Case Summary (BLD) | | | 11/13/2003 | | |
|
|
|
|
Fee Review-notes | 3/17/2000 | 3/17/2000 | 5/5/2000 | | DONE |
|
|
|
|
Fee Review-notes | 2/9/2000 | 2/9/2000 | 5/5/2000 | | DONE |
|
|
|
|
Permanent Occupancy | | 4/27/2000 | 4/27/2000 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 4/27/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8206 issued 4-27-00 to the Emerald Mongolian.
|
BLD-Final | 4/14/2000 | 4/17/2000 | 4/17/2000 | A | PASS |
Carl Dependahl
|
|
|
TAINOA ###-#### Ok for perm. 4/17/00 2:05:41 PM
|
BLD-Final | 4/11/2000 | 4/14/2000 | 4/14/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-####---tainoa fn occ late pm Recall after fire. 4/17/00 1:34:06 PM
|
FIRE-Final Inspection | 4/13/2000 | 4/14/2000 | 4/14/2000 | P | PASS |
Joe Tawney
|
|
|
###-#### Final ok for perm. occ. 4/17/00 9:26:21 AM
|
FIRE-Final Inspection | 4/11/2000 | 4/13/2000 | 4/13/2000 | P | FAIL |
Joe Tawney
|
|
|
###-####--tainoa --fire fn Final fail not ready for inspec. 4/14/00 10:55:57 AM
|
BLD-Framing/Rough-in | 3/23/2000 | 3/24/2000 | 3/24/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/23/2000 at 12:44:07. Contact: ###-####. 1hr shaft & post/beam ok 3/24/00 2:03:55 PM
|
BLD-Foundation | 3/20/2000 | 3/20/2000 | 3/20/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### Need plbg. ok. 3/21/00 9:29:03 AM
|
Routing - FIRE | 3/13/2000 | 3/17/2000 | 3/17/2000 | | PASS |
Sam Rogers
|
|
|
|
Plan assigned to (R_H) | 2/10/2000 | 2/10/2000 | 3/17/2000 | | PASS |
|
|
|
3/17/2000 14:45:48 RMH - activity updated through activity BLDA022 from case BLD00-00293.
|
Plan assigned to (MYS) | 2/9/2000 | 2/9/2000 | 3/17/2000 | | PASS |
Marlene Southard
|
|
|
3/17/2000 14:45:48 RMH - activity updated through activity BLDA022 from case BLD00-00293.
|
Plan Review Completed(1st rev) | | | 3/17/2000 | | FAIL |
Sam Rogers
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/17/2000 | | PASS |
Ron Hill
|
|
|
|
Inspection Record Card- Bld | | | 3/17/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/17/2000 | | DONE |
|
|
|
|
Telephone call | | | 3/17/2000 | | DONE |
|
|
|
LEFT MESS FOR KAINOA DOWNING THAT PERMIT IS READY
|
Issue PAID IN FULL permit | | | 3/17/2000 | | DONE |
|
|
|
|
Receive PAYMENT IN FULL PRINT | | | 3/17/2000 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/16/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM JOHN COOK ARCHITECT, TWO SETS OF SHEETS A1,A2, A3, A4, AND M1 PLUS SMALL DOCUMENTS, FORWARDED SAME TO RON HILL. 3/16/00 DAR
|
Routing - PLAN CHECK | 3/7/2000 | | 3/13/2000 | | FAIL |
Ron Hill
|
|
|
fAXED AND MAILED REQUIREMENTS TO THE ARCHITECT, ROUTE TO FIRE DEPARTEMENT.
|
Telephone call | | | 3/10/2000 | | DONE |
|
|
|
CALLED JOHN COOK REQUESTING THE APPLICATION. MR. DOWNING TOOK APPLICATION WHEN HE TOOK BACK THE ORIGINAL SET OF PLANS.KMM
|
Routing - PLUMBING | 3/6/2000 | | 3/7/2000 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 3/6/2000 | | 3/6/2000 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/3/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A1, A2, A3, A4, M-1AND ONE COPY OF STRUCT. CALCS. ROUTED TO RON HILL. THE NAME HAS CHANGED TO EMERALD MONGOLIAN. KMM
|
Plan Reviewer's activity | | | 3/3/2000 | | FAIL |
Ron Hill
|
|
|
|
Plan Reviewer's activity | | | 2/25/2000 | | HOLD |
Ron Hill
|
|
|
Spoke with John Cook, He has indicated that the Engineer was out of town on an emergency and that he should have the plans and engineer calcs completed by 2/28/00 0r 2-29-00
|
Plan Reviewer's activity | | | 2/10/2000 | | HOLD |
Ron Hill
|
|
|
Plans were incomplete and did not have an architects stamp when received. Met with John Cook the proposed architect on 2/10/00 at 10:30. He indicated that he would have the architectual and plumbing plans along with the amended mechanical drawings ready to submit in approximately 10 to 12 days. The engineering calculations would follow approximately 7 days later. RMH
|
Recd Pcfee & Taken To Pln CK | | | 2/9/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/9/2000 | | FAIL |
|
|
|
LEFT MESSAGE WITH MR. DOWNING TO CALL. PLANS ARE INCOMPLETE.
REQUIRE 1. PLAN DEMENSIONS WITH ROOM CALL OUT.
2. ARCH. FLOOR PLAN STAMPED AND SIGNED.
3. STAMPED AND SIGNED PLUMB. PLAN
4. ELEV. ON NEW BUFFET
5. VACINITY MAP
PER MARLENE WILL VOID IF ABOVE SAID ITEMS ARE NOT RECEIVED BY FEB. 18TH. KMM
|
Received Certificate of Value | | | 2/9/2000 | | DONE |
|
|
|
|
Routing Off Site - C.D.H | 2/9/2000 | | 2/9/2000 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/17/2000 | | | | PEND |
|
|
|
|