Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-00498
StatusFinaled
Name JAY BLACKER (OWN REP)
Site Address 1501 S FEDERAL WAY (1ST FLR)
Project NameVIEW POINT-1ST FLR
Customer Number 
ePlanReviewNo
Description
(TOUCH AMERICA - BOISE POINT OF PRESENCE) This building is not fire sprinklered. To remodel a 1,174 square foot room on the first floor of an existing office building. The room will be used as a fiber-optics equipment facility (control room and telephone equipment room). Outside, the work is to include a backup generator, two condensing units, and an exterior concrete equipment pad. Inside, the work is to include two air handling units, an interior unistrut grid, a UPS lead-acid battery system, a 2-hr shaft to the roof, and miscellaneous equipment all per approved drawings and plan review conditions on file. PC-151-00 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes2/29/20002/29/20009/17/2001 DONE
BLD-Final8/31/20018/31/20018/31/2001PPASS
DetailsJim Storey
Tammy, ###-#### - Touch America - Cathy has the card final ok 8/31/2001 2:22:52 PM
Permanent Occupancy 8/31/20018/31/2001 DONE
Details
Permanent occupancy  8/31/2001 DONE
Perm. Occ. Cert. #8804 issued 8-31-01 to Touch America.
FIRE-Final Inspection8/30/20018/30/20018/30/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 8/30/2001 8:46:27 AM
BLD-Conference6/19/20016/21/20016/21/2001APASS
DetailsSteven Webb
Tammy @ ###-#### wants to meet with you, Rick Jackson & Dave Lightfoot @ 10:00.
FIRE-Conference6/19/20016/19/20016/19/2001AFAIL
DetailsRick Jackson
Tammy @ ###-#### wants to meet w/you, Jim Storey & Dave Lightfoot @ 10:00. need alarm plans submitted and to test them 6/21/2001 12:50:14 PM
BLD-Final4/4/20014/4/20014/4/2001PFAIL
DetailsJim Storey
tammy ###-#### fire is also going out need all other insp. 4/4/2001 2:48:45 PM
FIRE-Final Inspection4/4/20014/4/20014/4/2001PFAIL
DetailsRick Jackson
tammy ###-#### lead acid battery sign on hallway door; rear door hardware; dampers at shaft; alarm test required with alarm plans; extinguishers require current inspection tags 4/4/2001 3:35:46 PM
Print Occupancy Form  3/30/2001 DONE
BLD-Framing/Rough-in6/9/20006/9/20006/9/2000PFAIL
DetailsJim Storey
###-#### shaft wall studs and butt lap. 6/9/00 2:34:07 PM
Issue PAID IN FULL permit  4/4/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/31/2000 PASS
Inspection Record Card- Bld  3/31/2000 DONE
Print Occupancy Form  3/31/2000 DONE
Telephone call  3/31/2000 DONE
Richard at ###-####
Plan assigned to (CJW)3/1/2000 3/31/2000 PASS
DetailsCarl Westfall
3/31/00 12:43:12 CJW - activity updated through activity BLDA022 from case BLD00-00498.
Routing - FIRE3/29/2000 3/31/2000 PASS
Routed back to Fire for further battery room review.
Plan resubmittals received  3/29/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM RICHARD KIZER FOR SAM ROGERS. FORWARDED SAME TO SAM ROGERS. 3/29/00 DAR
Routing - PLAN CHECK3/29/2000 3/29/2000 PASS
Plan Reviewer's activity  3/29/2000 PASS
Drawings approved, with conditions, after resubmittal review. The battery room issued was referred back to the Fire Department since it is regulated by the Uniform Fire Code.
Routing - FIRE3/23/20003/28/20003/28/2000 PASS
DetailsSam Rogers
Appproved with conditions.
Plan resubmittals received  3/28/2000 DONE
PLAN RESUBMITTALS RECEIVED FROM POWER ENGINEERS, TWO SETS OF SHEETS A2 AND E3. SAME FORWARDED TO CARL WESTFALL. 3/28/00 DAR
Plan Review Completed(1st rev)  3/28/2000  
DetailsSam Rogers
Plan Reviewer's activity  3/23/2000  
UBC plan review started March 22, 2000 and finished March 23, 2000. A response from the architect is required. See the conditions list.
Routing - PLAN CHECK3/7/2000 3/23/2000  
Routing - PUBLIC WORKS3/2/2000 3/7/2000 DONE
Pending Assignment by MYS3/1/2000 3/1/2000 DONE
DetailsMarlene Southard
Plan routing begun/TENANTS  3/1/2000 DONE
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  3/1/2000 DONE
Received Certificate of Value  2/29/2000 DONE
Application received  2/29/2000  
Recd Pcfee & Taken To Pln CK  2/29/2000 DONE