Permit Information
Permit NumberBLD00-00575
StatusFinaled
Name HEWLETT-PACKARD ATT: OLGA
Site Address 11311 W CHINDEN BLVD
Project NameHP #7 - 1ST FLR
Customer Number46B11152
ePlanReviewNo
Description
To remodel an existing 9,300 sq.ft. storage area into a standard office occupancy area. Located on the 1st floor in the southeast quadrant of the building per approved plans on file. Work to include interior finish demolition within the area to prepare for new construction. To instal a raised floor with access ramps; a short portion of non-combustible, non-bearing wall; remove a door way to the existing corridor & infill with 1-hour construction; a new suspended ceiling system, mechanical, electrical systems upgrade; sprinkler system & alarm upgrades. NOTE: This building is fully fire sprinklered for area increase. (P.C.#175-00)/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes3/7/20003/7/20004/11/2001 DONE
Letter of compliance  12/22/2000 DONE
Letter of Compliance #21299 issued 12-22-00.
BLD-Final9/14/20009/15/20009/15/2000APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/14/2000 at 13:49:12. Contact: ###-####.
FIRE-Final Inspection6/26/20006/27/20006/27/2000APASS
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 06/26/2000 at 12:33:53. Contact: ###-####. REINSP OK FOR CERTIFICATE OF COMPLETION 6/27/00 2:11:56 PM
FIRE-Final Inspection5/24/20005/30/20005/30/2000PFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 05/24/2000 at 12:43:06. Contact: ###-####. Fail fire extinguisher & approved submittals. 5/31/00 9:23:12 AM
Issue & PRINT FEE-DUE permit  4/5/2000 DONE
Routing - FIRE3/30/20004/4/20004/4/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  4/4/2000 PASS
DetailsBill Alexander
Routing - PLAN CHECK4/4/2000 4/4/2000 PASS
APPROVED AS NOTED AND ATTACHED. ROUTING FOR ISSUANCE.
PLANS/APPL TAKEN TO FRONT DESK  4/4/2000 PASS
Inspection Record Card- Bld  4/4/2000 DONE
Print Occupancy Form  4/4/2000 DONE
Telephone call  4/4/2000 DONE
talked to katie to verify plans are ready
Plan assigned to (DRS)3/10/2000 4/4/2000 PASS
DetailsDan Stuart
4/4/2000 13:32:05 DRS - activity updated through activity BLDA022 from case BLD00-00575.
Plan routing begun/TENANTS  3/10/2000 DONE
Route to PLAN CHECK and FIRE.
Pending Assignment by MYS3/10/2000 3/10/2000 DONE
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  3/8/2000 PEND
MARLENE, I CALLED JOHN MAULIN. MECH. AND ELEC. NOT STAMPED OR SIGNED. HE WILL CALL BACK. NOT SURE IF DAN WANTS THEM STAMPED AND SIGNED. JOHN CALLED BACK AND STATED THAT DAN S. USUALLY DOES NOT MAKE HIM STAMP OR SIGNE MECH. OR ELCT. I WILL LET YOU DECIDE, I DO NOT WANT THESE TO SIT UNTIL DAN COMES BACK. KMM
Received Certificate of Value  3/7/2000 DONE
Recd Pcfee & Taken To Pln CK  3/7/2000 DONE
Application received  3/7/2000  
Routing - PLAN CHECK3/10/2000 3/30/1999 PEND
Approved as noted and attached. Routing to fire code analyst for review.