Description
PINTAIL CENTER * TO BUILD A NEW 54,000 SQ. FT., ONE STORY SHELL BUILDING. CONSTRUCTED OF CONCRETE TILT-UP EXTERIOR WALL PANELS AND STEEL STRUCTURAL INTERIOR FRAME AND ROOF SYSTEM. THE PROPOSED FUTURE USES ARE B, M, S-1 & F-1 OCCUPANCIES. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE BEING USED FOR ALLOWABLE AREA INCREASE (UNLIMITED AREA ALLOWED). ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. DRH99-00229 PC#125-00,(FOUNDATION PERMIT #BLD00-00402) JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes2/18/20002/18/20003/29/2001 DONE
Letter of compliance  12/11/2000 DONE
Letter of Compliance #20037 issued 12/11/00.
BLD-Final12/6/200012/7/200012/7/2000APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/06/2000 at 13:33:48. Contact: ###-####. 12/7/2000 11:00:15 AM
FIRE-Final Inspection12/5/200012/6/200012/6/2000PPASS
DetailsJoe Tawney
JC ###-#### Ok for certificate of completion 12/6/2000 5:15:26 PM
FIRE-Final Inspection9/5/20009/6/20009/6/2000PFAIL
DetailsJoe Tawney
JC ###-#### Fail Alarm system 9/7/2000 7:52:46 AM
BLD-Framing/Rough-in7/25/20007/25/20007/25/2000PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 07/25/2000 at 08:54:42. Contact: ###-####.c/n, need eng's report,complete glazing, verify approved fabrication of joists/beams/girders. 7/25/2000 4:16:29 PM
FIRE-Sprinkler Rough-in4/11/20004/11/20004/11/2000PPART
DetailsJoe Tawney
per joe tawney---mick ###-#### -unground insp Ok on supply line cover 4/12/00 8:37:05 AM
(F) Reprint permit  3/28/2000 DONE
Plan assigned to (JCM)2/22/20002/22/20003/27/2000 PASS
DetailsJohn Menard
Routing - PLAN CHECK3/6/2000 3/27/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/27/2000 PASS
Inspection Record Card- Bld  3/27/2000 DONE
Print Occupancy Form  3/27/2000 DONE
Telephone call  3/27/2000 DONE
called Cornel Larson ###-#### permit ready
Issue PAID IN FULL permit  3/27/2000 DONE
Routing Off Site - STRUCTURAL3/17/2000 3/23/2000 PASS
CONTACTED PDQ TO TAKE REVISED SHEET AND STRUCTURAL REVIEW COMMENTS, DATED 3-17-2000, TO OUTSIDE ENG. KMM RECEIVED APPROVAL FROM CONSULTING ENGINEER VIA E-MAIL, HARD COPY TO FOLLOW.
4/10/00 RECEIVED STRUCTURAL PLAN CHECK REVIEW FROM OUTSIDE ENG. ROUTED TO JOHN M. KMM
Plan resubmittals received  3/17/2000 DONE
PLAN RESUBMITTALS RECEIVED FROM LARSON ARCHITECTS THREE COPIES OF SHEET S-4 AND 3 COPIES OF SMALL DOCUMENTS, ALL FORWARDED TO JOHN MENARD. 3/17/00 DAR
Plan resubmittals requested  3/15/2000 PEND
E-MAILED CORNEL LARSON WITH A COPY OF THE COMMENT LIST FROM THE CONSULTING ENGINEER REQUESTING REVISIONS.
Routing Off Site - STRUCTURAL2/22/2000 3/14/2000 PEND
SENT PLANS TO CONSULTANTING ENGINEER VIA PDQ. 2/22/00
Routing - PLAN CHECK3/3/2000 3/6/2000 PEND
Routing - FIRE3/6/2000 3/6/2000 PASS
DetailsBill Alexander
Routing - FIRE3/1/20003/3/20003/3/2000 FAIL
DetailsBill Alexander
Lack available fire sprinkler design flows.
Plan Review Completed(1st rev)  3/3/2000 FAIL
DetailsBill Alexander
Plan Reviewer's activity  3/1/2000 PASS
PLANS REVIEWED AND APPROVED WITH ATTACHED COMMENT LIST. WAITING FOR COMMENT LIST BACK FROM CONSULTING STRUCTURAL ENGINEER.
Routing - PLAN CHECK2/28/2000 3/1/2000 PEND
Routing - PLANNING2/25/2000 2/28/2000 PASS
Approve per DRH99-229
Routing - PLUMBING2/24/2000 2/25/2000 PASS
PASSED WITH CONDITIONS. FOUNDATION FAILED AT THIS TIME. KMM
Routing - PUBLIC WORKS2/23/2000 2/24/2000 DONE
Plans ACCEPTED BY PLAN TECH  2/22/2000 DONE
Application received  2/18/2000  
Recd Pcfee & Taken To Pln CK