Fee Review-notes | 6/23/2003 | 6/23/2003 | 6/23/2003 | | DONE |
|
|
|
|
Permanent Occupancy | | 9/15/2000 | 9/15/2000 | | DONE |
|
|
|
|
BLD-Final | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | PASS |
Jim Sly
|
|
|
Cal, ###-#### - I have the card & all approvals : ) OK for perm Occ. 9/15/2000 10:14:19 AM
|
Permanent occupancy | | | 9/15/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8379 issued 9-15-00 to D G Turf Farm and Nursery.
|
Fee Review-notes | 1/21/2000 | 1/21/2000 | 7/25/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/30/2000 | 5/30/2000 | 5/30/2000 | P | PASS |
Joe Tawney
|
|
|
Cal ###-#### Ok for cert. of compl. 5/31/00 9:23:38 AM
|
BLD-Final | 5/30/2000 | 5/30/2000 | 5/30/2000 | P | PART |
Jim Sly
|
|
|
Cal ###-#### C/N..obtain perm. occ. status within 90 days..ok for temp. occ. 5/31/00 4:27:51 PM
|
Temporary occupancy | | | 5/30/2000 | | PART |
|
|
|
Temp. Occ. Cert. #4021 issued 5-30-00 to D G Turf Farm & Nursery.
|
FIRE-Final Inspection | 5/25/2000 | 5/26/2000 | 5/26/2000 | P | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 05/25/2000 at 16:42:28. Contact: ###-####.
|
BLD-Final | 5/25/2000 | 5/26/2000 | 5/26/2000 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/25/2000 at 16:44:07. Contact: ###-####. NR 5/30/00 9:46:49 AM
|
FIRE-Conference | 5/24/2000 | 5/24/2000 | 5/24/2000 | P | PART |
Joe Tawney
|
|
|
cal--- ###-#### for conf Conf. on exiting and door hardware 5/25/00 9:00:24 AM
|
Code Occupancy Approval | | | 5/24/2000 | | FAIL |
|
|
|
Bonded for temporary - still need stripping, h/c ramp & sign and some sprinkler system and landscaping.
|
BLD-Final | 5/22/2000 | 5/24/2000 | 5/23/2000 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/22/2000 at 19:01:00. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/23/2000 at 14:28:46.
|
FIRE-Final Inspection | 5/18/2000 | 5/19/2000 | 5/19/2000 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/18/2000 at 16:16:22. Contact: ###-####. Final fail C/N issued. 5/22/00 10:57:05 AM
|
BLD-Conference | 5/9/2000 | 5/10/2000 | 5/10/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/09/2000 at 17:54:35. Contact: ###-####.
|
BLD-Foundation | 3/27/2000 | 3/28/2000 | 3/28/2000 | A | PASS |
Jim Sly
|
|
|
###-#### Mike Miller
|
Issue PAID IN FULL permit | | | 3/22/2000 | | DONE |
|
|
|
|
Routing - FIRE | 3/17/2000 | 3/21/2000 | 3/21/2000 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 3/21/2000 | | 3/21/2000 | | PASS |
|
|
|
Plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2000 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/21/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/21/2000 | | DONE |
|
|
|
|
Plan assigned to (JCB) | 1/27/2000 | | 3/21/2000 | | PASS |
Jason Blais
|
|
|
|
Routing - PLUMBING | 3/15/2000 | | 3/17/2000 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/21/2000 | 3/21/2000 | 3/16/2000 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/16/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED PLUMBING PLANS FROM DE BEST. ROUTED TO GARY ZIEGLER. KMM
|
Plan resubmittals received | | | 3/15/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM CAL OF D AND G TURF FARMS, SMALL DOCUMENTS AND 3 COPIES OF A PLUMBING SHEET. BY DeBEST PLUMBING. 3/15/00 DAR
|
Routing - PLAN CHECK | 2/29/2000 | | 3/15/2000 | | PEND |
|
|
|
Permit approval dependent on structural, plumbing, and fire approval. Plans routed to these depts.
|
Plan resubmittals received | | | 3/10/2000 | | DONE |
|
|
|
PLAN RESUBMITTALS RECEIVED FROM MIKE FAIRCHILD ARCHITECT AND PINNACLE ENGINEERS. A-1 THROUGH A-7 PLUS 4.1, AND ENGINEERING CACULATIONS, FORWARDED SAME TO JASON BLAIS. 3/10/00
|
Meeting | | | 3/10/2000 | | |
|
|
|
Mike Fairchild has proposed an alternate restroom design on this moved building that is in compliance with ADA standards and the 1998 ICC/ANSI Accessible Standard (not adopted at this time). I met with Tim Hogland, Building Director, since the letter was addressed to him, and he approved this alternate design for this specific case.
|
Routing - FIRE | 2/25/2000 | 2/29/2000 | 2/29/2000 | | FAIL |
Bill Alexander
|
|
|
UFC issues (reference report).
|
Plan Review Completed(1st rev) | | | 2/29/2000 | | FAIL |
Bill Alexander
|
|
|
|
Plan resubmittals requested | | | 2/24/2000 | | PEND |
|
|
|
Plan resubmittals and response required for further review.
|
Routing - PLAN CHECK | 1/31/2000 | | 2/24/2000 | | FAIL |
|
|
|
Plan review report sent and faxed to architect. Plan resubmittals and response required for further review. Plans routed to fire department.
|
Routing Off Site - STRUCTURAL | 1/27/2000 | | 2/15/2000 | | FAIL |
|
|
|
SENT PLANS TO CONSULTANTING ENGINEER VIA PDQ. 1/27/00 DAR
Structural review requires resubmittal drawings and further review.
|
Plan resubmittals received | | | 2/4/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTAL SHEET 1.3, INCORPORTED SHEET WITH PLANS. 2/4/00
|
Routing - PUBLIC WORKS | 2/1/2000 | | 2/1/2000 | | DONE |
|
|
|
|
Routing - PLUMBING | 1/27/2000 | | 1/31/2000 | | FAIL |
|
|
|
PROVIDE A COMPLETE PLUMBING PLAN IN ACCORDANCE WITH 323. 1/31/00
|
Routing - PUBLIC WORKS | 1/27/2000 | | 1/28/2000 | | FAIL |
|
|
|
REQUIRES INCOMPLETE LEGAL DESCRIPTION AND PROFF OF LEGAL LAND DIVISION. PER BRIAN M. KMM
|
Routing - PLANNING | 1/28/2000 | | 1/28/2000 | | DONE |
|
|
|
|
Pending Assignment by MYS | 1/21/2000 | | 1/27/2000 | | DONE |
Marlene Southard
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/27/2000 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLANNING, PLUMBING, PLAN CHECK, FIRE and STRUCTURAL ENGINEER.
|
Application received | | | 1/21/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 2/1/2000 | | | | PEND |
|
|
|
MIKE FAIRCHILD CAME IN AND STAMPED AND SIGNED PLANS THAT WERE MISSED . KMM
|