Permit Information
Permit NumberBLD00-00561
StatusFinaled
Name EROTIC CITY
Site Address 5781 W OVERLAND RD
Project Name 
Customer Number 
ePlanReviewNo
Description
**EROTIC CITY** This permit is to obtain a certificated of occupancy for a 1476 sq ft tenant space to be used for a dance club. Work to include, remove kitchen area, and noncomplying mezzanine area, construct stage areas, build partitions for dressing room area and office area, upgrade existing restrooms to bring them into compliance with accessible standards. All work to be per approved plans on file. NOTE: No food to be served. P.C.#170-00)*RMH* CU-00-42
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan resubmittals received  7/10/2002 DONE
RESPONSE LETTER 3 SHEETS OF 1. TOOK TO RON HILL
Fee Review-notes3/6/20003/6/200011/9/2001 DONE
BLD-Other10/26/200110/26/200110/26/2001 DONE
Sent email to bob bailey in case he might have any licensing requirements.
BLD-Conference10/23/200110/23/200110/23/2001APASS
DetailsBob Archibald
Added by Inspector: 325 On 10/23/2001 8:22:11 AM CO issued @ 4:45 p.m., 10/22/01, informed Jim Schmer to return power.
BLD-Final10/19/200110/19/200110/22/2001PPASS
DetailsBob Archibald
THOMAS ###-####. Corrections made for all agencies, OK for issuance of final occupancy. Power will be returned after CO is issued.
Permanent occupancy UNPAID FEE  10/22/2001 DONE
Perm. Occ. Cert. #8882 issued 10-22-01 to Erotic City.
Code Occupancy Approval  10/22/2001 PASS
SITE INSPECTION, DUE TO LIMITS ON SIZE OF PARKING LOT AND REQUIREMENTS FOR VAN HANDICAP SPACE THEY ARE PARKING SPACE SHORT ONLY HAVE 37 SPACES, I SIGNED FINAL OCCUPANCY AS INTENT OF CODE MET BUT THE LETTER OF THE REQUIREMENTS IS NOT.
Permanent Occupancy 10/19/200110/19/2001 DONE
Details
BLD-Conference10/18/200110/18/200110/17/2001APART
DetailsBob Archibald
Met with owner, electrical contractor and Jim Schmer at site and reviewed conditions to date and requirements necessary to complete project. One set of stairs on stage at right require correction of run and handrail height correction. A new electrical permit/inspections required and signoff from P&Z on CU requirements in parking lot. All these conditions were discussed with the owner Tom. Additionally a electrical correction was issued to Vixon Video, 5777 Overland, for electrical panel/meter corrections, A notice was also posted in the afternoon on the tenant, Dragon Fire @ 5771 Overland, to obtain a CO .
BLD-Other10/11/200110/11/200110/11/2001APART
DetailsBob Archibald
Jim Schmer observed tenant from 7 p.m. to 8 p.m., on 10/10/01 and no activity was observed. Sign on tenant door reports tenant closed for remodeling.
BLD-Other10/10/200110/9/200110/9/2001PPART
DetailsBob Archibald
Added by Inspector: 325 On 10/10/2001 10:58:27 AM Posted CN citing BCC 4-02-03. Also monitored tenant space from 6p.m. to 6:30 p.m. for activity. No activity or use of tenant space observed. No extension cords were observed outside.
BLD-Other9/26/20019/26/20019/26/2001AFAIL
DetailsBob Archibald
Tenant failed to obtain Certificate of Occupancy, power terminated. Posted CN.
BLD-Other9/24/20019/24/20019/24/2001AFAIL
DetailsBob Archibald
Met Scott B. with code enforcement at site this a.m.. C.U. requirements for parking lot not complete a correction notice was posted. A review of project status indicated that plumbing was finaled, electrical final had been canceled and not finaled, and no return call from owner to me had been received regarding final occupancy and issuance of CO.
Case Summary (BLD)  9/24/2001 DONE
Code Occupancy Approval  9/24/2001 FAIL
2ND INSPECTION, NO WHEEL RESTRAINTS ON NORTH SIDE OF PARKING LOTS, TO MANY COMPACT SPACES, ALL COMPACT SPACES NOT MARKED AND ONLY NOTED 37 SPACES WHEN 38 ARE REQUIRED.
Code Occupancy Approval  9/21/2001 FAIL
CORRECTION NOTICE GIVEN, HANDICAPED SPACE NO GOOD, TO MANY COMPACT SPACES AND NO WHEEL RESTRAINTS ON NORTH SIDE OF PARKING LOT.
Print Occupancy Form  9/20/2001 DONE
BLD-Final9/18/20019/19/20019/19/2001PCANC
DetailsBob Archibald
Scheduled by a contractor via Hello! on 09/18/2001 at 19:55:49. Contact: ###-####. Multiple/duplicate requests for same day.
BLD-Final9/19/20019/19/20019/19/2001PFAIL
DetailsBob Archibald
fn --thomas-- ###-#### call 1st before insp--already have another insp set up for same time. Left message on voice mail, no return call from Thomas.
BLD-Other9/18/20019/18/20019/18/2001APART
DetailsBob Archibald
35 working day N&O requirement for obtaining a Certificate of Occupancy has expired. A review of case history revealed that electrical inspections had not been finaled, No plumbing permit had been obtained and no inspections performed, and no inspection had been requested for structural requirements. No access was available this date upon a site visit and a correction notice was posted requiring certificate of occupancy be obtained by 9/21/01 or electrical utilities would be terminated 9/24/01. Copies of correction notice posted this date sent by regular mail to buisness and owners home address.
BLD-Framing/Rough-in8/28/20018/29/20018/29/2001PFAIL
DetailsBob Archibald
THOAMS ###-#### PLEASE CALL BEFORE GOING OUT. CN issued. CN and requirements discussed with permit holder. Electrical CN also issued. 8/30/2001 8:17:48 AM
BLD-Framing/Rough-in8/23/20018/24/20018/29/2001ADONE
DetailsBob Archibald
###-#### thomas. Rescheduled for 8/29/01
FIRE-Final Inspection8/23/20018/24/20018/24/2001PPASS
DetailsJoe Tawney
Reinsp OK for permanant occupancy 8/24/2001 1:46:09 PM
BLD-Final8/20/20018/21/20018/21/2001PFAIL
DetailsTom Arcoraci
###-#### no answer disconected other inspections not finaled 8/21/2001 1:04:58 AM
FIRE-Final Inspection8/20/20018/21/20018/21/2001PFAIL
DetailsJoe Tawney
Reinsp Fail fire ext 8/21/2001 3:44:26 PM
BLD-Other8/20/20018/21/20018/21/2001PFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/20/2001 at 12:05:11. Contact: ###-####.
BLD-Other8/16/20018/16/20018/16/2001APART
DetailsBob Archibald
Certified N&O sent to erotic city space returned unclaimed.
BLD-Other8/30/20018/30/20018/15/2001 FAIL
DetailsBob Archibald
Certified N&O sent to Thomas Korton returned to sender undelivered 8/15/01.
FIRE-Final Inspection8/7/20018/8/20018/8/2001PFAIL
DetailsJoe Tawney
Final Fail C/N issued 8/8/2001 2:39:24 PM
BLD-Final8/7/20018/8/20018/8/2001PFAIL
DetailsDave Hannah
###-#### FN OCC--CALL 1ST BEFORE INSP not ready needs other sign offs 8/8/2001 2:40:17 PM
BLD-Conference8/7/20018/7/20018/6/2001PPART
DetailsBob Archibald
Phone conversation with Tom Korton, ###-####, he is in reseipt of N&O and was requesting full sized plans. Informed him to contact his architect. He then said he would proceed to complete work and get sign-offs. Informed him "clock was running".
BLD-Other8/2/20018/2/20018/2/2001APART
DetailsBob Archibald
Architect responded to certified N&O.
BLD-Other7/26/20017/26/20017/26/2001PPART
DetailsBob Archibald
Sent N&O by certified mail to applicant, architect and tenant space. Also sent N&O by regular mail to appicant. 35 working days from this date is deadline, 9/14/01.
Print Occupancy Form  7/20/2001 DONE
BLD-Conference7/17/20017/18/20017/18/2001PFAIL
DetailsBob Archibald
Katie, ###-#### - call 1st so she can meet you there. CN issued, not ready, no approved plans or required signatures. Plan review requirements not performed/corrected. 7/19/2001 8:05:28 AM
BLD-Conference7/18/20017/18/20017/17/2001PFAIL
DetailsBob Archibald
Site visit no access 2:30 pm. Phoned owner no answer 3pm.
(F) Reprint permit  4/11/2001 DONE
Issue PAID IN FULL permit  11/14/2000 DONE
Routing - PLAN CHECK9/22/2000 10/26/2000 PASS
DetailsRon Hill
Routing - PLAN CHECK10/25/2000 10/26/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/26/2000 PASS
DetailsRon Hill
Print Occupancy Form  10/26/2000 DONE
Inspection Record Card- Bld  10/26/2000 DONE
Telephone call  10/26/2000 DONE
called permit ready
Plan assigned to (R_H)3/7/2000 10/26/2000 PASS
Details
10/26/2000 09:54:26 RMH - activity updated through activity BLDA022 from case BLD00-00561.
Routing - FIRE10/25/200010/25/200010/25/2000 PASS
DetailsBill Alexander
Routing - FIRE9/18/20009/21/20009/22/2000 FAIL
DetailsBill Alexander
Verify hydrant location and fire flow requirements - UFC 902, Appendix III-A and III-B.
Plan Review Completed(1st rev)  9/22/2000 FAIL
Routing - PLANNING9/18/20009/18/20009/18/2000 PASS
Per CU-00-42
Case Summary (BLD)  9/18/2000 DONE
Plan Review Report  9/18/2000 DONE
Plan Reviewer's activity  9/18/2000 PEND
DetailsRon Hill
Route to fire department for approval signatures.
Telephone call  7/17/2000 HOLD
DetailsRon Hill
Soke with Byon Smith, Architect he informed me that he will have plans resubmitted by the end of this week 7-21-00. *rmh*
Plan Reviewer's activity  7/6/2000 HOLD
DetailsRon Hill
called and left meesage for Byron Smith to call me and let me know what the status for resubmittals was.
Plan Reviewer's activity  6/22/2000  
DetailsRon Hill
Talked to Byron Smith the architect, went over some items on the plan check requirements. He is to vist with the Owner and should have resubmitted plans to the building department by next week. rmh
Plan Reviewer's activity  6/19/2000 HOLD
DetailsRon Hill
Received letter from Arcitect Byron Smith, He has indicated that he is now again assuming the resposibility of the Architect of record, and that he is proceeding with the requirements from plan check to get his permit.
Plan Reviewer's activity  6/9/2000 FAIL
DetailsRon Hill
Received letter from architect that he was instructed by the tenant not to address any of the plan review requirements. He is withdrawing his name and is no longer taking on the responsibility of being the architect of record. I Mailed a letter to the applicant and tenant Tom Korten stating that he is required to resubmit an application and plans for the tenant improvement, also sent one to Sherly Buccanan, who is subleasing the tenant space and one to the owner of the builidng Bob Mucow on 6-09-00.
Plan Reviewer's activity  5/24/2000 FAIL
DetailsRon Hill
Byron Smith called me and informed me that he no longer was going to be the Architect of record for this project that he did not want any of the responsibility for the work that was being performed at this site. I told him to send me a letter that was signed by himself stating the same. rmh
Routing - PLAN CHECK3/9/2000 5/2/2000 FAIL
DetailsRon Hill
hold not routing to fire department until I recieve response from architect.
Plan Reviewer's activity  5/2/2000 FAIL
DetailsRon Hill
Emailed and mailed requirements to the architect. mailed requirements to the owner.
Telephone call  3/28/2000 PEND
DetailsRon Hill
Tom Kortens attorney called, I informed him that the planing and zoning requirements for obtaining a CU have not been met and that no permits could be issued until the Planing and Zoning requirement has been met.
Routing - PLANNING3/8/2000 3/9/2000 FAIL
Not enough parking. Must obtain cup for parking reduction
Routing - PUBLIC WORKS3/7/2000 3/8/2000 DONE
Plan routing begun/TENANTS  3/7/2000 DONE
Route to PUBLIC WORKS, PLANNING, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  3/7/2000 DONE
Pending Assignment by MYS3/7/2000 3/7/2000 DONE
DetailsMarlene Southard
Application received  3/6/2000  
Recd Pcfee & Taken To Pln CK     