Case Summary (BLD) | | | 6/4/2004 | | |
|
|
|
|
Fee Review-notes | 6/23/2003 | 6/23/2003 | 6/23/2003 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/7/2003 | | |
|
|
|
|
Fee Review-notes | 1/20/2000 | 1/20/2000 | 3/21/2001 | | DONE |
|
|
|
|
Permanent Occupancy | | 9/11/2000 | 9/11/2000 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/11/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8368 issued 9-11-00 to Lee Dudley Dojo Studio.
|
BLD-Final | 9/7/2000 | 9/8/2000 | 9/8/2000 | A | CANC |
|
|
|
Lee Dudley, ###-#### no answer at the contact # seems to be bogis 9/8/2000 2:13:33 PM
|
Code Occupancy Approval | | | 9/7/2000 | | FAIL |
|
|
|
Seems everyone is all upset about the trim work. Hist. Pres. people do not care - neighbors do not care - Preservation personnel stated rather indignately that we cannot dictate color in this area. Currently the trim work is 3 different colors, but white for the most part..... So leave the trim as is, paint it all one color, - or purple or green or whatever! TRIM PAINT ON BUILDING IS NOT AN ISSUE BUT......Put handicapped sign and insignia in place for final.
|
Code Occupancy Approval | | | 9/6/2000 | | FAIL |
|
|
|
Need H/C insignia on prkg space and above grade H/C parking sign. The trim on the structure is 3 different colors - looks bad. The application for CU for the addition indicates that they applied for addition and the information on the application indicates trim is dark grey to match the existing.
|
BLD-Final | 9/1/2000 | 9/5/2000 | 9/5/2000 | A | FAIL |
|
|
|
Larry; ###-#### code enforcement fail 9/6/2000 9:36:26 AM
|
BLD-Final | 8/30/2000 | 9/1/2000 | 9/1/2000 | A | FAIL |
|
|
|
Lee Dudley ###-#### the key is in the electrical box and you can let yourself in the back door. need p/w and achd signoffs 9/1/2000 10:58:01 AM
|
PubWorks Occupancy Approval | | | 9/1/2000 | | DONE |
|
|
|
Signed Final Occupancy 09/01/00. M. Strasser
|
BLD-Final | 8/15/2000 | 8/16/2000 | 8/16/2000 | A | FAIL |
|
|
|
Ed johnson ###-#### please call before you come out there is no one there needp/z achd signoffs 8/17/2000 9:27:42 AM
|
FIRE-Final Inspection | 8/4/2000 | 8/4/2000 | 8/4/2000 | P | PASS |
Rick Jackson
|
|
|
###-####
|
BLD-Final | 8/4/2000 | 8/4/2000 | 8/4/2000 | P | FAIL |
|
|
|
late pm ###-#### other agencies not approved 8/4/2000 4:04:42 PM
|
Print Occupancy Form | | | 8/4/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/2/2000 | 8/3/2000 | 8/3/2000 | A | FAIL |
Rick Jackson
|
|
|
Larry ###-#### exit door hardware; ADA signs; smoke detector 8/3/2000 11:03:56 AM
|
BLD-Framing/Rough-in | 5/12/2000 | 5/15/2000 | 5/15/2000 | A | PART |
|
|
|
sheet rock insp---CALL 1ST BEFORE INSP PLEASE--ED ###-#### OK TO STARRT TAPING C/N ISSUED SAFETY GLAZING TOP OF STAIRS AND IMPROPER NSTAL OF GREENBOARD 5/15/00 10:51:42 AM
|
BLD-Framing/Rough-in | 5/10/2000 | 5/11/2000 | 5/11/2000 | A | FAIL |
Tom Arcoraci
|
|
|
downstairs only sheetrock nailing Larry ###-#### No access no humans on site. 5/12/00 8:47:38 AM
|
BLD-Energy code compliance | 4/26/2000 | 4/27/2000 | 4/27/2000 | A | PASS |
|
|
|
Ed Johnston ###-#### please call before you go out made ok to cover all c/nremoved 4/27/00 9:54:13 AM
|
BLD-Framing/Rough-in | 4/24/2000 | 4/25/2000 | 4/25/2000 | A | PART |
|
|
|
Ed Johnston ###-#### made ok to start ins. mech c/n in force 4/24/00 3:33:17 PM
|
BLD-Framing/Rough-in | 4/4/2000 | 4/5/2000 | 4/5/2000 | P | PART |
Jim Storey
|
|
|
###-#### data lost check job for actual results. 4/6/00
|
BLD-Framing/Rough-in | 3/31/2000 | 4/3/2000 | 4/3/2000 | A | PASS |
Russ Owen
|
|
|
###-#### Wall cover 4/4/00 1:12:09 PM
|
BLD-Conference | 3/20/2000 | 3/20/2000 | 3/20/2000 | P | PART |
|
|
|
###-#### ner 200 for 1-hour occ seperation required 5/8 required on all ext walls and around stair way 03/21/2000 7:10:41 AM
|
BLD-Footing | 3/15/2000 | 3/16/2000 | 3/16/2000 | A | PASS |
Russ Owen
|
|
|
ed ###-####
|
Issue PAID IN FULL permit | | | 3/15/2000 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 1/21/2000 | 1/21/2000 | 3/13/2000 | | PASS |
Mike Phillips
|
|
|
3/13/2000 13:43:06 M_P - activity updated through activity BLDA022 from case BLD00-00136.
|
Plan resubmittals requested | | | 3/13/2000 | | FAIL |
|
|
|
Need answer about size of emergency egress window from second floor.
|
Plan Reviewer's activity | | | 3/13/2000 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/13/2000 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/13/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/13/2000 | | DONE |
|
|
|
|
Telephone call | | | 3/13/2000 | | DONE |
|
|
|
Larry Sundell ###-#### called permit ready
|
Inspection Record Card- Bld | | | 3/13/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/13/2000 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/8/2000 | | DONE |
|
|
|
RECEIVED ONE COPY OF COVER LETTER, ONE COPY OF PINNACLE ENGINEERS COVER LETTER, TWO COPIES OF ADDITIONAL CALCULATIONS AND FIVE COPIES OF REVISED STAMPED BLUEPRINTS. ROUTED TO MIKE P. KMM
|
Routing - FIRE | 2/25/2000 | 2/29/2000 | 2/29/2000 | | PASS |
Sam Rogers
|
|
|
Subject to field insp'n.
|
Plan Review Completed(1st rev) | | | 2/29/2000 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 2/25/2000 | | FAIL |
|
|
|
Additional informaiton requested to be submitted for further review.
|
Print Pending Permit.LaserJet4 | | | 2/25/2000 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 2/8/2000 | | 2/25/2000 | | |
|
|
|
Routing to fire department for review.
|
Routing - PUBLIC WORKS | 2/7/2000 | | 2/8/2000 | | DONE |
|
|
|
|
Routing - PLUMBING | 2/4/2000 | | 2/7/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 1/25/2000 | | 1/31/2000 | | PASS |
|
|
|
The applicant is required to pland 3'-4" of landscaping on each side of the driveway. The plan does not reflect this. I have red lined the site plan and passed it on to Design Review
|
Routing - PUBLIC WORKS | 1/21/2000 | | 1/25/2000 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN PER BRIAN MURPHY.1/25/00 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 1/21/2000 | | DONE |
|
|
|
|
Received Certificate of Value | | | 1/21/2000 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/21/2000 | | DONE |
|
|
|
|
Plan assigned to (MYS) | 1/20/2000 | 1/20/2000 | 1/20/2000 | | DONE |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/20/2000 | | DONE |
|
|
|
|
Application received | | | 1/20/2000 | | |
|
|
|
|
Routing Off Site - A.C.H.D | 3/15/2000 | 3/15/2000 | | | |
|
|
|
paid on 00-09833
|
Routing - PLAN CHECK | 2/29/2000 | 2/29/2000 | | | PEND |
|
|
|
|