Case Summary (BLD) | | | 4/27/2004 | | |
|
|
|
|
Fee Review-notes | 3/9/2000 | 3/9/2000 | 4/11/2001 | | DONE |
|
|
|
call GC
|
BLD-Final | 10/30/2000 | 10/31/2000 | 10/31/2000 | A | PASS |
Carl Dependahl
|
|
|
FN OCC- ###-####- JIM
|
Letter of compliance | | | 10/31/2000 | | DONE |
|
|
|
Letter of Compliance #20002 issued 10-31-00.
|
BLD-Final | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | NR |
Carl Dependahl
|
|
|
JIm ###-####
|
FIRE-Final Inspection | 10/27/2000 | 10/27/2000 | 10/27/2000 | P | PASS |
Joe Tawney
|
|
|
###-#### Reinsp OK for permanant occupancy 10/30/2000 8:08:05 AM
|
BLD-Final | 10/27/2000 | 10/27/2000 | 10/27/2000 | P | NR |
Tom Arcoraci
|
|
|
###-#### needs achd sig and eng letter of accep 10/27/2000 5:25:32 PM
|
Code Occupancy Approval | | | 10/27/2000 | | PASS |
|
|
|
MEETS COMPLIANCE WITH DRH99-00268
|
FIRE-Final Inspection | 10/26/2000 | 10/26/2000 | 10/26/2000 | P | FAIL |
Joe Tawney
|
|
|
Jim ###-#### Final Fail C/N issued 10/27/2000 7:54:19 AM
|
BLD-Final | 10/26/2000 | 10/26/2000 | 10/26/2000 | P | NR |
Tom Arcoraci
|
|
|
Jim ###-#### -fire is also going out needs eng letter of acceptance 10/26/2000 2:57:14 PM
|
BLD-Framing/Rough-in | 10/23/2000 | 10/23/2000 | 10/23/2000 | P | PART |
Carl Dependahl
|
|
|
CEILING GRID 1ST & 2ND FLOOR --JIM ###-####
|
BLD-Conference | 10/9/2000 | 10/9/2000 | 10/9/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/9/2000 w/ Jim of Van Auker re arch's letter for shaft deletion
|
BLD-Framing/Rough-in | 9/18/2000 | 9/20/2000 | 9/20/2000 | P | PART |
Tom Arcoraci
|
|
|
Jim ###-#### ok to 1st floor int and mech shat walls elev needs insp ofwalls 9/20/2000 4:09:28 PM
|
BLD-Framing/Rough-in | 9/8/2000 | 9/11/2000 | 9/11/2000 | A | PASS |
Tom Arcoraci
|
|
|
Jim ###-#### 2nd floor framing 9/11/2000 12:05:44 PM ok to cover 2nd floor walls only 9/11/2000 12:06:13 PM
|
BLD-Framing/Rough-in | 9/7/2000 | 9/7/2000 | 9/7/2000 | P | NR |
Carl Dependahl
|
|
|
JIM ###-#### FR ; need arch's detail for s 9/7/2000 4:16:21 PM haft/ dampers etc...incomplete info on city set 9/7/2000 4:17:06 PM
|
BLD-Framing/Rough-in | 8/1/2000 | 8/2/2000 | 8/2/2000 | A | PART |
Carl Dependahl
|
|
|
###-#### structural welding; Strata onsite, pending reports. 8/2/2000 8:18:55 AM
|
BLD-Framing/Rough-in | 7/20/2000 | 7/21/2000 | 7/21/2000 | A | PART |
Carl Dependahl
|
|
|
welding insp-- jim-- ###-####; pending report from strata 7/21/2000 8:44:27 AM
|
BLD-Foundation | 7/5/2000 | 7/6/2000 | 7/6/2000 | A | PART |
Carl Dependahl
|
|
|
Jim ###-#### Tilt-up panels- pending report. 7/7/00 1:33:32 PM
|
BLD-Concrete | 6/19/2000 | 6/20/2000 | 6/20/2000 | A | PART |
Carl Dependahl
|
|
|
FLOOR SLAB ###-#### Pend. sp. insp. reports. WIP 6/21/00 11:40:01 AM
|
BLD-Foundation | 6/12/2000 | 6/12/2000 | 6/12/2000 | P | PART |
Alan Hauser
|
|
|
###-#### jIM SPECIAL INSPECTION
|
BLD-Footing | 6/9/2000 | 6/9/2000 | 6/9/2000 | P | PART |
Russ Owen
|
|
|
jim ###-#### s-i pending report 6/13/00 10:08:27 AM
|
BLD-Footing | 6/7/2000 | 6/8/2000 | 6/8/2000 | A | PART |
Tom Arcoraci
|
|
|
jim ###-#### SPECIAL INSPECTION
|
BLD-Footing | 6/5/2000 | 6/6/2000 | 6/6/2000 | A | PART |
Alan Hauser
|
|
|
jim ###-#### Special inspection 6/6/00 2:06:08 PM
|
FIRE-Final Inspection | 5/30/2000 | 5/31/2000 | 5/31/2000 | A | PART |
Joe Tawney
|
|
|
###-#### Ok on supply line cover. 5/31/00 4:31:54 PM
|
(F) Reprint permit | | | 5/22/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/12/2000 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/17/2000 | 4/17/2000 | 4/26/2000 | | PASS |
|
|
|
FAXED THE CONSULTING STRUCTURAL ENGINEER A COPY OF THE RESPONSE FROM THE ENGINEER OF RECORD FOR HIS REVIEW. JCM
RECEIVED FINAL REVIEW APPROVAL FROM CONSULTING ENGINEER VIA E-MAIL.
|
Plan assigned to (JCM) | 3/10/2000 | 3/10/2000 | 4/26/2000 | | PASS |
John Menard
|
|
|
4/26/00 08:22:29 JCM - activity updated through activity BLDA022 from case BLD00-00601.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/2000 | | PASS |
|
|
|
|
Print Occupancy Form | | | 4/26/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/26/2000 | | DONE |
|
|
|
|
Telephone call | | | 4/26/2000 | | DONE |
|
|
|
left message gave dollar amount also told them about achd need.
|
Routing - PLAN CHECK | 4/7/2000 | | 4/26/2000 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/17/2000 | | DONE |
|
|
|
RECEIVED THREE COPIES OF ADDITIONAL CALCULATIONS FOR PINNACLE BUILDING - STRUCTURAL. ONE COPY OF STRUCTURAL COMMENTS FROM CORNEL LARSON AND TWO COPIES OF RESPONSE TO STRUCTURAL PLAN REVIEW COMMENTS FROM PATRICK VANKLEEK. ROUTED TO JOHN M. KMM
|
Plan resubmittals requested | | | 4/10/2000 | | PEND |
|
|
|
FAXED CORNELL LARSON A COPY OF THE COMMENTS FROM THE CONSULTING STRUCTURAL ENGINEER REQUESTING ADDITIONAL INFORMATION.
|
Routing Off Site - STRUCTURAL | 3/10/2000 | | 4/10/2000 | | |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
4/10/00 RECEIVED COPY OF STRUCTURAL PLAN CHECK REVIEW FROM OUTSIDE ENG. ROUTED TO JOHN M. KMM
|
Routing - FIRE | 4/4/2000 | 4/7/2000 | 4/7/2000 | | PASS |
Bill Alexander
|
|
|
Provided Water supply requirements requested in Grading 03/24/00 for fire sprinkler design. 60 static, 3000 gpm @ 20 psi. (3/24/00)
|
Plan resubmittals received | | | 4/7/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEET A-9. ONE COPY OF COVER LETTER RESPONDING TO PLAN REVIEW COMMENTS. KMM
|
Plan Review Completed(1st rev) | | | 4/7/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan resubmittals requested | | | 4/5/2000 | | PEND |
|
|
|
MAILED CORNEL LARSON A COPY OF THE PLAN REVIEW COMMENT LIST REQUESTING REVISIONS.
|
Routing - PLAN CHECK | 3/28/2000 | | 4/4/2000 | | PEND |
|
|
|
|
Routing - PLUMBING | 3/23/2000 | | 3/28/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 3/17/2000 | | 3/23/2000 | | DONE |
|
|
|
approved per DRH99-00268 & CUP99-00159. MGS & S. Riggs
|
Routing - PUBLIC WORKS | 3/10/2000 | | 3/17/2000 | | DONE |
|
|
|
|
Plan assigned to (MYS) | 3/9/2000 | 3/9/2000 | 3/10/2000 | | PASS |
Marlene Southard
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 3/10/2000 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/10/2000 | | DONE |
|
|
|
|
Received Certificate of Value | | | 3/9/2000 | | DONE |
|
|
|
|
Application received | | | 3/9/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 3/9/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/9/2000 | | DONE |
|
|
|
|