Permit Information
Permit NumberBLD00-00112
StatusFinaled
Name WASHINGTON MUTUAL BANK
Site Address 3550 W STATE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(WASHINGTON MUTUAL BANK) This building is not fire sprinklered. To convert a 2,871 square foot former fast food restaurant to a bank. Work is to include selective demolition, two restrooms accessible to the disabled, interior nonbearing walls, interior bearing walls, new roof coverings, interior finishes, millwork, exterior finishes, site work, and suspended ceilings. In addition, to construct a 16" x 26' detached drive through canopy. Work is to include concrete footings, steel columns, glu-lam beams, wood roof trusses, brick veneer, and metal roofing. All work shall comply with the approved drawings, engineering, and plan review conditions on file. PC-039-00 DRH99-00242 CUP99-00114 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  9/9/2004  
Fee Review-notes1/19/20001/19/20007/25/2000 DONE
Permanent occupancy UNPAID FEE  7/17/2000 DONE
Perm. Occ. Cert. #8289 issued 7-17-00 to Washington Mutual Bank.
Permanent Occupancy 7/14/20007/14/2000 DONE
Details
BLD-Final7/13/20007/14/20007/14/2000APASS
DetailsTony Young
CARL--###-#### FN OK for perm. occ. 7/14/00 2:48:34 PM
FIRE-Final Inspection7/6/20007/7/20007/7/2000APASS
DetailsRick Jackson
###-####
BLD-Final7/6/20007/7/20007/7/2000PPART
DetailsTony Young
###-#### Temp. occ. ok- fix for back landing needed. 7/10/00 9:48:27 AM
FIRE-Final Inspection6/30/20007/5/20007/5/2000AFAIL
DetailsRick Jackson
###-#### door hardware; landing for exit door oon north side 7/6/00 7:54:26 AM
BLD-Framing/Rough-in6/22/20006/23/20006/23/2000AFAIL
DetailsTony Young
ceiling cover Carl ###-#### C/N left / ceiling grid. 6/23/00 3:14:30 PM
BLD-Framing/Rough-in6/23/20006/23/20006/23/2000PPART
DetailsTony Young
ceiling insp--carl ###-#### Ok to cover ceiling corids. 6/26/00 11:34:29 AM
BLD-Framing/Rough-in6/14/20006/15/20006/15/2000AFAIL
DetailsJim Storey
ceiling grid Carl ###-####
BLD-Framing/Rough-in5/19/20005/22/20005/22/2000PPASS
Details
karl ###-#### r/i---re-insp
BLD-Framing/Rough-in5/22/20005/22/20005/22/2000PPASS
Details
###-#### ok to cover 5/23/00 7:51:06 AM
BLD-Framing/Rough-in5/17/20005/18/20005/18/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/17/2000 at 15:25:59. Contact: ###-####. C/N- continue "DLD" insul. removal; rec'd shear "ok" from MTI. 5/22/00 9:30:02 AM
BLD-Framing/Rough-in5/18/20005/18/20005/18/2000PCANC
Details
###-#### done by 340 5/18/00 3:58:06 PM
BLD-Framing/Rough-in5/3/20005/3/20005/3/2000PPART
Details
###-#### Larry must remove combustable insul. facings 5/3/00 3:52:17 PM
BLD-Foundation4/27/20004/27/20004/27/2000PPART
DetailsWes Worcester
stem wall special inspectors Carl ###-#### will be pouring at 2:30 Pending spec. insp. report 4/28/00 9:12:43 AM
BLD-Footing4/25/20004/25/20004/25/2000PFAIL
Details
retaining wall footing Carl ###-#### pour at 2:30 they have a special inspector coming out footings poured w/o insp no call from contractor 4/25/00 5:01:31 PM
Issue PAID IN FULL permit  3/24/2000 DONE
Routing Off Site - A.C.H.D3/23/20003/23/20003/23/2000 DONE
no impact fee due as per Jeff Lowe letter dated March 21, 2000.mps
Print Occupancy Form  3/7/2000 DONE
Inspection Record Card- Bld  3/7/2000 DONE
Telephone call  3/7/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/6/2000 PASS
Plan assigned to (CJW)1/24/2000 3/6/2000 PASS
DetailsCarl Westfall
3/6/00 16:14:02 CJW - activity updated through activity BLDA022 from case BLD00-00112.
Routing - PLAN CHECK2/17/2000 3/6/2000 PASS
Plan Reviewer's activity  3/6/2000 PASS
Drawings approved, with conditions, after resubmittal review.
Plan resubmittals received  3/3/2000 DONE
PLAN RESUBMITTALS RECEIVED FROM CALLISON ARCHITECTS, NORA LEININGER,TWO SETS OF PAGES A2.01 AND A11.01, FORWARDED SAME TO CARL WESTFALL. 3/3/00
Routing - FIRE2/16/20002/17/20002/17/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  2/17/2000  
DetailsBill Alexander
CW Failed.
Routing - PLAN CHECK2/7/2000 2/16/2000  
Plan Reviewer's activity  2/9/2000  
UBC plan review started February 9, 2000 and finished February 16, 2000. A response is required from the architect. See the conditions list.
Routing - PLUMBING2/7/2000 2/7/2000 DONE
Routing - PUBLIC WORKS2/3/2000 2/7/2000 DONE
Routing - PLANNING2/3/20002/3/20002/2/2000 PASS
approved per DRH99-0242.
Plan routing begun/TENANTS  1/24/2000 DONE
Route to PLANNING, PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
Routing - PLANNING1/24/2000 1/24/2000 PASS
OK
Pending Assignment by MYS1/24/2000 1/24/2000 DONE
DetailsMarlene Southard
Application received  1/19/2000  
Recd Pcfee & Taken To Pln CK  1/19/2000 DONE
Case Summary (BLD)     
Plan Review Report