Permit Information
Permit NumberBLD00-00238
StatusFinaled
Name HEWLETT-PACKARD ATT: OLGA
Site Address 11311 CHINDEN BLVD
Project NameHP #5 - UPGRADE (PHASE II)
Customer Number46B11152
ePlanReviewNo
Description
To complete a portion of the upgrade of Bldg. #5 in the basement, a 35,000 sq.ft. area, with the exception of areas left undeveloped for future training rooms per approved plans on file. Work to include non-combustible framing with fire code sheetrock cover to creat a 1-hour rated exit corridor; perimeter walls for "FUTURE TENANT IMPROVEMENTS"; N.C. Machining Room; Mopier; Boiler / Mech. & Elect Rms.; two Accessible Rest Rms. and a New Exit Stairway serving only the basement, enclosed with glazing. NOTE: This building is fully fire sprinklered for area increase. (P.C.#082-00)/ drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/28/2014 DONE
Letter of compliance  9/20/2001 DONE
Letter of Compliance #20886 issued 9-20-01.
BLD-Final9/6/20019/6/20019/6/2001APASS
DetailsJoe Tawney
Added by Inspector: 406 On 9/6/2001 8:28:32 AM Reinsp OK for permanant occupancy
Telephone call  6/25/2001 DONE
Left a msg. for Tim Bashford re: status of temp. occ. cert.
(F) Reprint permit  5/22/2001 DONE
Telephone call  5/21/2001 DONE
Talked w/Tim Bashford @###-#### re: status of temp. occ. & he will follow up.
Fee Review-notes2/1/20002/1/20004/19/2001 DONE
adding fees from subs the blding permit is short 385,335.00 waiting for final certs from the subs for final value. lh
Case Summary (BLD)  4/16/2001 DONE
BLD-Final3/28/20013/28/20013/28/2001APART
DetailsTom Arcoraci
Added by Inspector: 408 On 3/28/2001 10:55:26 AM ok for temp occ waitig for smoke door app
Temporary occupancy  3/28/2001 PART
Temp. Occ. Cert. #4529 issued 3-28-01 to Hewlett-Packard, Bldg. #5.
FIRE-Final Inspection3/21/20013/22/20013/22/2001PPART
DetailsJoe Tawney
Reinsp OK for temporaey occupancy. 3/23/2001 8:18:47 AM
FIRE-Final Inspection3/14/20013/15/20013/15/2001AFAIL
DetailsJoe Tawney
###-####. Reinsp Fail C/N not completed 3/15/2001 1:12:04 PM
Inspection Record Card- Bld  11/20/2000 DONE
Print Occupancy Form  11/20/2000 DONE
FIRE-Conference9/28/20009/28/20009/28/2000PPART
DetailsJoe Tawney
###-#### 1:00 OK on alarm test for Model room and associated exit corridor 9/29/2000 8:00:27 AM
FIRE-Sprinkler Rough-in8/31/20009/5/20009/5/2000PPART
DetailsJoe Tawney
carrie --pager ###-#### Partial rough in Add 2 sway braces to main 9/6/2000 7:46:45 AM
Receive PAYMENT IN FULL  6/26/2000 DONE
CHANGE STATUS TO (ISS)  6/23/2000 DONE
Issue & PRINT permit  6/21/2000 DONE
Telephone call  6/20/2000 DONE
called chris###-#### and the architect
Routing - PLAN CHECK6/6/2000 6/19/2000 PASS
Inserted submittals into plans. Processing for issuance.
PLANS/APPL TAKEN TO FRONT DESK  6/19/2000 PASS
To permit desk for issuance.
Inspection Record Card- Bld  6/19/2000 DONE
Print Occupancy Form  6/19/2000 DONE
Plan assigned to (DRS)2/7/2000 6/19/2000 PASS
DetailsDan Stuart
6/19/2000 15:27:44 DRS - activity updated through activity BLDA022 from case BLD00-00238.
Routing - FIRE6/5/20006/6/20006/6/2000 PASS
DetailsBill Alexander
Routing - PLAN CHECK3/23/2000 6/5/2000 FAIL
Inserted resubmittal received 5/31. Discussed with Sam Burrows, Architect, Lombard-Conrad. None of the Structural Sheets referenced as being re-submitted were submitted. The beam details were mis-labeled on sheet A6.3; the columns & connections for beam support were not shown on plans as stated. The floor system is declared as a 2-hour occupancy separation between the basement & the upper floor and will be used as the rated ceiling of the corridor at locations were the walls of the corridor extend to the concrete deck. Inspector to verify the opening & penetrations in the 2-hour system as declared are protected per code. THE AFORMENTIONED ITEMS WERE RED-LINED ON THE PLANS AND I EXPLAINED THIS TO SAM BURROWS IN AN EFFORT TO GET THE PLANS PERMITTED FOR WORK. Routing plans back to Fire Dept. for review while aing for structural submittals.
Plan resubmittals received  5/31/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM LOMBARD -CONRAD ARCHITECTS, SAM BURROWS THREE SETS OF SHEETS A1.1, A2.2, A2.3, A6.3, A8.3 AND A8.4. FORWARDED SAME TO DAN STUART. 5/31/00 DAR
Plan resubmittals received  4/24/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEET A2.2. ROUTED TO DAN S. KMM
Routing - FIRE3/20/20003/22/20003/22/2000 FAIL
DetailsBill Alexander
Requires information concerning UFC issues. (Reference review)
Plan Review Completed(1st rev)  3/22/2000 FAIL
DetailsBill Alexander
Routing - PLAN CHECK2/9/2000 3/20/2000 FAIL
Further clarification required.
Plan resubmittals requested  3/20/2000 FAIL
Copy of plan review faxed & mailed to Sam Burrows.
Routing - PLUMBING2/8/2000 2/9/2000 DONE
Routing - PUBLIC WORKS2/7/2000 2/8/2000 DONE
Plan routing begun/TENANTS  2/7/2000 DONE
Route to PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
Pending Assignment by MYS2/7/2000 2/7/2000 DONE
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  2/4/2000 DONE
SHEET MN1.7 SIGNED OFF TODAY BY THE ENGINEER. PLANS FORWARDED TO MARLENE. 2/4/00 DAR
Application received  2/1/2000