BLD-Final | 12/11/2000 | 12/11/2000 | 12/11/2000 | P | PASS |
Jim Storey
|
|
|
###-#### l/c iused. 12/12/2000 11:44:17 AM
|
Override - Parcel Holds | | | 12/11/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 12/11/2000 | | |
|
|
|
|
BLD-Final | 12/4/2000 | 12/4/2000 | 12/4/2000 | P | FAIL |
Jim Storey
|
|
|
fn 0cc randy ###-#### c/n on site. 12/4/2000 3:43:34 PM
|
Override - Parcel Holds | | | 12/4/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 12/4/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 11/8/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 11/8/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 6/14/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 6/14/2000 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/31/2000 | 6/1/2000 | 6/1/2000 | A | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/31/2000 | 5/31/2000 | 5/31/2000 | A | PASS |
Jim Storey
|
|
|
Randy ###-####
|
Override - Parcel Holds | | | 5/31/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 5/31/2000 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/30/2000 | 5/30/2000 | 5/30/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/30/2000 at 08:18:22. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/30/2000 at 10:00:21.
|
BLD-Framing/Rough-in | 5/25/2000 | 5/25/2000 | 5/25/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 05/25/2000 at 09:38:48. Contact: ###-####. safety glazing for final 5/26/00 1:49:17 PM
|
BLD-Framing/Rough-in | 5/23/2000 | 5/23/2000 | 5/23/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/23/2000 at 09:07:52. Contact: ###-####. recieved engineering ok c/n 1 hr soffit west side no openings. 5/23/00 2:04:04 PM
|
BLD-Framing/Rough-in | 5/8/2000 | 5/8/2000 | 5/8/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/08/2000 at 08:58:50. Contact: ###-####.exterior nailling ok as long as re-engineering is not a change from oridginal. 5/8/00 3:13:03 PM
|
BLD-Framing/Rough-in | 5/3/2000 | 5/3/2000 | 5/3/2000 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/03/2000 at 07:08:27. Contact: ###-####. c/n on site russ o c/n pending. 5/3/00 4:39:21 PM
|
BLD-Framing/Rough-in | 4/20/2000 | 4/21/2000 | 4/21/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/20/2000 at 08:02:20. Contact: ###-####. C/N posted, requires engineers review. 4/21/00 1:52:18 PM
|
BLD-Foundation | 3/29/2000 | 3/29/2000 | 3/29/2000 | P | PART |
Jim Storey
|
|
|
###-#### ken
|
BLD-Foundation | 3/29/2000 | 3/29/2000 | 3/29/2000 | P | PART |
Jim Storey
|
|
|
###-#### kenPLACED W/O INSP. 3/31/00
|
BLD-Footing | 3/27/2000 | 3/27/2000 | 3/27/2000 | P | PART |
Tom Arcoraci
|
|
|
after 2:00\\###-#### pager Rebar that is placed ok 3000 Speced. have eng ok 2500 or provide cys. test 3/28/00 9:02:47 AM
|
Issue PAID IN FULL permit | | | 3/20/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 3/9/2000 | | DONE |
|
|
|
REVISIONS RECEIVED
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2000 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/9/2000 | | DONE |
|
|
|
|
Plan Review Report | | | 3/9/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/9/2000 | | DONE |
|
|
|
|
Telephone call | | | 3/9/2000 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 3/7/2000 | 3/7/2000 | 3/7/2000 | | DONE |
Dan Overy
|
|
|
|
Plan Reviewer's activity | | | 3/7/2000 | | DONE |
|
|
|
additional information required from engineer and architect. responsible persons have been notified.
|
Plans ACCEPTED BY PLAN CHECK | | | 3/7/2000 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 2/28/2000 | 2/28/2000 | 3/3/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 2/28/2000 | 2/28/2000 | 3/2/2000 | | DONE |
|
|
|
Scott bringing a revised site plan that shows a driveway.
per revised site plan.
|
Application received | | | 2/28/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 3/3/2000 | 3/3/2000 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 2/28/2000 | | | | PEND |
Dan Overy
|
|
|
|
Print permit w/o conditions | | | | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|