Fee Review-notes | 1/19/2000 | 1/19/2000 | 6/9/2003 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/16/2001 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/20/2000 | | DONE |
|
|
|
|
Pending Assignment by MYS | 1/19/2000 | | 10/20/2000 | | DONE |
Marlene Southard
|
|
|
10/20/00 12:53:34 KMM - activity updated through activity BLDA170 from case BLD00-00122.
|
BLD-Conference | 8/14/2000 | 8/15/2000 | 8/15/2000 | A | FAIL |
Jim Sly
|
|
|
ramo--###-#### cell conf builder to have appr. plans on site for inspection 8/15/00 4:19:03 PM
|
BLD-Conference | 8/10/2000 | 8/11/2000 | 8/11/2000 | A | FAIL |
Alan Hauser
|
|
|
###-#### Tried to call twice, no answer. 8/11/00 2:55:16 PM
|
BLD-Framing/Rough-in | 8/2/2000 | 8/3/2000 | 8/3/2000 | A | PART |
Tom Arcoraci
|
|
|
RAMO-- ###-#### --INSP ROOF ok to cover ext and roof 8/3/2000 1:14:28 PM
|
BLD-Conference | 5/17/2000 | 5/18/2000 | 5/18/2000 | A | PART |
Jim Sly
|
|
|
need to verify setbacks. Primari;y the eagle road
setback. ID transp. dept. questioning setback- eagle rd. reasement. 5/18/00 3:21:30 PM
|
BLD-Conference | 5/18/2000 | 5/18/2000 | 5/18/2000 | A | PASS |
Jim Sly
|
|
|
I.D.O.T. cofirmed setbacks are per agreement.
|
BLD-Foundation | 5/12/2000 | 5/12/2000 | 5/12/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/12/2000 at 07:01:36. Contact: ###-####.
|
BLD-Foundation | 5/9/2000 | 5/10/2000 | 5/10/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/09/2000 at 16:28:02. Contact: ###-####.
|
BLD-Footing | 5/2/2000 | 5/2/2000 | 5/2/2000 | P | PART |
Jim Sly
|
|
|
###-#### Foot appears ok 5/3/00 3:40:31 PM
|
Issue PAID IN FULL permit | | | 4/24/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 2/25/2000 | | |
|
|
|
FOUNDAYTION ONLY
|
Print Pending Permit.LaserJet4 | | | 2/25/2000 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/25/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/25/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/25/2000 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 1/21/2000 | | 2/25/2000 | | PASS |
Mike Phillips
|
|
|
2/25/2000 14:06:30 M_P - activity updated through activity BLDA022 from case BLD00-00122.
|
Routing - PLAN CHECK | 2/2/2000 | | 2/25/2000 | | |
|
|
|
|
Routing - FIRE | | | 2/25/2000 | | |
|
|
|
NO FIRE DEPARTMENT REVIEWUIRED FOR FOUNDATION.
|
Routing Off Site - STRUCTURAL | 2/14/2000 | | 2/15/2000 | | |
|
|
|
CONTACTED PDQ TO TAKE REVISED STRUCT. CALCS. TO OUTSIDE ENG. KMM
2/15/2000 ROUTED RESPONSE LETTER FROM OUTSIDE ENG. TO MIKE P. KMM
|
Plan resubmittals received | | | 2/11/2000 | | |
|
|
|
Received response to engineering.
|
Routing Off Site - STRUCTURAL | 1/24/2000 | | 2/4/2000 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
2nd review required by outside engineering firm.
|
Routing - PLANNING | 2/1/2000 | | 2/2/2000 | | PASS |
|
|
|
Approved per DRH99-00197 and per revised total square footage of 20, 425 sq. ft.
|
Plan resubmittals received | | | 2/2/2000 | | DONE |
|
|
|
RECEIVED COPY OF REVISED BUILDING SIZES BY AREA. THESE CAME TO ME BY WAY OF TEMPRA WILSON. PUT WITH PLANS AND FILE. KMM
|
Routing - PUBLIC WORKS | 1/24/2000 | | 2/1/2000 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/24/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/24/2000 | | DONE |
|
|
|
REVISED CERT. OF VALUE $21,119 KMM
|
Received Certificate of Value | | | 1/24/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/21/2000 | | PEND |
|
|
|
REQUIRES TWO ADDITIONAL CIVIL SETS FOR GRADING PERMIT. REQUIRES GRADING PERMIT TO BE ROUTING. TWO LANDSCAPE PLANS FOR GRADING PERMIT. DRAINAGE CALCS. EPARATE CERT. OF VALUE. ARCH/ENG. RECORD FORM. CONTACTED GUY ROBERTSON OF THESE NEEDS. KMM 1/21/2000 BRIAN RECEIVED TWO ADD. CIVIL SETS WITH CALCS. STILL NEED CERT. OF VALUES AND TWO LANDSCAPE PLANS.KMM
1/24/2000 RECEIVED REVISED CERT. OF VALUE FOR FOUND. ONLY. PROJECT VALUE $21,119 STILL REQUIRES LANDSCAPE PLANS. KMM
|
Waiting for Cert. of Value | | | 1/21/2000 | | DONE |
|
|
|
ORIGINAL CERT. OF VALUE WAS FOR THE WHOLE PROJECT. NEED REVISED CERT. FOR FOUNDATION MINUS GRADING AND BUILDING. KMM
|
Application received | | | 1/19/2000 | | |
|
|
|
|