PubWorks Occupancy Approval | 1/21/2005 | 1/21/2005 | 1/21/2005 | | DONE |
|
|
|
finaled without PW approval, requested engineer letter 8/28/00, no letter received. Drive-by shows complete 1/21/05. R.Rokovitz
|
Fee Review-notes | 2/10/2000 | 2/10/2000 | 3/29/2001 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 8/31/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8352 issued 8-31-00 to the Parkcenter Montessori School.
|
BLD-Final | 8/29/2000 | 8/30/2000 | 8/30/2000 | A | PART |
Jim Storey
|
|
|
GREG-- ###-#### FN OCC final ok pending p/w sign off. 8/30/2000 4:07:50 PM
|
Permanent Occupancy | | 8/30/2000 | 8/30/2000 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 8/30/2000 | | PASS |
|
|
|
ALL COMPLETED BUT I AM HAVING AN ADDITIONAL TREE PLANTED IN RAPARIAN AREA . ALL OTHER CONDITIONS MET, FINAL SIGNED OFF.
|
Plan resubmittals received | | | 8/29/2000 | | DONE |
|
|
|
RECEIVED THREE COPIES OF REVISED A1.0 SHEET. PUT ONE COPY IN RECORDS AND ROUTED OTHER TWO COPIES TO INSPECTOR (JIM STOREY) KMM
|
BLD-Final | 8/23/2000 | 8/28/2000 | 8/28/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/23/2000 at 17:26:02. Contact: ###-####. mitals of flod plain to jim wyilie public works waiting for responce/ waitting for p&z sign off no insp. preformed at this time. 8/29/2000 2:11:51 PM
|
FIRE-Final Inspection | 8/25/2000 | 8/28/2000 | 8/28/2000 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 09:49:11. Contact: ###-####. 8/28/2000 12:55:31 PM
|
FIRE-Final Inspection | 8/23/2000 | 8/24/2000 | 8/24/2000 | P | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 08/23/2000 at 17:24:39. Contact: ###-####. Final Fail C/N issued 8/25/2000 7:38:16 AM
|
Plan resubmittals received | | | 8/24/2000 | | DONE |
|
|
|
RECEIVED ONE COPY OF REVISED PLANS C1.0a FROM LEE RICE. ROUTED TO RECORDS. KMM
|
BLD-Other | 8/1/2000 | 8/1/2000 | 8/1/2000 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/01/2000 at 07:21:22. Contact: ###-####. ceilling ok for cover. 8/1/2000 2:29:57 PM
|
BLD-Other | 7/28/2000 | 7/31/2000 | 7/31/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/28/2000 at 15:02:36. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/27/2000 | 6/28/2000 | 6/28/2000 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/27/2000 at 21:30:15. Contact: ###-####. interior sheer ok. 6/28/00 3:26:28 PM
|
BLD-Framing/Rough-in | 6/23/2000 | 6/26/2000 | 6/26/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/23/2000 at 15:44:17. Contact: ###-####. archived truss repair and field cert. from idaho truss. 6/26/00 11:21:08 AM
|
BLD-Framing/Rough-in | 6/22/2000 | 6/23/2000 | 6/23/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/22/2000 at 11:42:44. Contact: ###-####. girders west side of bldg require nailling. letter from truss engineer to feild verify truss repair inthe field for approval of patch design. ok to rock east and center portion of bld./ arch to submit revised plan to justify flood plan requirment of play ground equment. 6/23/00 10:11:27 AM
|
BLD-Framing/Rough-in | 6/20/2000 | 6/21/2000 | 6/21/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/20/2000 at 16:05:47. Contact: ###-####. ok to insulate. 6/21/00 10:16:41 AM
|
BLD-Framing/Rough-in | 6/1/2000 | 6/1/2000 | 6/1/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/01/2000 at 08:49:55. Contact: ###-####.
|
BLD-Concrete | 5/8/2000 | 5/9/2000 | 5/9/2000 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/08/2000 at 16:59:19. Contact: ###-####.
|
Additional plans submitted | | | 5/3/2000 | | DONE |
|
|
|
RECEIVED WASTE AND VENT PLANS TWO SHEETS EACH OF P-1 AND P-2 FROM TAMURA AND ASSOCIATES, FORWARDED SAME TO BILL VANDEGRIFT. 5/3/00 DAR
|
FIRE-Conference | 5/2/2000 | 5/2/2000 | 5/2/2000 | | PART |
Rick Jackson
|
|
|
reviewed plans at job site - superindentant not there; access still not resolved
|
BLD-Foundation | 4/19/2000 | 4/20/2000 | 4/20/2000 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/19/2000 at 14:53:48. Contact: ###-####. walls rebar and hold downs ok for placement. 4/20/00 2:02:10 PM
|
BLD-Footing | 4/17/2000 | 4/18/2000 | 4/18/2000 | A | PASS |
Jim Storey
|
|
|
###-#### ft ok rebar ok grund in place. 4/18/00
|
BLD-Footing | 4/14/2000 | 4/17/2000 | 4/17/2000 | A | FAIL |
Tom Arcoraci
|
|
|
Greg Bolton ###-#### No app plans Elec. ground in ft. 4/17/00 1:24:02 PM
|
(F) Reprint permit | | | 4/17/2000 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 4/13/2000 | | 4/14/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/14/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/14/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/14/2000 | | DONE |
|
|
|
|
Telephone call | | | 4/14/2000 | | DONE |
|
|
|
called left message w/doug gave dollar amount also told him that we needed something from achd for impact fees.
|
Issue PAID IN FULL permit | | | 4/14/2000 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 2/28/2000 | | 4/14/2000 | | PASS |
Mike Otto
|
|
|
4/14/2000 14:51:29 MLO - activity updated through activity BLDA022 from case BLD00-00310.
|
Plan resubmittals received | | | 4/13/2000 | | DONE |
|
|
|
RECEIVED FIVE COPIES OF REVISED C1.0 SHEETS. ROUTED THREE TO BRIAN M. AND TWO TO MIKE OTTO. ALSO RECEIVED TWO COPIES OF SHEET A1.0 AND ONE COPY OF ELEVATION CERT. ROUTED PLANS TO MIKE O. AND ELEVATION CERT. TO BRIAN M. KMM
|
Routing - PUBLIC WORKS | 4/11/2000 | | 4/12/2000 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISIONS. PER BRIAN M. KMM
|
Plan resubmittals received | | | 4/11/2000 | | DONE |
|
|
|
received 5 copies of revised sheets A1.0 and C1.0 and two copies of elevation cert. Routed two copies of plans to Mike O. and three to Brian M. kmm
|
Meeting | | | 4/3/2000 | | PEND |
|
|
|
MEETING WITH PLANNING , PUBLIC WORKS AND PLAN REVIEW TO DISCUSS PROJECT BEING IN THE FLOOD WAY AND BUILDING IN THE FLOOD PLAIN.
|
Routing - PLUMBING | 3/28/2000 | | 3/29/2000 | | DONE |
|
|
|
|
Routing Off Site - C.D.H | 3/28/2000 | | 3/28/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 3/27/2000 | | 3/27/2000 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISIONS PER BRIAN MURPHY. 3/28/00 DAR
|
Routing - PLAN CHECK | 3/24/2000 | | 3/27/2000 | | PASS |
|
|
|
ON 4-3-00 IT WAS DETERMINED BY PUBLIC WORKS THAT THE BUILDING IS IN THE FLOOD PLAIN THEREFORE THE APPROVAL HAS BEEN WITHDRAWN MLO
|
Routing - PLAN CHECK | 3/17/2000 | | 3/24/2000 | | FAIL |
|
|
|
MISSING REVISED PLAN SHEET A2.4. LEFT MESSAGE WITH ARCHITECT TO PROVIDE SHEETS. MLO
|
Plan resubmittals received | | | 3/24/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF SHEETS A2.4 AND A2.5 ROUTED TO MIKE O. KMM
|
Routing - FIRE | 3/21/2000 | 3/21/2000 | 3/21/2000 | | PASS |
Bill Alexander
|
|
|
Occupancy requires site access verification and a hydrant on the north approved side of this structure. 04/28/2000, revised site plan and a letter provide requireing the hydrant placement to be provided on additional building on the north side of this facility area. *JWA*
|
Plan resubmittals received | | | 3/20/2000 | | DONE |
|
|
|
PLAN RESUBMITTALS RECEIVED FROM KARTCHNER ENGINEERING AND TAMURA AND ASSOCIATES, TWO SETS OF SHEETS P-1 AND P-2, FORWARDED TO MIKE OTTO. 3/20/00 DAR
|
Plan resubmittals received | | | 3/16/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A2.1, A2.5, A4.0, A4.1, A9.0, ONE COPY OF RESPONSE LETTER, ONE COPY OF CALCS. AND ONE COPY OF AN EVALUATION REPORT. ROUTED TO MIKE O. KMM
|
Routing - PUBLIC WORKS | 3/6/2000 | | 3/10/2000 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISIONS PER BRIAN MURPHY. 3/10/00 DAR
|
Telephone call | | | 3/6/2000 | | FAIL |
Bill Alexander
|
|
|
TRIED FAXING REPORT 03/03/00 AND 03/06/00 WITH NO RESPONSE. MAILED REPORT 03/06/00.
|
Routing - FIRE | 3/2/2000 | 3/3/2000 | 3/3/2000 | | FAIL |
Bill Alexander
|
|
|
UFC access, hydrant, water flow issues, plus UBC corresponding issues
|
Routing - PLAN CHECK | 2/25/2000 | | 3/3/2000 | | FAIL |
|
|
|
CORRECTIONS SENT TO ARCHITECT. MLO
|
Plan Review Completed(1st rev) | | | 3/3/2000 | | FAIL |
Bill Alexander
|
|
|
plans sent back to plan check
|
Routing - PUBLIC WORKS | 2/18/2000 | | 2/24/2000 | | FAIL |
|
|
|
REQUIRES PROOF OF LEGAL LAND DIVISION,PER JIM RICH. REQUIRES DRAINAGE PLAN REVISION PER BRIAN MURPHY. REQUIRES SEWER PLANS TO BE SUBMITTED. PER JOHN JOHNSON. 2/24/00. DAR
|
Routing - PLUMBING | 2/24/2000 | | 2/24/2000 | | FAIL |
|
|
|
|
Routing - PLANNING | 2/11/2000 | | 2/16/2000 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/11/2000 | | DONE |
|
|
|
|
Plan assigned to (MYS) | 2/10/2000 | 2/10/2000 | 2/10/2000 | | DONE |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/10/2000 | | DONE |
|
|
|
|
Application received | | | 2/10/2000 | | |
|
|
|
|