DOC - Permit Finaled | 1/25/2001 | 1/25/2001 | 1/25/2001 | P | PASS |
Steven Webb
|
|
|
Added by Inspector: 420 On 1/25/2001 12:40:17 PM
|
BLD-Final | 7/13/2000 | 7/14/2000 | 7/14/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/13/2000 at 22:39:28. Contact: ###-####.
|
BLD-Final | 7/12/2000 | 7/13/2000 | 7/13/2000 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/12/2000 at 23:04:47. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/2/2000 | 6/2/2000 | 6/2/2000 | A | PASS |
Russ Owen
|
|
|
|
BLD-Framing/Rough-in | 5/31/2000 | 6/1/2000 | 6/1/2000 | P | PART |
Russ Owen
|
|
|
Dan ###-#### Ok to cover all inside. 6/5/00 10:20:03 AM
|
BLD-Wall cover | 5/25/2000 | 5/26/2000 | 5/26/2000 | A | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 05/25/2000 at 13:19:53. Contact: ###-####. OK to cover- still correction on stairs. 5/26/00 12:19:47 PM
|
BLD-Wall cover | 5/24/2000 | 5/25/2000 | 5/25/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/24/2000 at 15:08:18. Contact: ###-####. Corrections not done, stairs/front wall HD's. 5/25/00 1:46:16 PM
|
BLD-Wall cover | 5/24/2000 | 5/24/2000 | 5/24/2000 | P | NR |
Russ Owen
|
|
|
|
BLD-Framing/Rough-in | 5/23/2000 | 5/24/2000 | 5/24/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/23/2000 at 16:13:45. Contact: ###-####. C/N posted 5/24/00 1:51:31 PM
|
BLD-Energy code compliance | 5/23/2000 | 5/24/2000 | 5/24/2000 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/23/2000 at 16:14:41. Contact: ###-####. Wrong insp. 5/24/00 1:51:35 PM
|
BLD-Wall cover | 5/23/2000 | 5/24/2000 | 5/24/2000 | P | CANC |
Russ Owen
|
|
|
###-####---CANC
|
BLD-Framing/Rough-in | 5/8/2000 | 5/8/2000 | 5/8/2000 | P | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 05/08/2000 at 09:07:48. Contact: ###-####. shear insp only fail need eng to verify all changes with sealed drawings or letter 5/9/00 11:07:02 AM
|
BLD-Foundation | 3/24/2000 | 3/27/2000 | 3/27/2000 | A | PART |
Wes Worcester
|
|
|
wes ###-#### Incomplete rebar installation. 3/27/00 4:30:53 PM
|
BLD-Footing | 3/23/2000 | 3/23/2000 | 3/23/2000 | P | PART |
Russ Owen
|
|
|
Wes ###-#### early pm Poured before I arrived set back and work all appears ok 3/24/00 1:07:59 PM
|
Issue PAID IN FULL permit | | | 3/9/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/7/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/7/2000 | | DONE |
|
|
|
|
Telephone call | | | 3/7/2000 | | DONE |
|
|
|
talked to cami to verify plans are ready
|
Plan assigned to (SAM) | 3/6/2000 | | 3/7/2000 | | PASS |
Steve Munroe
|
|
|
3/7/2000 13:41:57 SAM - activity updated through activity BLDA022 from case BLD00-00509.
|
Plan Reviewer's activity | | | 3/7/2000 | | DONE |
|
|
|
Called and talked to Eric Peterson with Cole. He said it would be okay for me to red-line his plans. Called and talked to Chris with AHJ. He increased a footing size and informed me on how he is transfering the load across the garage doors.
|
Pending Assignment by DJO | 3/1/2000 | | 3/6/2000 | | DONE |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 3/1/2000 | 3/1/2000 | 3/1/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 3/1/2000 | 3/1/2000 | 3/1/2000 | | DONE |
|
|
|
|
Application received | | | 3/1/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 3/1/2000 | 3/1/2000 | | | PEND |
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|