Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-00276
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 4833 DORMAN ST
Project Name 
Customer Number 
ePlanReviewNo
Description
BOISE CITY VEHICLE MAINTENANCE BUILDING * TO CONSTRUCT A 17,335 SQ. FT. SINGLE STORY, TYPE II-N, FULLY FIRE SPRINLERED VEHICLE MAINTENANCE FACILITY ON AN EXISTING SITE AT THE SOUTWEST CORNER OF DORMAN AND NORTHRUP STREETS IN BOISE, IDAHO PER APPROVED PLANS AND ATTACHMENTS. GRADING PERMIT BLD00-00182 ISSUED 2/2/2000 PC#096-00 FIRE SPRINKLERS USED FOR AERA.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/24/20036/24/20036/24/2003 DONE
Telephone call  4/18/2001 DONE
final cert
Permanent occupancy  12/7/2000 DONE
Perm. Occ. Cert. #8495 issued 12-7-00 to the Boise City Vehicle Maintenance Bldg.
BLD-Final12/5/200012/6/200012/6/2000APASS
DetailsSteven Webb
Cathy has the sign-off card. passed, notified Cathy who has sign-off card. 12/6/2000 9:58:28 AM
Permanent Occupancy 12/6/200012/6/2000 DONE
Details
FIRE-Final Inspection12/5/200012/5/200012/5/2000 PASS
DetailsJoe Tawney
Final - ok for perm. occ.
BLD-Final11/14/200011/16/200011/16/2000ANR
DetailsTom Arcoraci
KEN -###-#### FN OCC 11/16/2000 10:41:53 AM
Inspector's copy Bld permit  11/14/2000 DONE
Inspection Record Card- Bld  11/14/2000 DONE
Fee Review-notes2/7/20002/7/200010/24/2000 DONE
Code Occupancy Approval  9/7/2000 PASS
ALL CONDITIONS HAVE BEEN MET, FINAL OCCUPANCY SIGNED OFF AND BOND RELEASED.
FIRE-Alarm Testing7/25/20007/25/20007/25/2000PFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 07/25/2000 at 11:03:45. Contact: ###-####. Reinsp fail phone line supervision. 7/26/00 10:41:47 AM
Temporary occupancy  7/25/2000 PART
Temp. Occ. Cert. #4044 issued 7-25-00 to the Boise City Vehicle Maintenace Shop.
FIRE-Final Inspection7/24/20007/24/20007/24/2000PFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 07/24/2000 at 11:03:40. Contact: ###-####. Reinsp. fail alarm system. 7/25/00 9:37:56 AM
FIRE-Final Inspection7/21/20007/21/20007/21/2000PFAIL
DetailsJoe Tawney
Ken ###-#### late pm Reinsp. fail alarm submitted 7/24/00 1:05:08 PM
FIRE-Final Inspection7/20/20007/20/20007/20/2000PFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 07/20/2000 at 07:48:44. Contact: ###-####. Reinsp. cancelled not ready 7/21/00 9:13:59 AM
BLD-Final7/20/20007/20/20007/20/2000PPART
DetailsJim Storey
###-#### pending fire sign off. 7/21/2000 8:44:41 AM
FIRE-Alarm Testing7/19/20007/19/20007/19/2000PFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 07/19/2000 at 07:57:33. Contact: ###-####. Final fail no approved submittal 7/20/00 8:42:28 AM
BLD-Final7/19/20007/19/20007/19/2000PCANC
DetailsJim Storey
temp occ kevin ###-####
Code Occupancy Approval  7/19/2000 FAIL
CATHY RECEIVED BOND FOR $10,000 AND TEMP SIGNED OFF.
BLD-Final7/18/20007/18/20007/18/2000PFAIL
DetailsJim Storey
temp occ kevin ###-####
BLD-Final7/14/20007/14/20007/14/2000PFAIL
DetailsJim Storey
temp occ\###-####
Code Occupancy Approval  7/14/2000 FAIL
landscape not completed and fence, need to bond $10,000 for temp. occupancy.
BLD-Conference7/11/20007/11/20007/11/2000PPASS
DetailsJim Storey
kevin-- ###-#### conf
BLD-Other7/6/20007/6/20007/6/2000PPART
Details
Scheduled by a contractor via Hello! on 07/06/2000 at 08:15:14. Contact: ###-####. ceiling grid made ok 7/6/00 2:36:57 PM
BLD-Conference6/15/20006/16/20006/16/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/15/2000 at 13:14:14. Contact: ###-####.
BLD-Conference6/12/20006/13/20006/13/2000AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/12/2000 at 15:21:30. Contact: ###-####.ul listing for tor of walls. 6/13/00 11:33:40 AM
BLD-Framing/Rough-in6/2/20006/5/20006/5/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/02/2000 at 14:09:47. Contact: ###-####.
BLD-Framing/Rough-in5/26/20005/26/20005/26/2000PCANC
Details
Scheduled by a contractor via Hello! on 05/26/2000 at 10:36:19. Contact: ###-####. 301 5/30/00 5/30/00 4:06:06 PM
FIRE-Final Inspection4/13/20004/14/20004/14/2000APART
DetailsJoe Tawney
###-#### Ok to cover supply line 4/14/00 1:44:49 PM
BLD-Footing4/5/20004/5/20004/5/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/05/2000 at 07:50:45. Contact: ###-####.
BLD-Footing4/4/20004/4/20004/4/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/04/2000 at 11:12:56. Contact: ###-####.wall around wash bay ok. 4/5/00
BLD-Footing4/3/20004/3/20004/3/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/03/2000 at 09:58:08. Contact: ###-####. placed w/special insp. pending report. 4/3/00
BLD-Footing3/31/20003/31/20003/31/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/31/2000 at 07:52:35. Contact: ###-####. INTERIOR FT WEST END AND GIB CRANE PENDING SPECIAL INSP.REPORT. 3/31/00
BLD-Footing3/29/20003/29/20003/29/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/29/2000 at 07:16:01. Contact: ###-####. east end of wall syst. rebar ok work in progess pending special insp. report and scope of work contract. 3/29/00
BLD-Footing3/27/20003/27/20003/27/2000PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/27/2000 at 11:14:06. Contact: ###-####. South side WIP spec. insp not site. 3/28/00 9:03:10 AM
BLD-Footing3/23/20003/24/20003/24/2000APART
DetailsJim Storey
mitch ###-#### work in progess rebar that is placed is ok pending report from special inspection. 3/24/00 8:49:57 AM
BLD-Foundation3/22/20003/22/20003/22/2000PPASS
DetailsJim Storey
###-#### MITCH//REBAR rebar west half of bld. ok pending special insp. report on concrete. 3/22/00 3:23:18 PM
(F) Reprint permit  3/22/2000 DONE
Issue PAID IN FULL permit  3/21/2000 DONE
Plan assigned to (MLO)2/8/2000 3/20/2000 DONE
DetailsMike Otto
Additional plans submitted  3/20/2000 DONE
RECEIVED TWO SETS OF CHIEF METAL BUILDING PLANS FROM WRIGHT BROTHERS, THE BUILDING COMPANY, FORWARDED SAME TO MIKE OTTO. 3/20/00 DAR
Routing - PLAN CHECK3/20/2000 3/20/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/20/2000 DONE
Print Occupancy Form  3/20/2000 DONE
Inspection Record Card- Bld  3/20/2000 DONE
Telephone call  3/20/2000 DONE
lefte message w/dollar amount told them they will need achd
Plan resubmittals received  3/10/2000 DONE
PLAN RESUBMITTALS RECEIVED FROM ZGA ARCHITECTS, PAUL MARCOLINA, TWOSETS OF SHEETSE2.0, E4.0, E6.0 AND CACULATIONS. FORWARDED SAME TO MIKE OTTO. 3/10/00 DAR
Routing Off Site - STRUCTURAL3/7/2000 3/10/2000 PASS
FAXED MISSING CALCULATION SHEET TO ENGINEER 3-7-00. MLO. 3-8-00 CONTACTED BY ENGINEER THAT FOUNDATION PORTION OF REVIEW IS COMPLETED AND OK TO ISSUE FOUNDATION ONLY IF NEEDED. STILL REQUIRE RESPONSE FROM METAL BUILDING MANUFACTURE. ENGINEER RECEIVED MISSING INFORMATION AND VERBAL APPROVAL PROVIDED BY PHONE 3-10-2000. MLO
Routing - FIRE3/8/20003/8/20003/8/2000 PASS
DetailsBill Alexander
Plan resubmittals received  3/8/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEET GO.1. ROUTED TO MIKE O. KMM
Routing - PLUMBING3/8/2000 3/8/2000 PASS
Routing - PLAN CHECK3/8/2000 3/8/2000 FAIL
ALL NON-STRUCTURAL COMMENTS ARE SATISFIED EXCEPT FOR FINAL PLANS FROM METAL BUILDING MANUFACTURE. MLO
Plan resubmittals received  3/7/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM ZGA ARICHITECTS, PAUL MARCOLINA, INVENTORY OF FLAMABLE PRODUCTS 2 SETS OF SHEETS 2,.21,2.41,A2.1, A3.1,A5.1, A5.2, A8.1, M1.0, M2.0, M3.0, P1.0, P1.1, AND P2.0. FORWARDED SAME TO MIKE OTTO. 3/7/00 DAR
Plan resubmittals received  3/7/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM ZGA ARCHITECTS, PAUL MARCOLINA, TWO SETS OF SHEETS 2.21 AND 2.41, FOR BILL ALEXANDER, FORWARDED SAME TO MIKE OTTO. 3/7/00
Routing - PLAN CHECK3/7/2000 3/7/2000 FAIL
PLAN SHEET GO.1, ITEM #4 ON CORRECTION LIST NOT PROVIDED. ARCHITECT CONTACTED.
Routing Off Site - STRUCTURAL2/23/2000 3/6/2000 FAIL
SENT PLANS TO CONSULTING ENGINEER VIA PDQ. PLANS ARE STAMPED NOT FOR CONSTRUCTION. MIKE OTTO SAID TO SEND THEM ANYWAY.. 2/23/00 DAR
Routing - PLUMBING2/25/2000 2/25/2000 FAIL
called engineer about resubmitting plan showing downstream interceptor vent and use of approved material in the drainage system to the flammable liquids interceptor.
Routing - FIRE2/24/20002/24/20002/24/2000 FAIL
DetailsBill Alexander
UFC/UBC issues.
Plan Review Completed(1st rev)  2/24/2000 FAIL
DetailsBill Alexander
plans sent back to plan check
Plan resubmittals received  2/23/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM ZGA ARCHITECTS AND MUSGROVE ENGINEERS3 SETS EACH OF P1.0, P1.1 AND P2.0, FORWARDED SAME TO MIKE OTTO. 2/23/00
Plan resubmittals requested  2/23/2000 FAIL
UBC CORRECTIONS
Routing - PLAN CHECK2/17/2000 2/23/2000 FAIL
CORRECTIONS MAILED AND FAXED TO ARCHITECT.
Routing Off Site - STRUCTURAL2/8/2000 2/22/2000 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM RECEIVED CALL FROM REVIEWING ENGINEER THAT STRUCTRUAL DRAWINGS FOR THE METAL BUILDING WERE FOR ANOTHER PROJECT. ARCHITECT CONTACTED BY PHONE TO RESUBMIT PROPER DRAWINGS FROM METAL BUILDING MANUFACTURE. MLO
Plan resubmittals requested  2/22/2000 FAIL
REQUESTED NEW STRUCTURAL PLANS FOR THE METAL BUILDING THAT MATCH THE PROJECT. MLO
Routing - PUBLIC WORKS2/8/2000 2/16/2000 DONE
Routing - PLUMBING2/11/2000 2/16/2000 FAIL
Routing - PLANNING2/16/2000 2/16/2000 DONE
ROUTE TO JEFF JONES. KMM
Plans ACCEPTED BY PLAN TECH  2/8/2000 PEND
SPOKE WITH MIKE O. PLANS STATE THE USE OF NEC 1993, UPC 1991, UMC 1997, AND UFC 1994. MIKE WILL ASK FOR A REVISED COVER SHEET. ELEC. PLANS NOT STAMPED OF SIGNED. MIKE ALSO AWARE OF THIS. KMM
Plan routing begun/NEW & ADDTN  2/8/2000 DONE
Plan assigned to (MYS)2/7/20002/7/20002/7/2000 DONE
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  2/7/2000 DONE
Application received  2/7/2000  
Received Certificate of Value  2/7/2000 DONE