ONE FRONT STREET * GRADING PERMIT, TO GRUB, CLEAN, EXCAVATE, GRADE, IMPORT AND COMPACT SITE EARTH MATERIALS IN PREPARATION FOR THE FUTURE CONSTRUCTION OF THE ONE FRONT STREET BUILDING. TO INSTALL CURB, GUTTER AND PAVING IN ACCORDANCE WITH THE GRADING AND DRAINAGE PLANS APPROVED BY THE PUBLIC WORKS DEPARTMENT. RELATED SITE UTILITIES INCLUDED IN THIS PERMIT. NO BUILDING CONSTRUCTION, INSTALLATION, OR DEMOLITION IS ALLOWED UNDER THIS PERMIT. DER99-00245 CUP99-00135 PC#156-00. BUILDING PERMIT BLD00-00514 AND FOUNDATION PERMIT BLD00-00515 ARE ROUTING UNDER THEIR OWN SET OF PLANS. KMM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Expired/Cancelled  8/18/2003 DONE
BLD-Final4/26/20014/27/20014/27/2001APASS
DetailsCarl Dependahl
Buck ###-####...w/ bld00-00514, ok 4/27/2001 9:54:18 AM
BLD-Conference4/26/20014/26/20014/26/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 4/26/2001 12:27:53 PM need sign off for project
PubWorks Occupancy Approval  3/22/2001 DONE
Signed Permanent Occupancy 3/22/01. R.Cummings
BLD-Conference12/1/200012/1/200012/1/2000PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 12/1/2000 12:07:28 PM need elevaton cert.
Fee Review-notes5/25/20005/25/20005/25/2000 DONE
Issue PAID IN FULL permit  5/19/2000 DONE
Telephone call  5/10/2000 DONE
talked to scott wendell to verify plans are ready with new fees for drainage per louise w./mls/5/10/00
Plan assigned to (KMM)3/2/2000 5/5/2000 PASS
DetailsKathy Miller
5/5/2000 12:54:23 KMM - activity updated through activity BLDA022 from case BLD00-00528.
Routing - PUBLIC WORKS5/3/2000 5/5/2000 PASS
Plan resubmittals received  5/5/2000 DONE
RECEIVED 5 COPIES OF REVISED SHEET C4.0 FOR BRIAN M.
TWO COPIES OF REVISED SHEET C4.0 FOR PLAN REVIEW.
TWO COPIES OF O & M MANUEL.
ROUTED TO MIKE O. AND BRIAN M. KMM
Print Pending Permit.LaserJet4  5/5/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/5/2000 DONE
Inspection Record Card- Bld  5/5/2000 DONE
Telephone call  5/5/2000 DONE
Scott Wendell at ###-####
Routing - PLAN CHECK5/2/2000 5/3/2000 DONE
Routing - PUBLIC WORKS4/28/2000 5/2/2000 FAIL
REQUIRES DRAINAGE PLANS APPROVED BY ACHD AND A DEFINITIVE PLAN NOT 3 OPTIONS. PER BRIAN MURPHY
REQUIRES STREET LIGHT PLAN , PER BILL COLSON
Plan resubmittals received  4/28/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEETS M1.0 AND M1.6. I WILL ROUTE WITH GRADING AND DRAINAGE PLANS. MIKE OTTO IS NOT IN TODAY. I WILL LET MIKE KNOW WHAT I HAVE DONE VIA E MAIL. KMM
Routing - PLAN CHECK3/17/2000 4/28/2000 DONE
Routing - FIRE3/17/2000 3/17/2000 PASS
DetailsSam Rogers
Provided water supply information for overhead fire sprinkler design requirements: Static: 55psi, Residual: 20psi, Flow: 4,000gpm (6/12/98)! Over one year old.
Routing - PLANNING3/16/2000 3/16/2000 DONE
approved for Grading Permit only.
Routing - PUBLIC WORKS3/10/2000 3/16/2000 FAIL
Routing - PLANNING3/7/2000 3/10/2000 FAIL
DRH99-00245 CUP99-00135 REQUIRES MODIFICATION TO THE CU FOR RESIDENTIAL.
Routing - PLUMBING3/6/2000 3/7/2000 DONE
Routing - PUBLIC WORKS3/3/2000 3/6/2000 FAIL
NEEDS DRAINAGE PLAN APPROVAL BY PARKS AND ACHD AND A DEFFINITIVE PLAN NOT THREE OPTIONS. PER BRIAN MURPHY. 3/6/00 DAR
Plans ACCEPTED BY PLAN TECH  3/3/2000 DONE
RECEIVED DRAINAGE CALCS. KMM
Plan routing begun/NEW & ADDTN  3/2/2000 DONE
Application received  3/2/2000 DONE
Plans ACCEPTED BY PLAN TECH  3/2/2000 PEND
REQUIRES DRAINAGE CALCS. SCOTT WENDELL IS AWARE OF THIS NEED. KMM
3/3/2000 RECEIVED DRAINAGE CALCS. KMM
Received Certificate of Value  3/2/2000 DONE