Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD00-00497
StatusExpired
Name STEVE BARFUS / RAYS AUTO BODY
Site Address 5914 W STATE ST
Project NameRAYS AUTO BODY
Customer Number 
ePlanReviewNo
Description
TO CUT AND REMOVE PORTION OF CONCRETE FLOOR, EXCAVATE, FORM & POUR A 240 SQ. FT. PIT AS PART OF THE MECHANICAL EXHAUST PLENUM TO SERVE AS PART OF THE NOVA-VERTA USA, 26' EASY PIT-SIDE, LISTED SPRAY PAINT BOOTH. BOOTH PERMITTED SEPERATELY UNDER BLD00-00404. PLENUM PIT IS UNDER APPROXIMATELY 2/3 OF THE BOOTH FLOOR AND UNDER THE SIDE MOUNT MECHANICAL UNITS THAT SERVE THE PAINT BOOTH. PIT TO BE 1'-4" DEEP WITH REINFORCED CONCRETE BASE AND SIDE WALLS. ALL PER APPROVED PLANS SUPPLIED BY PAINT BOOTH MANUFACTURE THROUGH CONTRACTOR. REQUIREMENTS FOR SPRINKLER SYSTEM IN PLENUM AREA SHALL BE AS REGULATED BY THE FIRE DEPARTMENT. SPILL CONTROL AND OR COLLECTION OF LIQUIDS WITHIN THE MECHANICAL PIT SHALL BE HANDLED & ABATED AS REGULATED BY THE UNIFORM FIRE CODE. THE ENTIRE SYSTEM SHALL BE IN PLACE, WITH ALL COMPONENTS OF THE LISTED SPRAY PAINT BOOTH INSTALLED AND APPROVED. THE FIRE DEPARTMENT SHALL WITNESS THE OPERATION OF THE BOOTH PER LISTING AND A LETTER OF COMPLETION COMPLIANCE ISSUED TO THE TENANT BEFORE THE SPRAY PAINT BOOTH UNIT SHALL BE CONSIDERED APPROVED FOR OPERATION AND USE. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Foundation3/7/20003/8/20003/8/2000APASS
DetailsRuss Owen
###-#### Foundation complete. 3/9/00 2:12:24 PM
BLD-Footing3/6/20003/7/20003/7/2000APASS
DetailsRuss Owen
###-####
BLD-Footing3/3/20003/6/20003/6/2000ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/03/2000 at 15:44:12. Contact: .
Plan assigned to (DRS)2/28/20002/29/20002/29/2000  
DetailsDan Stuart
Routing - PLAN CHECK2/29/20002/29/20002/29/2000 PASS
ACCEPTED PLAN DETAILS PROVIDED BY NOVA VERTA USA, SPRAY PAINT BOOTH MANUFACTURE, FOR SIZE AND DESIGN DETAIL OF THE PIT. THE UNIT IS NOT A STRUCTURAL SUPPORT UNIT FOR THE BUILDING BUT WILL HAVE VEHICLE'S, ETC. MOVE & PARK OVER THE GRATE TO ALLOW THE REQUIRED DESIGN AIR FLOW AS PART OF THE APPROVED SPRAY PAINT BOOTH DESIGN. THE UNIT AND ALL FUNCTIONAL COMPONENTS ARE REGULATED UNDE ARTICLE 45 UFC & NFPA 33, AS REGULATED BY THE FIRE DEPARTMENT.
Plan Reviewer's activity  2/29/2000 PASS
VERIFIED WITH SAM ROGERS & BILL ALEXANDER, FIRE CODE ANALYSTS, THAT THE PRESENTED SYSTEM AS PART OF THE SPRAY PAINT BOOTH INSTALLATION PRESENTED NO CONCERNS OR ADDITIONAL PLAN REVIEW CONDITIONS. OKAY TO PROCESS FOR ISSUING PERMIT.
PLANS/APPL TAKEN TO FRONT DESK  2/29/2000 PASS
APPROVED AS PART OF A LISTED SPRAY PAINT BOOTH PER FIRE CODE. ROUTING TO FRON DESK FOR ISSUANCE OF PERMIT.
Print Occupancy Form  2/29/2000 DONE
Inspection Record Card- Bld  2/29/2000 DONE
Telephone call  2/29/2000 DONE
called left message gave dollar amount
Issue PAID IN FULL permit  2/29/2000 DONE
Application received  2/28/2000  
Plans ACCEPTED BY PLAN CHECK  2/28/2000 DONE
PLANS PROVIDED TO CONTRACTOR THROUGH THE SPRAY PAINT BOOTH MANUFACTURE, NOVA VERTA USA, WITH DIMENSIONS & REINFORCEMENT INDICATED ON THE PLANS.
Meeting  2/28/2000  
MET WITH ERIC LARSEN OF LARSEN'S CONCRETE CONCERNING PERMIT FOR MECHANICAL EXHAUST PIT TO BE INSTALLED PER MANUFACTURE AS PART OF THE SPRAY PAINT BOOT AT RAYS OUTO BODY & PAINT SHOP. THE OWNER, STEVE BARFUS DOES NO WANT THE MECHANICAL PLENUM PIT TO PART OF THE SPRAY PAINT BOOTH PERMIT HE OBTAINED (STEVE BARFUS) AND REQUIRES THE CONCRETE CONTRACTOR TO OBTAIN HIS OWN PERMIT. ACCEPTED DESIGN PLANS FROM SPRAY PAINT BOOTH MANUFACTURE.