Permit NumberBLD00-00147
StatusFinaled
Name D G TURF FARM & NURSERY
Site Address 4195 N EAGLE RD
Project NameD G TURF FARM-RELOCATE
Customer Number 
ePlanReviewNo
Description
Relocating an existing 2,400 sq.ft. two story building to another site for retail/office use per approved plans on file. (Turf farm & plant/tree nursery) Work to include providing an accessible route into building, altering existing restrooms to meet current accessibility standards, new footings/foundation/pony walls/concrete slab for building, some interior finish work, new header openings between employee room and retail area, some plumbing work, some mechanical work, and some electrical work. An addition will be added to the building under a separate permit (BLD00-00148). Grading/Drainage/Parking lot done under (BLD00-00158).COUNTY CU (99-82-CU). (P.C. #058-00) JCB
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/23/20036/23/20036/23/2003 DONE
Permanent Occupancy 9/15/20009/15/2000 DONE
Details
BLD-Final9/14/20009/15/20009/15/2000APASS
DetailsJim Sly
Cal, ###-#### - I have the card & all approvals : ) OK for perm Occ. 9/15/2000 10:14:19 AM
Permanent occupancy  9/15/2000 DONE
Perm. Occ. Cert. #8379 issued 9-15-00 to D G Turf Farm and Nursery.
Fee Review-notes1/21/20001/21/20007/25/2000 DONE
FIRE-Final Inspection5/30/20005/30/20005/30/2000PPASS
DetailsJoe Tawney
Cal ###-#### Ok for cert. of compl. 5/31/00 9:23:38 AM
BLD-Final5/30/20005/30/20005/30/2000PPART
DetailsJim Sly
Cal ###-#### C/N..obtain perm. occ. status within 90 days..ok for temp. occ. 5/31/00 4:27:51 PM
Temporary occupancy  5/30/2000 PART
Temp. Occ. Cert. #4021 issued 5-30-00 to D G Turf Farm & Nursery.
FIRE-Final Inspection5/25/20005/26/20005/26/2000PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 05/25/2000 at 16:42:28. Contact: ###-####.
BLD-Final5/25/20005/26/20005/26/2000PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 05/25/2000 at 16:44:07. Contact: ###-####. NR 5/30/00 9:46:49 AM
FIRE-Conference5/24/20005/24/20005/24/2000PPART
DetailsJoe Tawney
cal--- ###-#### for conf Conf. on exiting and door hardware 5/25/00 9:00:24 AM
Code Occupancy Approval  5/24/2000 FAIL
Bonded for temporary - still need stripping, h/c ramp & sign and some sprinkler system and landscaping.
BLD-Final5/22/20005/24/20005/23/2000ACANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 05/22/2000 at 19:01:00. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/23/2000 at 14:28:46.
FIRE-Final Inspection5/18/20005/19/20005/19/2000AFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 05/18/2000 at 16:16:22. Contact: ###-####. Final fail C/N issued. 5/22/00 10:57:05 AM
BLD-Conference5/9/20005/10/20005/10/2000PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 05/09/2000 at 17:54:35. Contact: ###-####.
BLD-Foundation3/27/20003/28/20003/28/2000APASS
DetailsJim Sly
###-#### Mike Miller
Issue PAID IN FULL permit  3/22/2000 DONE
Routing - FIRE3/17/20003/21/20003/21/2000 PASS
DetailsBill Alexander
Routing - PLAN CHECK3/21/2000 3/21/2000 PASS
Plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  3/21/2000  
Inspection Record Card- Bld  3/21/2000 DONE
Print Occupancy Form  3/21/2000 DONE
Plan assigned to (JCB)1/27/2000 3/21/2000 PASS
DetailsJason Blais
Routing - PLUMBING3/15/2000 3/17/2000 DONE
Routing Off Site - STRUCTURAL3/21/20003/21/20003/16/2000 PASS
Plan resubmittals received  3/16/2000 DONE
RECEIVED TWO COPIES OF REVISED PLUMBING PLANS FROM DE BEST. ROUTED TO GARY ZIEGLER. KMM
Plan resubmittals received  3/15/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM CAL OF D AND G TURF FARMS, SMALL DOCUMENTS AND 3 COPIES OF A PLUMBING SHEET. BY DeBEST PLUMBING. 3/15/00 DAR
Routing - PLAN CHECK2/29/2000 3/15/2000 PEND
Permit approval dependent on structural, plumbing, and fire approval. Plans routed to these depts.
Plan resubmittals received  3/10/2000 DONE
PLAN RESUBMITTALS RECEIVED FROM MIKE FAIRCHILD ARCHITECT AND PINNACLE ENGINEERS. A-1 THROUGH A-7 PLUS 4.1, AND ENGINEERING CACULATIONS, FORWARDED SAME TO JASON BLAIS. 3/10/00
Meeting  3/10/2000  
Mike Fairchild has proposed an alternate restroom design on this moved building that is in compliance with ADA standards and the 1998 ICC/ANSI Accessible Standard (not adopted at this time). I met with Tim Hogland, Building Director, since the letter was addressed to him, and he approved this alternate design for this specific case.
Routing - FIRE2/25/20002/29/20002/29/2000 FAIL
DetailsBill Alexander
UFC issues (reference report).
Plan Review Completed(1st rev)  2/29/2000 FAIL
DetailsBill Alexander
Plan resubmittals requested  2/24/2000 PEND
Plan resubmittals and response required for further review.
Routing - PLAN CHECK1/31/2000 2/24/2000 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and response required for further review. Plans routed to fire department.
Routing Off Site - STRUCTURAL1/27/2000 2/15/2000 FAIL
SENT PLANS TO CONSULTANTING ENGINEER VIA PDQ. 1/27/00 DAR
Structural review requires resubmittal drawings and further review.
Plan resubmittals received  2/4/2000 DONE
RECEIVED PLAN RESUBMITTAL SHEET 1.3, INCORPORTED SHEET WITH PLANS. 2/4/00
Routing - PUBLIC WORKS2/1/2000 2/1/2000 DONE
Routing - PLUMBING1/27/2000 1/31/2000 FAIL
PROVIDE A COMPLETE PLUMBING PLAN IN ACCORDANCE WITH 323. 1/31/00
Routing - PUBLIC WORKS1/27/2000 1/28/2000 FAIL
REQUIRES INCOMPLETE LEGAL DESCRIPTION AND PROFF OF LEGAL LAND DIVISION. PER BRIAN M. KMM
Routing - PLANNING1/28/2000 1/28/2000 DONE
Pending Assignment by MYS1/21/2000 1/27/2000 DONE
DetailsMarlene Southard
Plan routing begun/NEW & ADDTN  1/27/2000 DONE
Route to PUBLIC WORKS, PLANNING, PLUMBING, PLAN CHECK, FIRE and STRUCTURAL ENGINEER.
Application received  1/21/2000  
Routing - PLAN CHECK2/1/2000   PEND
MIKE FAIRCHILD CAME IN AND STAMPED AND SIGNED PLANS THAT WERE MISSED . KMM