK FROM OUTSIDE ENG. ROUTED TO DAN S. KMM
2/29/00 - RECEIVED FAXED APPROVAL LETTER FROM KEITH JONES ACCEPTING AND APPROVING RESUBMITTAL RESPONSE TO STRUCTURAL PLAN REVIEW COMMENTS OF 2/24/99.
Plan assigned to (DRS)1/13/20001/13/20002/29/2000 PASS
DetailsDan Stuart
2/29/2000 12:21:58 DRS - activity updated through activity BLDA022 from case BLD00-00081.
Routing - PLAN CHECK2/29/2000 2/29/2000 PASS
RECEIVED CONFIRMATION FAX FROM KEITH JONES APPROVING STRUCTURAL ENGINEERS RESPONSE TO HIS THIRD PARTY REVIEW. CALLED ART ALBANESE TO TELL HIM THE SPECIAL INSPECTION FORM WAS TO BE PROVIDED TO THE STRUCTURAL INSPECTOR AND THAT I WOULD NOTE THIS ON THE PLANS. I AM ROUTING THE PLANS FOR ISSUANCE OF PERMIT.
PLANS/APPL TAKEN TO FRONT DESK  2/29/2000 PASS
ROUTING FOR ISSUANCE OF PERMIT.
Print Occupancy Form  2/29/2000 DONE
Inspection Record Card- Bld  2/29/2000 DONE
Telephone call  2/29/2000 DONE
GAVE DOLLAR AMOUNT ALSO NEED STL #
Routing - PLAN CHECK2/8/2000 2/24/2000 PEND
INCERTED RESUBMITTALS INTO PLANS. NEED THE SPECIAL INSPECTION AGREEMENT FOR FOR APPROVAL OF SPECIAL INPECTOR & AGENCY. ALSO NEED RESPONSE TO STRUCTURAL DESIGN REVIEW RESUBMITTAL COMMENTS OF 2/24/00 FROM AHJ.
Plan resubmittals received  2/24/2000 DONE
RECEIVED TWO COPIES OF REVISED DRAWINGS A1.0, A2.0, A3.0, A4.0 AND NEW SHEET A5.0 PLUS RESPONSE LETTER. ROUTED TO DAN S. KMM
Routing - FIRE2/8/20002/8/20002/8/2000 FAIL
DetailsSam Rogers
Plan Review Completed(1st rev)  2/8/2000 FAIL
DetailsSam Rogers
Routing - PLAN CHECK1/18/2000 2/2/2000 FAIL
Preliminary pln review completed. Corrections / Clarifications required. Copy to Architect - faxed & mailed.
Plan resubmittals requested  2/2/2000  
Copy of correction from plan review faxed & mailed to architect.
Plan resubmittals received  1/27/2000 DONE
received two copies of struct. calcs. routed to Dan S. who in turn had them sent to outside eng. kmm
Routing - PLUMBING1/14/2000 1/18/2000 DONE
Routing - PUBLIC WORKS1/13/2000 1/14/2000 DONE
Application received  1/13/2000  
Delayed submittals of AS and FA plans req'd
Plans ACCEPTED BY PLAN TECH  1/13/2000 DONE
REQUESTED 3RD SET OF PLANS AND STRUCTURAL CACULATIONS FROM CURTISS OF ST. LUKES CONSTRUCTION OFFICE. 1/13/00 DAR