Permit Information
Permit NumberBLD00-00514
StatusFinaled
Name RALPH KRIEZENBECK
Site Address 251 E FRONT
Project NameONE FRONT ST-SHELL
Customer Number 
ePlanReviewNo
Description
ONE FRONT STREET * TO CONSTRUCT A FOUR STORY TYPE II-1HR 71,596 SQ. FT. OFFICE SHELL BUILDING W/ 41,291 TYPE I FR- BASEMENT PARKING. DRH99-00245 CUP99-00135 PC#155-00 FOUNDATION PERMIT UNDER SEPARATE PLANS BLD00-00515 GRADING PERMIT UNDER SEPARATE PLANS BLD00-00528. EXCAVATION PERMIT UNDER MIS00-00059. (MLO) SEPARATE PERMITS FOR TENANT IMPROVEMENTS ARE REQUIRED. NO OCCUPANCY AUTHORIZED UNDER THIS PERMIT. FIRE SPRINKLERS ARE USED FOR ONE-HOUR SUBSTITUTION. FIRST FLOOR - 18,497 SQ FT, SECOND FLOOR - 19,646 SQ. FT., THIRD FLOOR - 19,646 SQ. FT., FOURTH FLOOR - 13,807 SQ. FT.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/21/2006  
Case Summary (BLD)  11/4/2005  
Case Summary (BLD)  1/27/2004  
Case Summary (BLD)  5/16/2002 DONE
Telephone call  11/13/2001 DONE
talked to Ralph and he will get the information to me. value had gone down. lh
Case Summary (BLD)  10/30/2001 DONE
Case Summary (BLD)  10/3/2001 DONE
Fee Review-notes3/1/20003/1/20005/9/2001 DONE
11-5 lombard conrad arch office called and they are forwarding the statement to the owner.
Letter of compliance  5/7/2001 DONE
Letter of Compliance #21489 issued 5-7-01.
BLD-Final5/4/20015/4/20015/4/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 5/4/2001 3:35:52 PM c/n ok...ok for c/o
BLD-Conference4/26/20014/26/20014/26/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 4/26/2001 12:25:48 PM re final, complete glazing and architecturals.
BLD-Conference4/23/20014/23/20014/23/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/23/2001 2:09:26 PM rec'd eng's approval letter & MTI's affidavit.... all discrepancies ok'd by eng'r
BLD-Conference4/17/20014/17/20014/17/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/17/2001 9:31:26 AM keep c/n, need complete glazing, etc.
BLD-Final4/11/20014/11/20014/11/2001PPART
DetailsCarl Dependahl
###-####;keep c/n, all items ok except fire final and ext finish/glazing; rec'd eng's letter and affidavit ok for t/o 4/11/2001 3:33:31 PM
FIRE-Final Inspection4/11/20014/11/20014/11/2001PPASS
DetailsRick Jackson
Added by Inspector: 409 On 4/11/2001 6:14:37 PM final occupancy approved
BLD-Conference4/10/20014/10/20014/10/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 4/10/2001 2:49:07 PM re c/n of 4-9...add signs, labels at stair enclosure
FIRE-Final Inspection4/6/20014/9/20014/9/2001PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/06/2001 at 14:26:47. Contact: ###-####. azwaiting stairwell signs 4/9/2001 2:30:19 PM
BLD-Final4/6/20014/9/20014/9/2001PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/06/2001 at 14:27:41. Contact: ###-####. c/n, doors at stair towers...temp rise; firestops, complete glazing at ext; need eng's affidavit 4/9/2001 6:16:54 PM
Code Occupancy Approval  4/6/2001 PASS
Signed off today
FIRE-Alarm Testing3/28/20013/30/20013/30/2001AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 03/28/2001 at 10:10:35. Contact: ###-####. c/n issued 3/30/2001 12:48:55 PM
BLD-Wall cover3/7/20013/8/20013/8/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/07/2001 at 14:54:40. Contact: ###-####. ok to cover hvac shaft walls...per detail. 3/8/2001 4:32:34 PM
FIRE-Conference3/7/20013/8/20013/8/2001PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 03/07/2001 at 14:55:27. Contact: ###-####. requirements for ashell and core compliance 3/8/2001 2:37:44 PM
BLD-Conference3/5/20013/7/20013/7/2001APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/05/2001 at 17:03:06. Contact: ###-####.w/proj mgr re final req's 3/7/2001 12:37:06 PM
BLD-Wall cover3/5/20013/6/20013/6/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/05/2001 at 17:02:20. Contact: ###-####....WIP; wrap beams at shaft pe 3/6/2001 4:21:41 PM r de 3/6/2001 4:21:42 PM
BLD-Framing/Rough-in2/28/20012/28/20012/28/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/28/2001 11:57:14 AM complete wrapping beams and firestopping at hvac shafts; wip ok to continue
BLD-Framing/Rough-in2/19/20012/20/20012/20/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/19/2001 at 09:43:23. Contact: ###-####....rec'd detail for 1hr hvac shaft; ok to proceed per GA WP 7008 and assoc detail 2/21/2001 3:51:31 PM
BLD-Conference2/20/20012/20/20012/20/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/20/2001 5:31:16 PM NEED DETAIL FOR SHAFTWALL...G.A. OR??
BLD-Conference2/12/20012/13/20012/13/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/12/2001 at 12:52:21. Contact: ###-####....keep c/n...ok to continue, add fasteners at 1hr corr. walls 2/13/2001 12:05:48 PM
BLD-Framing/Rough-in2/13/20012/13/20012/13/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 2/13/2001 12:04:52 PM c/n; need detail, 1hr hvac shaft, not framed per plans as A.9 C-6 shows
BLD-Framing/Rough-in2/8/20012/8/20012/8/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/8/2001 10:58:08 AM wip; keep c/n. complete firestopping, etc.
BLD-Conference2/6/20012/6/20012/6/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/6/2001 4:10:31 PM w/ supt re c/n of 1-29
BLD-Framing/Rough-in1/31/20012/1/20012/1/2001AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/31/2001 at 13:49:28. Contact: ###-####.c/n, seal stair shafts, floors. box-out beams if unable to fasten gyp to framin 2/2/2001 11:47:21 AM
BLD-Conference2/1/20012/1/20012/1/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/1/2001 5:01:10 PM w supt re insp reports
BLD-Framing/Rough-in1/30/20011/31/20011/31/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/30/2001 at 15:23:51. Contact: ###-####. fireproofing at beams at gar entry ok pend report 1/31/2001 3:39:44 PM
BLD-Framing/Rough-in1/23/20011/23/20011/23/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/23/2001 10:42:33 AM restroom core framing ok; west & middle stairs...complete firestops/grouting at struct penetrations, rec'd spray-on f.p. reports for west/middle stairs ok
BLD-Other1/22/20011/22/20011/22/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/22/2001 at 09:01:00. Contact: ###-####...spray-on fire proofing...pend spec insp report 1/22/2001 5:05:33 PM
BLD-Framing/Rough-in1/22/20011/22/20011/22/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/22/2001 at 09:01:45. Contact: ###-####. 4th fl r. rms ok 1/22/2001 4:05:08 PM
BLD-Footing1/17/20011/17/20011/17/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/17/2001 at 07:33:49. Contact: ###-####. ext landscape wall 1/17/2001 12:25:08 PM
BLD-Framing/Rough-in1/17/20011/17/20011/17/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/17/2001 at 07:35:46. Contact: ###-####. walk thru, verified firestops at r.rm floors 1/17/2001 3:01:49 PM
BLD-Other1/8/20011/8/20011/9/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/08/2001 at 09:25:32. Contact: ###-####. arch pop-outs at ext wall...masonry ok 1/9/2001 10:52:03 AM
BLD-Framing/Rough-in1/8/20011/8/20011/8/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/08/2001 at 09:24:45. Contact: ###-####. int masonry walls at bsmt " lockers, 1st lift ok 1/9/2001 10:52:57 AM
Case Summary (BLD)  1/4/2001 DONE
BLD-Other12/21/200012/21/200012/21/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/21/2000 at 09:01:46. Contact: ###-####. mti onste for masonry 12/21/2000 1:32:39 PM
BLD-Foundation12/21/200012/21/200012/21/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/21/2000 at 09:02:34. Contact: ###-####. ftgs for arch. projections12/21/2000 3:27:10 PM 12/21/2000 3:28:36 PM
BLD-Framing/Rough-in12/7/200012/8/200012/8/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/07/2000 at 16:29:38. Contact: ###-####. wip roof framing; add straps at plate breaks, clips at brg ok to continue 12/8/2000 12:15:21 PM
BLD-Foundation12/5/200012/6/200012/6/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/05/2000 at 17:21:16. Contact: ###-####...masonry, mti onsite 12/6/2000 9:08:41 AM
BLD-Foundation12/5/200012/6/200012/6/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/05/2000 at 17:22:03. Contact: ###-####...mti onsite, pend report 12/6/2000 4:24:10 PM
BLD-Footing12/4/200012/5/200012/5/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/04/2000 at 09:21:59. Contact: ###-####. arch. extensions at ext wall. spec. insp onsite 12/5/2000 9:03:41 AM
BLD-Framing/Rough-in12/4/200012/4/200012/4/2000PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/04/2000 at 09:22:45. Contact: ###-####.complete detailing, clips etc at mech penthouse and roof 12/4/2000 4:04:35 PM
BLD-Conference12/4/200012/4/200012/4/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/04/2000 at 09:23:31. Contact: ###-####. met w/ supt. onsite re insp process 12/4/2000 4:05:12 PM
BLD-Other12/4/200012/4/200012/4/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/04/2000 at 09:24:25. Contact: ###-####.
BLD-Conference12/1/200012/1/200012/1/2000PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 12/1/2000 12:06:43 PM c/n issued re insp requests, need listings for penetrations at shfts, 3hr floor assy fireprotection, etc
BLD-Framing/Rough-in10/13/200010/13/200010/13/2000PPART
DetailsJim Storey
CONTINOUS INSP-OCT 15 THROUGH DEC 15---MASONARY RE-INFORCING & BEAMS --BUCK CARPER ###-#### --SPECIAL INSP IS REQUIRED BY MTI
BLD-Other10/11/200010/11/200010/11/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/11/2000 at 07:38:16. Contact: ###-####. massonary coved w/special insp. 10/11/2000 4:43:06 PM
BLD-Concrete9/25/20009/26/20009/26/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/25/2000 at 16:37:05. Contact: ###-####. first floor deck ok for concrete special insp. apptoved all deck attchment and studs. 9/26/2000 10:11:10 AM
BLD-Foundation9/1/20009/5/20009/5/2000APART
Details
Scheduled by a contractor via Hello! on 09/01/2000 at 13:49:10. Contact: ###-####. with sp insp approvals 9/5/2000 10:12:22 AM
BLD-Footing8/9/20008/10/20008/10/2000APART
Details
Scheduled by a contractor via Hello! on 08/09/2000 at 11:56:23. Contact: ###-####. 4 each col footers 1-#1 3 # 2 8/10/2000 3:12:39 PM
BLD-Foundation7/31/20008/1/20008/1/2000APART
Details
Scheduled by a contractor via Hello! on 07/31/2000 at 11:04:06. Contact: ###-####. pending sp insp approvals 8/1/00 10:15:21 AM
BLD-Foundation7/26/20007/28/20007/28/2000APART
Details
Scheduled by a contractor via Hello! on 07/26/2000 at 09:33:13. Contact: ###-####. pending sp insp approvals 7/28/2000 2:01:16 PM
BLD-Concrete7/26/20007/26/20007/26/2000PPART
Details
Scheduled by a contractor via Hello! on 07/26/2000 at 09:32:17. Contact: ###-####. pending sp insp approvals 7/27/2000 8:22:19 AM
BLD-Other7/20/20007/24/20007/24/2000APART
Details
Scheduled by a contractor via Hello! on 07/20/2000 at 07:56:32. Contact: ###-####. pending sp insp approv 7/24/2000 4:54:15 PM pending sp insp approvals 7/24/2000 4:54:36 PM
BLD-Other7/20/20007/21/20007/21/2000PPART
Details
Scheduled by a contractor via Hello! on 07/20/2000 at 07:55:47. Contact: ###-####. pending sp insp approvals 7/21/2000 2:59:22 PM
BLD-Concrete7/20/20007/21/20007/21/2000APART
Details
Scheduled by a contractor via Hello! on 07/20/2000 at 07:54:11. Contact: ###-####. pending sp insp approvals 7/21/2000 2:59:06 PM
BLD-Other7/20/20007/20/20007/20/2000PPART
Details
Scheduled by a contractor via Hello! on 07/20/2000 at 07:55:00. Contact: ###-####. pendingsp insp approvals 7/20/2000 5:59:15 PM
BLD-Foundation7/20/20007/20/20007/20/2000PPART
Details
Scheduled by a contractor via Hello! on 07/20/2000 at 07:53:26. Contact: ###-####. pending sp insp approvals 7/20/2000 5:58:43 PM
BLD-Other7/17/20007/19/20007/19/2000APART
Details
Scheduled by a contractor via Hello! on 07/17/2000 at 08:59:32. Contact: ###-####. made ok pending sp insp approvals 7/19/2000 10:26:06 PM
BLD-Other7/17/20007/18/20007/18/2000APART
Details
Scheduled by a contractor via Hello! on 07/17/2000 at 08:58:42. Contact: ###-####. pending sp insp approval 7/18/00 6:54:54 AM
BLD-Foundation7/13/20007/17/20007/17/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/13/2000 at 08:29:00. Contact: ###-####.pending s/i report. 7/17/2000 11:33:48 AM
BLD-Foundation7/13/20007/14/20007/14/2000APART
Details
Scheduled by a contractor via Hello! on 07/13/2000 at 08:28:08. Contact: ###-####. pending sp insp reports 7/14/2000 10:03:34 AM
BLD-Foundation7/13/20007/13/20007/13/2000PPART
Details
Scheduled by a contractor via Hello! on 07/13/2000 at 08:27:21. Contact: ###-####. pending sp insp 7/13/2000 6:29:40 PM
BLD-Foundation7/7/20007/7/20007/7/2000PPART
Details
Scheduled by a contractor via Hello! on 07/07/2000 at 08:03:09. Contact: ###-####. pending sp insp approvals 7/7/00 3:39:27 PM
BLD-Foundation7/5/20007/7/20007/6/2000ACANC
Details
Scheduled by a contractor via Hello! on 07/05/2000 at 15:05:24. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/06/2000 at 16:54:22.
BLD-Concrete6/29/20006/30/20006/30/2000APART
Details
Scheduled by a contractor via Hello! on 06/29/2000 at 16:18:03. Contact: ###-####. with sp insp ok.s 7/3/00 8:38:38 AM
BLD-Foundation6/28/20006/29/20006/29/2000APART
Details
Scheduled by a contractor via Hello! on 06/28/2000 at 07:36:45. Contact: ###-####. pending sp insp aprovals 6/30/00 10:06:27 AM
BLD-Foundation6/28/20006/28/20006/28/2000PPART
Details
Scheduled by a contractor via Hello! on 06/28/2000 at 07:30:56. Contact: ###-####. pending sp insp approvals 6/30/00 10:06:10 AM
BLD-Footing6/22/20006/26/20006/26/2000APART
Details
Scheduled by a contractor via Hello! on 06/22/2000 at 15:16:56. Contact: ###-####. pending sp insp approvals 6/26/00 4:59:02 PM
BLD-Footing6/22/20006/23/20006/23/2000APART
Details
Scheduled by a contractor via Hello! on 06/22/2000 at 15:16:08. Contact: ###-####. pending sp insp approvals 6/23/00 9:27:44 PM
BLD-Foundation6/21/20006/22/20006/22/2000PPART
Details
Scheduled by a contractor via Hello! on 06/21/2000 at 17:34:39. Contact: ###-####. pending sp insp approvals 6/23/00 9:27:15 PM
BLD-Foundation6/20/20006/20/20006/20/2000PPART
Details
Scheduled by a contractor via Hello! on 06/20/2000 at 07:52:19. Contact: ###-####. sp insp approval req 6/21/00 10:08:26 AM
BLD-Foundation6/19/20006/19/20006/19/2000PPART
Details
Scheduled by a contractor via Hello! on 06/19/2000 at 09:09:14. Contact: ###-####. for levator wall horiz bond beam 6/19/00 3:00:27 PM
BLD-Footing6/15/20006/16/20006/16/2000PPART
Details
Scheduled by a contractor via Hello! on 06/15/2000 at 16:49:03. Contact: ###-####. with sp insp approvals 6/19/00 6:43:35 AM
BLD-Footing6/14/20006/15/20006/15/2000APART
Details
Scheduled by a contractor via Hello! on 06/14/2000 at 16:52:31. Contact: ###-####. eng to submit on corner lap brs at 24'" transitions at the south wall 6/16/00 11:39:09 AM
BLD-Foundation6/13/20006/13/20006/13/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/13/2000 at 08:16:00. Contact: ###-####. out of time covered with special. 6/13/00 1:44:04 PM
BLD-Footing6/8/20006/9/20006/9/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/08/2000 at 16:34:07. Contact: ###-####.
BLD-Footing6/8/20006/9/20006/9/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/08/2000 at 16:34:07. Contact: ###-####.
BLD-Footing6/8/20006/8/20006/8/2000PCANC
Details
Scheduled by a contractor via Hello! on 06/08/2000 at 08:54:50. Contact: ###-####. canc by ctr 6/8/00 5:14:02 PM
BLD-Foundation6/2/20006/2/20006/2/2000PPART
Details
Scheduled by a contractor via Hello! on 06/02/2000 at 11:26:51. Contact: ###-####.
6/2/00 4:15:39 PM MADE OK WITH THE SP INSP APPRVALS MOST FORMS SET R-BAR IS PLACED 6/5/00 10:50:59 AM
BLD-Footing5/26/20005/31/20005/31/2000APART
Details
Scheduled by a contractor via Hello! on 05/26/2000 at 14:55:36. Contact: ###-####. a-line-4.2 thru 12 line and 12 line a through e/5...with sp isp blessing 5/31/00 10:54:32 AM
BLD-Concrete5/31/20005/31/20005/31/2000AFAIL
Details
Added by Inspector: 338 On 5/31/00 r-bar not placed yet all new work is much better than prior set up area
BLD-Footing5/22/20005/23/20005/23/2000APART
Details
Scheduled by a contractor via Hello! on 05/22/2000 at 14:58:56. Contact: . pending sp inspreport, pouring without isp when sp insp is required, I misunderstood pour time from phone conversation. there was no contact fromthecontr and started to pour w/o my aprovald...very poor r-bar placement ther is a lot of bar out of place b ecause of this5/23/00 3:16:01 PM 5/23/00 3:16:33 PM
(F) Reprint permit  5/23/2000 DONE
(F) Reprint permit  5/22/2000 DONE
Telephone call  5/22/2000 DONE
left mess for ralph that permit is ready -also need a.c.h.d
Issue PAID IN FULL permit  5/22/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/19/2000 DONE
Inspection Record Card- Bld  5/19/2000 DONE
Print Occupancy Form  5/19/2000 DONE
Plan assigned to (MLO)3/2/2000 5/19/2000 PASS
DetailsMike Otto
5/19/2000 08:11:00 MLO - activity updated through activity BLDA022 from case BLD00-00514.
Routing Off Site - STRUCTURAL5/9/2000 5/18/2000 PASS
CONTACTED PDQ TO TAKE ONE COPY OFRESUBMITTED CALCS. TO OUTSIDE ENG. PER MIKE O. KMM RECEIVED APPROVAL VIA PHONE AND FAX PROJECT APPROVED. MLO
BLD-Foundation6/13/20006/14/20005/14/2000PPART
Details
made pending sp insp approvalsScheduled by a contractor via Hello! on 06/13/2000 at 08:16:50. Contact: ###-####.
Routing - PLAN CHECK5/10/2000 5/12/2000 PASS
Plan resubmittals received  5/9/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM LOMBARD - CONRAD, STRUCTURAL SHEETS LABELED MIXED USE DEVELOPMENT, 300 WEST MYRTLE. CALLED SCOTT WENDALL HE STATED THAT THEY WERE THE PROJECT FOR ONE FRONT STREET AND THAT HE THOUGHT THAT THE ORIGINAL PLANS WERE LABELED THE SAME WAY. 5/9/00 DAR
Plan resubmittals received  5/9/2000 PEND
RECEIVED TWO COPIES OF SHEETS M1.0, M1.6
Plan resubmittals received  5/9/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM LOMBARD - CONRAD ARCHITECTS TWO SETS OF SHEETS M1.0 AND M1.6. FORWARDED SAME TO MIKE OTTO. ALSO RECEIVED ONE COVER LETTER AND TWO COPIES OF ADDITIONAL STRUCTURAL CALCTLATIONS. 5/9/00
Plan resubmittals received  5/8/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM LOMBARD - CONRAD ARCHITECTS, SCOTT WENDALL TWO SETS OF ARCHITECTUAL REVISIONS AND TWO SETS OF STRUCTUAL REVISIONS AND SMALL DOUCMENTS. 5/8/00 DAR
Routing - PLAN CHECK5/8/2000 5/8/2000 FAIL
additional items faxed to architect and gone over with owner at counter. MLO
Plan resubmittals requested  5/8/2000 FAIL
structural resubs were incomplete and a few additional UBC items.
Routing - PUBLIC WORKS5/3/2000 5/5/2000 PASS
Plan resubmittals received  5/5/2000 DONE
RECEIVED FIVE COPIES OF REVISED SHEET C4.0 FOR BRIAN M.
RECEIVED TWO COPIES OF REVISED SHEET C4.0 FOR MIKE O.
RECEIVED TWO COPIES OF O & M MANUAL.
ROUTED TO BRIAN M. AND MIKE O. KMM
Routing Off Site - STRUCTURAL4/4/2000 4/19/2000 FAIL
SENT STRUCTURAL CACULATIONS TO CONSULTANTING ENGINEER. 4/4/00 DAR RECEIVED E-MAIL FROM REVIEWING ENGINEER WITH ADDITIONAL CORRECTIONS. FAXED AND MAILED CORRECTIONS TO ARCHITECT. MLO
Routing - FIRE4/11/20004/17/20004/17/2000 PASS
DetailsBill Alexander
Provided (04/12/00) water supply information for overhead fire sprinkler design requirements: Static: 55psi, Residual: 20psi, Flow: 4,000gpm (6/12/98)! Over one year old.
Plan Review Completed(1st rev)  4/17/2000 FAIL
DetailsBill Alexander
PLANS RETURNED TO PLAN CHECK
Plan resubmittals requested  4/11/2000 FAIL
UBC CORRECTIONS
Routing - PLAN CHECK3/22/2000 4/11/2000 FAIL
CORRECTIONS FAXED AND MAILED TO ARCHITECT
Routing - PLUMBING3/17/2000 3/22/2000 DONE
Routing - PUBLIC WORKS3/10/2000 3/16/2000 DONE
Routing - PLANNING3/16/2000 3/16/2000 PASS
pending Design Review approval.
Plan resubmittals requested  3/15/2000 FAIL
STRUCTURAL CORRECTIONS
Routing Off Site - STRUCTURAL3/2/2000 3/15/2000 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM CORRECTIONS FAXED TO ARCHITECT MLO
Routing - PLANNING3/7/2000 3/10/2000 FAIL
DRH99-00245 CUP99-00135 DAVE, REROUTE TO PUBLIC WORKS. KMM
Requires a modification to the CU for residential
Routing - PUBLIC WORKS3/3/2000 3/7/2000 FAIL
Plan routing begun/NEW & ADDTN  3/2/2000 DONE
Plans ACCEPTED BY PLAN TECH  3/2/2000 DONE
Received Certificate of Value  3/1/2000 DONE
Application received  3/1/2000  
Recd Pcfee & Taken To Pln CK