Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-00293
StatusFinaled
Name EMERALD MONGOLIAN
Site Address 4898 W EMERALD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(EMERALD MONGOLIAN) To remodel an existing 2500 sq ft restaurant by installing a new cooking appliance and hood system, all work to be per approved plans and engineering on file. Work to include modification to the roof per engineering, installation of a new one-hour shaft for grease duct, installation of new buffet counter, and construction of a nonbearing partition, remodel to the existing restroom lavoratory fixtures and mirror, fro accessible upgrade. NOTE: ANY FUTURE REMODEL OR ALTERATIONS TO THIS TENANT SPACE WILL REQUIRE FURTHER UPGRADES TO THE RESTROOM FOR ACCESSIBILITY COMPLIANCE. (PC#101-00) *RMH*
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/13/2003  
Fee Review-notes3/17/20003/17/20005/5/2000 DONE
Fee Review-notes2/9/20002/9/20005/5/2000 DONE
Permanent Occupancy 4/27/20004/27/2000 DONE
Details
Permanent occupancy UNPAID FEE  4/27/2000 DONE
Perm. Occ. Cert. #8206 issued 4-27-00 to the Emerald Mongolian.
BLD-Final4/14/20004/17/20004/17/2000APASS
DetailsCarl Dependahl
TAINOA ###-#### Ok for perm. 4/17/00 2:05:41 PM
BLD-Final4/11/20004/14/20004/14/2000PFAIL
DetailsCarl Dependahl
###-####---tainoa fn occ late pm Recall after fire. 4/17/00 1:34:06 PM
FIRE-Final Inspection4/13/20004/14/20004/14/2000PPASS
DetailsJoe Tawney
###-#### Final ok for perm. occ. 4/17/00 9:26:21 AM
FIRE-Final Inspection4/11/20004/13/20004/13/2000PFAIL
DetailsJoe Tawney
###-####--tainoa --fire fn Final fail not ready for inspec. 4/14/00 10:55:57 AM
BLD-Framing/Rough-in3/23/20003/24/20003/24/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/23/2000 at 12:44:07. Contact: ###-####. 1hr shaft & post/beam ok 3/24/00 2:03:55 PM
BLD-Foundation3/20/20003/20/20003/20/2000PPART
DetailsCarl Dependahl
###-#### Need plbg. ok. 3/21/00 9:29:03 AM
Routing - FIRE3/13/20003/17/20003/17/2000 PASS
DetailsSam Rogers
Plan assigned to (R_H)2/10/20002/10/20003/17/2000 PASS
Details
3/17/2000 14:45:48 RMH - activity updated through activity BLDA022 from case BLD00-00293.
Plan assigned to (MYS)2/9/20002/9/20003/17/2000 PASS
DetailsMarlene Southard
3/17/2000 14:45:48 RMH - activity updated through activity BLDA022 from case BLD00-00293.
Plan Review Completed(1st rev)  3/17/2000 FAIL
DetailsSam Rogers
PLANS/APPL TAKEN TO FRONT DESK  3/17/2000 PASS
DetailsRon Hill
Inspection Record Card- Bld  3/17/2000 DONE
Print Occupancy Form  3/17/2000 DONE
Telephone call  3/17/2000 DONE
LEFT MESS FOR KAINOA DOWNING THAT PERMIT IS READY
Issue PAID IN FULL permit  3/17/2000 DONE
Receive PAYMENT IN FULL PRINT  3/17/2000 DONE
Plan resubmittals received  3/16/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM JOHN COOK ARCHITECT, TWO SETS OF SHEETS A1,A2, A3, A4, AND M1 PLUS SMALL DOCUMENTS, FORWARDED SAME TO RON HILL. 3/16/00 DAR
Routing - PLAN CHECK3/7/2000 3/13/2000 FAIL
DetailsRon Hill
fAXED AND MAILED REQUIREMENTS TO THE ARCHITECT, ROUTE TO FIRE DEPARTEMENT.
Telephone call  3/10/2000 DONE
CALLED JOHN COOK REQUESTING THE APPLICATION. MR. DOWNING TOOK APPLICATION WHEN HE TOOK BACK THE ORIGINAL SET OF PLANS.KMM
Routing - PLUMBING3/6/2000 3/7/2000 DONE
Routing - PUBLIC WORKS3/6/2000 3/6/2000 DONE
Plan resubmittals received  3/3/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEETS A1, A2, A3, A4, M-1AND ONE COPY OF STRUCT. CALCS. ROUTED TO RON HILL. THE NAME HAS CHANGED TO EMERALD MONGOLIAN. KMM
Plan Reviewer's activity  3/3/2000 FAIL
DetailsRon Hill
Plan Reviewer's activity  2/25/2000 HOLD
DetailsRon Hill
Spoke with John Cook, He has indicated that the Engineer was out of town on an emergency and that he should have the plans and engineer calcs completed by 2/28/00 0r 2-29-00
Plan Reviewer's activity  2/10/2000 HOLD
DetailsRon Hill
Plans were incomplete and did not have an architects stamp when received. Met with John Cook the proposed architect on 2/10/00 at 10:30. He indicated that he would have the architectual and plumbing plans along with the amended mechanical drawings ready to submit in approximately 10 to 12 days. The engineering calculations would follow approximately 7 days later. RMH
Recd Pcfee & Taken To Pln CK  2/9/2000 DONE
Plans ACCEPTED BY PLAN TECH  2/9/2000 FAIL
LEFT MESSAGE WITH MR. DOWNING TO CALL. PLANS ARE INCOMPLETE.
REQUIRE 1. PLAN DEMENSIONS WITH ROOM CALL OUT.
2. ARCH. FLOOR PLAN STAMPED AND SIGNED.
3. STAMPED AND SIGNED PLUMB. PLAN
4. ELEV. ON NEW BUFFET
5. VACINITY MAP
PER MARLENE WILL VOID IF ABOVE SAID ITEMS ARE NOT RECEIVED BY FEB. 18TH. KMM
Received Certificate of Value  2/9/2000 DONE
Routing Off Site - C.D.H2/9/2000 2/9/2000 PASS
Routing - PLAN CHECK3/17/2000   PEND