Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-00250
StatusExpired
Name CSHQA ARCHITECTS
Site Address 250 S 5TH ST Unit: 4 FLR
Project NameC W MOORE PLAZA-4TH FLR
Customer Number 
ePlanReviewNo
Description
(CSHQA ARCHITECTS) This building is fire sprinklered to meet the high-rise provisions of the UBC. To expand the existing 4th floor office tenant space to include the entire 4th floor (11,200 square feet). Work is to include selective demolition of nonbearing walls, construction of interior nonbearing walls, installation of new 20 minute doors at the elevator lobby, and installation of suspended ceilings all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1996 as regulated by the Fire Department. PC-083-00 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  4/20/2007  
(F) Reprint permit  4/20/2007  
BLD-Final10/31/200011/1/200011/1/2000AFAIL
DetailsJim Storey
FN JEFF ###-#### need all other sign offs/ door hardware assemblies not lised for exit door 11/2/2000 4:21:10 PM
BLD-Final10/27/200010/30/200010/30/2000ANR
DetailsJim Storey
pleas call Jeffery at 861=3156
Fee Review-notes2/2/20002/2/20006/20/2000 DONE
BLD-Other4/4/20004/5/20004/5/2000ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/04/2000 at 14:35:40. Contact: ###-####. p paine done 4/4/2000 no record of sihg off on contractor verbal. 4/5/00
FIRE-Sprinkler Rough-in4/4/20004/5/20004/4/2000PPASS
DetailsRick Jackson
Gary Oliver ###-#### okay to cover
Routing - PLAN CHECK2/4/2000 3/25/2000 PASS
BLD-Framing/Rough-in3/23/20003/23/20003/23/2000PPART
Details
Scheduled by a contractor via Hello! on 03/23/2000 at 08:04:29. Contact: ###-####. need to remove all wall sections above the ceiling level when walls are demoed 03/24/2000 8:46:12 AM
Issue PAID IN FULL permit  3/8/2000 DONE
Telephone call  3/2/2000 DONE
left mess that permit is ready
Routing - PLAN CHECK2/29/2000 3/1/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/1/2000 PASS
Inspection Record Card- Bld  3/1/2000 DONE
Print Occupancy Form  3/1/2000 DONE
Plan assigned to (CJW)2/4/2000 3/1/2000 PASS
DetailsCarl Westfall
3/1/00 12:45:08 CJW - activity updated through activity BLDA022 from case BLD00-00250.
Routing - FIRE2/25/20002/28/20002/28/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  2/28/2000 PASS
DetailsBill Alexander
Plan Reviewer's activity  2/25/2000 PASS
UBC plan review started February 25, 2000 and finished the same day. The drawings were approved with conditions. See the conditions list.
Pending Assignment by MYS2/2/2000 2/4/2000 DONE
DetailsMarlene Southard
Plan routing begun/TENANTS  2/4/2000 DONE
Route to PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  2/2/2000 DONE
Application received  2/2/2000  
Case Summary (BLD)     
Plan Review Report