Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-00142
StatusFinaled
Name BLASER GLENN F &
Site Address 3456 -72 W TAFT ST
Project NameTAFT STREET PUD
Customer Number 
ePlanReviewNo
Description
To construct a new triplex with two Type "B" single story, 1140 Sq.Ft. two bedroom two bath with an attached 484 Sq.Ft. garage and one Type "C" unit, two story, 1561 Sq.Ft. 2 bedroom 2 bath unit with an attached 484 Sq.Ft. garage. The 1st floor is approximately 1030 Sq.Ft. in area and the 2nd floor is approximately 531 Sq.Ft. in area. All construction per the approved plans and attached comment list. MJP CUP 98-00122
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy  3/16/2001 PASS
Perm. Occ. Cert. #8599 issued 3-16-01 to the Taft Street Apts.
Permanent Occupancy 3/15/20013/15/2001 DONE
Details
Code Occupancy Approval  3/15/2001 PASS
Inspected on 3/15/2001. Signed permit on 3/16/2001
Telephone call  3/9/2001 DONE
Talked w/Tod re: status of temp. occ.
Temporary occupancy  1/18/2001 PART
Temp. Occ. Cert. #4507 issued 1-18-01 to the Taft Street Apts.
BLD-Final1/17/20011/17/20011/17/2001PPASS
DetailsTony Young
Glen, ###-####
temp. occ. ok ////ok fo perm. occ. after other perm.sign offs. 1/17/2001 2:56:49 PM
FIRE-Final Inspection1/3/20011/4/20011/4/2001APASS
DetailsRick Jackson
glenn blaser ###-#### or ###-####
Code Occupancy Approval  1/4/2001 FAIL
Landscaping not complete. All sod not in yet. Need to post bond. When amount verified will sign temporary.
BLD-Final1/3/20011/3/20011/3/2001PPART
DetailsTom Arcoraci
FN OCC GLENN ###-#### OR TODD CELL ###-#### needs all sigs on card 1/3/2001 2:39:34 PM
Print Occupancy Form  1/3/2001 DONE
BLD-Framing/Rough-in10/6/200010/9/200010/9/2000APASS
DetailsTony Young
###-#### BOB
BLD-Energy code compliance10/6/200010/9/200010/9/2000APASS
DetailsTony Young
BOB ###-####
BLD-Framing/Rough-in10/6/200010/6/200010/6/2000PNR
DetailsCarl Dependahl
fr bob ###-####
BLD-Energy code compliance10/6/200010/6/200010/6/2000PNR
DetailsCarl Dependahl
bob ###-#### energy code
BLD-Framing/Rough-in9/26/20009/27/20009/27/2000APASS
DetailsTony Young
glenn -homeowner-- call 1st before insp ---###-#### or ###-####
still need a correct watsun report ,, ok to start sheetrock on triplex 9/27/2000 11:04:37 AM
BLD-Framing/Rough-in9/22/20009/25/20009/25/2000APART
DetailsTony Young
fr ###-#### bob
ok to insulate,, need truss fix on # cr,,, and energy report 9/25/2000 12:09:37 PM
BLD-Framing/Rough-in9/21/20009/22/20009/22/2000ANR
DetailsRuss Owen
BOB ###-#### FR INSP
BLD-Framing/Rough-in8/30/20008/30/20008/30/2000PPART
DetailsTony Young
reinspection on shear Bob ###-####
outside shear ok. can side now 8/30/2000 3:55:35 PM
BLD-Framing/Rough-in8/24/20008/26/20008/26/2000ACANC
DetailsTony Young
Scheduled by Inspector: 415 On 8/24/2000 shear
BLD-Framing/Rough-in8/23/20008/24/20008/24/2000PPART
DetailsTony Young
shear insp Bob ###-####
c/n left ,,, ok to side end units , except for affected areas , need enginer fix on misplaced hold downs 8/25/2000 11:43:24 AM
BLD-Other8/9/20008/9/20008/9/2000PPART
DetailsTony Young
Bob ###-####
fire wall nailing on rear lower unit
ok to stand wall 8/9/2000 3:15:06 PM
BLD-Foundation5/3/20005/3/20005/3/2000PPASS
Details
###-#### r-bar and bolts in place 5/3/00 3:34:14 PM
BLD-Footing5/1/20005/1/20005/1/2000PPASS
DetailsWes Worcester
###-####
Issue PAID IN FULL permit  4/11/2000 DONE
Telephone call  4/10/2000 DONE
talked to tom whitworth to verify plans are ready
Inspection Record Card- Bld  4/6/2000 DONE
Routing - PLAN CHECK3/14/2000 4/5/2000 PEND
Plan Reviewer's activity  4/5/2000 DONE
Print Pending Permit.LaserJet4  4/5/2000 DONE
Case Summary (BLD)  4/5/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/5/2000 DONE
Print Pending Permit.LaserJet4  4/5/2000 DONE
Plan assigned to (M_P)1/21/2000 4/5/2000 PASS
DetailsMike Phillips
4/5/2000 15:26:36 M_P - activity updated through activity BLDA022 from case BLD00-00142.
Routing - FIRE3/14/20003/14/20003/14/2000 PASS
DetailsBill Alexander
Routing - FIRE3/3/20003/7/20003/7/2000 FAIL
DetailsBill Alexander
Fire Hydrants and hydrant flows required.
Plan Review Completed(1st rev)  3/7/2000 FAIL
DetailsBill Alexander
Plan resubmittals requested  3/3/2000 FAIL
Additional information reuired to be submitted for further review
Routing - PLAN CHECK2/10/2000 3/3/2000  
routing to fire department
Routing - PLUMBING2/18/20002/18/20002/18/2000 DONE
Routing - PLUMBING2/8/2000 2/10/2000 FAIL
Routing - PLANNING2/1/2000 2/8/2000 DONE
Plan resubmittals received  2/8/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEET A1-1 ROUTED TO MIKE P. KMM
Routing - PUBLIC WORKS1/25/2000 2/1/2000 PASS
Received Certificate of Value  1/25/2000 DONE
Plan routing begun/NEW & ADDTN  1/25/2000 DONE
Plans ACCEPTED BY PLAN TECH  1/25/2000 DONE
Application received  1/21/2000  
Routing - PLAN CHECK3/7/2000   PEND
(F) Reprint permit