Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-00141
StatusFinaled
Name TAFT STREET PUD APARTMENTS
Site Address 3490 -98 W TAFT ST
Project NameTAFT STREET PUD
Customer Number 
ePlanReviewNo
Description
To construct a new duplex with one Type "A" single story, 1190 Sq.Ft. three bedroom two bath with an attached 484 Sq.Ft. garage and one Type "D" unit, two story, 1511 Sq.Ft. 3 bedroom 2 bath unit with an attached 484 Sq.Ft. garage. The 1st floor is approximately 1009 Sq.Ft. in area and the 2nd floor is approximately 502 Sq.Ft. in area. All construction per the approved plans and attached comment list. MJP CUP 98-00122
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference6/14/20026/14/20026/14/2002PPASS
DetailsTony Young
expired permit--glen- ###-#### call 1st before insp
DOC - Permit Finaled6/14/20026/14/20026/14/2002PPASS
DetailsTony Young
Finaled by inspector at 6/14/2002 3:52:38 PM
BLD-Final1/24/20011/24/20011/24/2001PPART
DetailsTony Young
###-#### or ###-####
3498 side ok for occupancy only,, 3490 side needs vehicle barrior for furnace and fire caulk then ok/// c of c # 19898 issued for 3498 side 1/24/2001 3:07:23 PM
BLD-Energy code compliance10/16/200010/16/200010/16/2000PPART
DetailsTony Young
###-#### bob
need energy compliance report 10/16/2000 4:57:38 PM
BLD-Framing/Rough-in10/6/200010/9/200010/9/2000APART
DetailsTony Young
BOB ###-####
c/n posted, ok to insulate 10/9/2000 10:22:15 AM
BLD-Framing/Rough-in10/6/200010/6/200010/6/2000PNR
DetailsCarl Dependahl
###-#### fr
BLD-Framing/Rough-in10/6/200010/6/200010/6/2000PNR
DetailsCarl Dependahl
bob ###-#### fr
BLD-Framing/Rough-in9/18/20009/18/20009/18/2000PPART
DetailsTony Young
###-####
exterior shear ok on duplex 9/18/2000 2:05:15 PM
BLD-Other9/1/20009/1/20009/1/2000PPART
DetailsTony Young
fire wall ###-#### Bob
draft stops in place, ok to stand,,, lower floor 9/1/2000 2:24:35 PM
BLD-Framing/Rough-in8/30/20008/31/20008/31/2000APART
DetailsTony Young
shear nail bob ###-####
outside shear ok,,, ok to side 8/31/2000 9:59:42 AM
BLD-Foundation5/22/20005/22/20005/22/2000PPART
DetailsTom Arcoraci
###-#### HD's not in place 5/23/00 2:30:58 PM
BLD-Footing5/19/20005/19/20005/19/2000PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 05/19/2000 at 10:09:44. Contact: .
BLD-Foundation5/3/20005/3/20005/3/2000PPASS
Details
###-#### chris r-bar and bolts in place 5/3/00 3:33:58 PM
BLD-Footing5/1/20005/1/20005/1/2000PPASS
DetailsWes Worcester
###-####
Issue PAID IN FULL permit  4/11/2000 DONE
Telephone call  4/10/2000 DONE
talked to tom whitworth to verify plans are ready
Inspection Record Card- Bld  4/6/2000 DONE
Plan Reviewer's activity  4/5/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/5/2000 DONE
Plan assigned to (M_P)1/20/2000 4/5/2000 PASS
DetailsMike Phillips
4/5/2000 15:23:31 M_P - activity updated through activity BLDA022 from case BLD00-00141.
Routing - PLAN CHECK3/14/2000 4/5/2000 PEND
Plan resubmittals received  3/27/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEETS
1. SITE SHEETS A1-1, A1-2. L1-1
2. BUILDING TYPE "A": A2-1A, A2-2A, A2-3A, A3-1A & A7-1
3. BUILDING TYPE "B": A2-2A, A2-3B & A7-1
4. BUILDING TYPE "B REVERSE": A2-2BR, A2-3BR & A7-1
5. BUILDING TYPE "C": A2-1C, A2-2C, A2-3C, A3-1C, A4-2C & A7-1
6. BUILDING TYPE "D": A2-1D, A2-2D, A4-1D & A7-1
ROUTED TO MIKE P. KMM
Routing - FIRE3/14/20003/14/20003/14/2000 PASS
DetailsBill Alexander
Routing - FIRE3/3/20003/7/20003/7/2000 FAIL
DetailsBill Alexander
Lack hydrant location/s and hydrant flows.
Plan Review Completed(1st rev)  3/7/2000 FAIL
DetailsBill Alexander
Routing - PLAN CHECK2/10/2000 3/3/2000  
Routing to fire departmetn
Plan resubmittals requested  3/3/2000 FAIL
Additional information required to be submitted for further review
Routing - PLUMBING2/18/20002/18/20002/18/2000 DONE
Plan resubmittals received  2/18/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM JJ HOWARD, FORWARDED SAME TO PLUMBING. 2/18/00 DAR
Routing - PLUMBING2/8/2000 2/10/2000 FAIL
Routing - PLANNING2/1/2000 2/8/2000 DONE
Routing - PUBLIC WORKS1/25/2000 2/1/2000 PASS
Plans ACCEPTED BY PLAN TECH  1/25/2000 DONE
Received Certificate of Value  1/25/2000 DONE
Application received  1/20/2000  
Routing - PLAN CHECK3/7/2000   PEND