Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-00494
StatusFinaled
Name NEMEC CONSTRUCTION
Site Address 3181 S MILLSPUR WAY
Project NameFLOODPLAIN
Customer Number853-7200
ePlanReviewNo
Description
To construct a 3366 sq. ft. two story single family dwelling (1956 sq. ft. first floor/1410 sq. ft. second floor) with a attached 1270 sq. ft. three car garage and a 104 sq. ft. covered front porch. Per approved plans, engineering and requirement list. This is a solar protected lot. CUP98-0116 per Roger Jones. THIS LOT IS WITHIN THE FLOODPLAIN AREA. A ELEVATION CERTIFICATE IS REQUIRED BEFORE CALLING FOR A ROUGH FRAMING INSPECTION. JIM WYLLIE HAS RELEASED THE NON-BUILD IF CONSTRUCTED IN ACCORDANCE TO THE INFORMATION SUPPLIED BY QUADRANT. PC#146 (SAM)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/28/20008/29/20008/29/2000APASS
DetailsAlan Hauser
c/c#19280 8/29/2000 12:18:19 PM
BLD-Final8/24/20008/24/20008/24/2000PFAIL
DetailsRuss Owen
Nick; ###-#### Needs handrail to code. 8/25/2000 9:50:10 AM
BLD-Energy code compliance5/19/20005/22/20005/22/2000PPASS
DetailsRuss Owen
nick ###-#### energy code insp. Reasigned to 407 by 325.
Override - Parcel Holds  5/19/2000  
BLD-Framing/Rough-in5/16/20005/17/20005/17/2000PFAIL
DetailsRuss Owen
###-#### C/N posted 5/18/00 3:04:37 PM
BLD-Framing/Rough-in5/16/20005/16/20005/16/2000PCANC
DetailsRuss Owen
###-#### Will recall when ready 5/17/00 1:55:25 PM
Override - Parcel Holds  5/16/2000  
Override - Parcel Holds  5/16/2000  
Override - Parcel Holds  5/16/2000  
Override - Parcel Holds  5/16/2000  
BLD-Framing/Rough-in5/15/20005/15/20005/15/2000PPASS
DetailsRuss Owen
Ok to side.
BLD-Framing/Rough-in5/15/20005/15/20005/15/2000AFAIL
DetailsRuss Owen
Left a C/N, has engineer approval items on his correction list?
BLD-Framing/Rough-in5/12/20005/15/20005/15/2000APART
DetailsBob Archibald
###-#### shear wall. Reasigned to Russ.
Override - Parcel Holds  5/15/2000  
Override - Parcel Holds  5/12/2000  
Plan Reviewer's activity  5/2/2000 DONE
FLOOD PLAIN ELEVATION CERTIFICATE SUBMITTED BY STEVE SWEET, P.E. AND APPROVED BY JIM WYLLIE. COPY ON FILE IN PLAN REVIEW OFFICE.
BLD-Framing/Rough-in5/1/20005/1/20005/1/2000AFAIL
DetailsRuss Owen
Need engineers calcs and clean plans. Also noted corrections with wall to roof connections.
Override - Parcel Holds  5/1/2000  
Override - Parcel Holds  5/1/2000  
Override - Parcel Holds  4/28/2000  
Override - Parcel Holds  4/28/2000  
Override - Parcel Holds  4/28/2000  
Override - Parcel Holds  4/28/2000  
PLANS/APPL TAKEN TO FRONT DESK  3/24/2000 DONE
Override - Parcel Holds  3/24/2000  
Override - Parcel Holds  3/24/2000  
Issue PAID IN FULL permit  3/24/2000 DONE
Plan assigned to (SAM)3/4/2000 3/24/2000 PASS
DetailsSteve Munroe
3/24/2000 14:41:41 SAM - activity updated through activity BLDA022 from case BLD00-00494.
Additional plans submitted  3/23/2000 PEND
New engineering with plan update submitted by Jay with Dakota at 16:00 on the 23rd of March.
BLD-Foundation3/21/20003/22/20003/22/2000PPART
DetailsBob Archibald
###-#### late pm. 2&3 rows #4 horizontal.Straps being placed, no one on site.
BLD-Foundation3/22/20003/22/20003/22/2000APART
DetailsWes Worcester
Incomplete- hold downs being placed appears ok.
Override - Parcel Holds  3/22/2000  
Override - Parcel Holds  3/22/2000  
Override - Parcel Holds  3/21/2000  
BLD-Footing3/17/20003/20/20003/20/2000APART
DetailsBob Archibald
###-#### as per Tim Hogland this inspection shall be done at 10 am. Early start, setbacks/soil appear OK.
Override - Parcel Holds  3/17/2000  
Plan Reviewer's activity  3/6/2000 PEND
Called and left a message for Doug Unger to call me. I have questions on the engineering. First and second floor NOT matching what is drawn. I also called and left a message with Brian to have Jay, with Dakota, to call me. 3/6/00 8:15

10:45 3/15/00 Recieved a call from Jay with Dakota. He was concerned that this project might affect his working relationship with the city. I informed him that it would not and that we are not picking on Nemec or him. This is just a house that we/I have concerns with on the engineering and that I want to make sure that it is structurally sound. I told him that I would keep him informed as I find things out.
Pending Assignment by DJO2/28/2000 3/4/2000 DONE
DetailsDan Overy
Routing - PUBLIC WORKS2/28/20002/28/20003/1/2000 DONE
Routing - PLANNING2/28/20002/28/20003/1/2000 DONE
Application received  2/28/2000  
Routing Off Site - STRUCTURAL3/10/20003/10/2000  PEND
Set to consulting engineer to review.
Routing - PLAN CHECK3/1/20003/1/2000  PEND
Early Start Permit    PEND
early start issued per tim hogland 3/17/00 pe
Case Summary (BLD)     
Plan Review Report     
Plan Review Report