Case Summary (BLD) | | | 9/16/2006 | | |
|
|
|
|
BLD-Aging Inspection | 6/6/2005 | 6/6/2005 | 6/8/2005 | | PASS |
Jim Storey
|
|
|
expired
|
DOC - Permit Expired | 6/8/2005 | 6/8/2005 | 6/8/2005 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 3/29/2005 | 3/29/2005 | 4/4/2005 | | PASS |
Jim Storey
|
|
|
EXPIRED NO ACTIONS.
|
DOC - Permit Expired | 4/4/2005 | 4/4/2005 | 4/4/2005 | P | PASS |
Jim Storey
|
|
|
NO ACTIONS TIME EXPIRED.
|
BLD-Aging Inspection | 10/5/2004 | 10/5/2004 | 10/5/2004 | | FAIL |
Jim Storey
|
|
|
no action pending. 10/5/2004 8:31:12 AM
|
BLD-Aging Inspection | 8/3/2004 | 8/3/2004 | 8/3/2004 | | FAIL |
Jim Storey
|
|
|
pending action same isue. 8/3/2004 7:49:20 AM
|
BLD-Aging Inspection | 6/3/2004 | 6/3/2004 | 6/3/2004 | | FAIL |
Jim Storey
|
|
|
no action same isue. 6/4/2004 4:39:33 PM
|
BLD-Aging Inspection | 3/22/2004 | 3/22/2004 | 3/22/2004 | | FAIL |
Jim Storey
|
|
|
no action same isue. 3/22/2004 4:49:50 PM
|
BLD-Aging Inspection | 1/20/2004 | 1/20/2004 | 1/20/2004 | | FAIL |
Jim Storey
|
|
|
no action same isue. 1/20/2004 8:24:09 AM
|
BLD-Aging Inspection | 11/17/2003 | 11/17/2003 | 11/17/2003 | | FAIL |
Jim Storey
|
|
|
same responce as previously. 11/17/2003 8:45:42 AM
|
BLD-Aging Inspection | 9/15/2003 | 9/15/2003 | 9/15/2003 | | FAIL |
Jim Storey
|
|
|
pending action from j.g. 9/15/2003 7:28:30 AM
|
BLD-Aging Inspection | 7/14/2003 | 7/14/2003 | 7/14/2003 | | FAIL |
Jim Storey
|
|
|
no action from tenet or boise city deptment heads. 7/14/2003 7:55:23 AM
|
BLD-Aging Inspection | 5/12/2003 | 5/12/2003 | 5/12/2003 | | FAIL |
Jim Storey
|
|
|
no insp. need fire to proceed 25 day notice expired whith notice to j.gililand and t sabacka at that time. left word to please call for fire insp. 5/14/2003 11:11:01 AM
|
BLD-Conference | 3/7/2003 | 3/10/2003 | 3/10/2003 | A | PASS |
Jim Storey
|
|
|
phone call to inform permitee as to what insp. needed. 3/10/2003 9:08:26 AM
|
BLD-Final | 3/6/2003 | 3/7/2003 | 3/7/2003 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/6/2003 at 11:10:55 AM. Contact: ###-####. rolled over to monday no one on site to cover insp. scope and proceegers with. 3/7/2003 4:39:28 PM
|
Inspection Record Card- Bld | | | 2/27/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/27/2003 | | DONE |
|
|
|
|
Telephone call | | | 2/20/2003 | | DONE |
|
|
|
Telcon with fire alarm contractor - see detailed telcon notes under FIR01-00406.
|
BLD-Conference | 2/12/2003 | 2/19/2003 | 2/19/2003 | A | DONE |
Jim Storey
|
|
|
need to isue 25 day notice and order.isued on file with planreview. 2/19/2003 2:57:46 PM
|
BLD-Aging Inspection | 2/10/2003 | 2/10/2003 | 2/10/2003 | | FAIL |
Jim Storey
|
|
|
isued 5 day notice and order. 2/12/2003 8:30:56 AM
|
BLD-Aging Inspection | 12/9/2002 | 12/9/2002 | 12/9/2002 | | FAIL |
Jim Storey
|
|
|
ubc 106.4.4 contact plan review for new permit/ 104.2.5 occ. w/o insp. or approval contact planreview. 12/9/2002 11:41:41 AM
|
Telephone call | | | 2/19/2002 | | DONE |
|
|
|
talked to rick to verify plans are ready
|
Issue PAID IN FULL permit | | | 2/19/2002 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 2/19/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/31/2001 | | DONE |
|
|
|
|
Telephone call | | | 12/31/2001 | | DONE |
|
|
|
rick ###-####
|
Routing - PLAN CHECK | 12/24/2001 | | 12/28/2001 | | PASS |
|
|
|
Plans approved with conditions by Fire Code analyst. Plans approved for permit issuance based on attached plan review comments & conditions. Routing to permit desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/28/2001 | | PASS |
|
|
|
To permit desk for issue.
|
Plan assigned to (DRS) | 3/17/2000 | | 12/28/2001 | | PASS |
Dan Stuart
|
|
|
12/28/2001 07:08:51 DRS - activity updated through activity BLDA022 from case BLD00-00659.
|
Routing - FIRE | 12/20/2001 | 12/20/2001 | 12/24/2001 | | PASS |
Bill Alexander
|
|
|
|
CHANGE STATUS TO (PND) | | | 7/17/2001 | | PEND |
|
|
|
|
Additional plans submitted | | | 5/30/2001 | | |
|
|
|
Received copy of report by Lance N. Long, General Counsel, Anderson Components, concerning use of a conveyor system used to collect sawdust created by use of the two saws that cut the truss components (webs, top & bottom chords). A copy of a report from a mechanical engineer, Adolfo Costello, MiTek Industries, Inc., calculating the amount of sawdust created by the cutting of truss components. A sample of the "Wood Dust Cleaning Procedures for the Anderson Components Idaho Falls Saw Shop was also submitted for evaluation. Additional clarification is needed and I will request this information from Lance N. Long.
|
Plan resubmittals requested | | | 5/30/2001 | | |
|
|
|
Additional clarification requested concerning the conveyor system components, how it is attached to the saws and if it is interconnected to the saw operation switch; whre does the conveyor system collect the sawdust (in open bin or closed, inside or outside the building); is the conveyor system sized per the saw manufacture's design requirements and design specs if available (cfm capability of the conveyance system); clarification on the interconnection of the saw cutting operation and the large overhead doors that are kept open at all times when the saws are in operation as noted in third paragraph, reason two. Are the doors, saws and conveyor system connected by electronic components that will not allow the operation of the saws if the other doors are not open and the conveyor system not on? Please present a similar "Cleaning Procedure" proposal specifically for the "Anderson Components Boise Saw Shop" for consideration by the Fire Department. This above clarification & information, when received, will be forwarded to the fire department for their review and comments upon it's receipt.
|
Plan resubmittals received | | | 5/29/2001 | | |
|
|
|
|
Plan resubmittals received | | | 5/29/2001 | | |
|
|
|
Architect submitted two new copies of sheet A2.0 for Anderson Components. Submittals of 5/29/01 removed the restrooms located in the manufacturing area from being upgraded to full accessiblity compliance from the plans previously submited on 9/7/00. 20% of the permit cost ($4,361.00 x .20 = $872.20) will be used to upgrade accessiblitity by providing an accessible parking space; providing a ramp / landing system to the main office entry; and installing accessible lever hardware.
|
Fee Review-notes | 3/15/2000 | 3/15/2000 | 4/25/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 4/20/2001 | | |
|
|
|
e-mail to George Slane & Bob Archibald concerning tenant move in & work done with out permits, approved plans or certificate of occupancy. Follow up to Sept. 2000 notice of violation. No comments previously received.
|
Temporary occupancy | | | 4/20/2001 | | FAIL |
Steven Webb
|
|
|
received note from dstuart that work is being done and building occupied without permit or inspection. Routed to bob archibald for action by inspector.(steve webb)
|
Plan resubmittals requested | | | 9/25/2000 | | |
|
|
|
Provided written comments to Stan Cole & Ward Schwider, Cole | Associate's Architects, notifying them of specific items note complied with in the previous three submittals and that the structural division was being requested to serve the new tenant notice that he was illeagaly occupying the facility and that work has been done withourt approved plans, permits or ispections. A new Certificate of Value is also required as previously requested showing the breakdown of the separate costs for plumbing, mechanical, electrical, and fire sprinkler addition / modification / upgrade required to brinf facility into compliance.
|
Routing - FIRE | 9/18/2000 | 9/21/2000 | 9/22/2000 | | FAIL |
Bill Alexander
|
|
|
Still lack fire sprinkler design information to verify occupancy use protection. Lack current inspection and use obsolete format (not meet NFPA 25 and not accepted by the fire department).
|
Routing - PLAN CHECK | 4/20/2000 | | 9/18/2000 | | PEND |
|
|
|
Resubmittal of Sheet A2.0 & cover letter response from Ward Schwider, reviewed and inserted into original plans to replace previous A2.0 sheets. Re-submittal in response to April 17, 2000, second plan review. New Certificate of Value provided but does not have the separate values broken out that make up the total for electrical, plumbing & sprinkler system. Per the submittal from architect, many of the items have been completed withi out approved plans, inspections & approvals. Inspectors will need to verify compliance to their satisfaction to allow issuance of a certificate of occupancy for this new tenant. Routing to Fire Code analyst for review per their previous "failed" plan review.
|
Plan resubmittals received | | | 9/7/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A2.0. ROUTED TO DAN S KMM
|
Routing - FIRE | 4/18/2000 | 4/20/2000 | 4/20/2000 | | FAIL |
Bill Alexander
|
|
|
UFC issues to address.
|
Plan Review Completed(1st rev) | | | 4/20/2000 | | FAIL |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 4/14/2000 | 4/14/2000 | 4/17/2000 | | PEND |
|
|
|
INSERTED NEW RE-SUBMITTALS INTO ORIGINAL PLAN SUBMITTALS. CHANGES TO OCCUPANCY USE DECLARATION CHANGES IN RESPONSE TO REQUIREMENT FOR DECLARING ROOM AND AREA USES HAS CAUSED ADDITIONAL REQUIREMENTS IN WHAT IS NOW AND ACCESSORY "A-3" BREAKROOM. OTHER CLARIFICATION COMMENTS AND CODE SECTIONS NOTED ON PLANS FOR CONTRACTOR AND INSPECTOR VERIFICATION. ROUTING PLANS TO FIRE CODE ANALYST FOR REVIEW WHILE WAITING FOR CERTIFICATE OF VALUE UPGRADE.
|
Waiting for Cert. of Value | | | 4/17/2000 | | |
|
|
|
NEW VALUE OF $4,361.00 DECLARED ON COVER SHEET ACCOMPANYING RE-SUBMITTALS, BUT NO NEW CERTIFICATE OF VALUE FOR TOTAL COSTS AND EACH SEPARATE CATAGORY OF APPLICABLE ELECTRICAL, MECHANICAL, PLUMBING & FIRE SPRINKLER IMPROVMENT COSTS.
|
Plan resubmittals requested | | | 4/17/2000 | | FAIL |
|
|
|
RE-SUBMITTALS INCOMPLETE. ADDITIONAL INFORMATION TO CLARIFY THE CHANGES SUBMITTED BUT NOT ADDRESSED PER CODE ON THE PLANS & CERT. OF VALUE NOT SUBMITTED. LIST OF ITEMS STILL IN QUESTION LIST FAXED AND MAILED TO ARCHITECT FOR REVIEW. ROUTING TO FIRE DEPT. FOR REVIEW.
|
Plan resubmittals received | | | 4/14/2000 | | DONE |
|
|
|
RECEIVED PLAN CHECK RESUBMITTALS FROM COLE AND ASSOCIATES. FORWARDED SAME TO DANNY STUART. 4/14/00 DAR
|
Plan resubmittals requested | | | 4/3/2000 | | |
|
|
|
Copy of plan review comments FAXED & MAILED to Ward Schwinder.
|
Routing - PLAN CHECK | 3/17/2000 | | 4/3/2000 | | FAIL |
|
|
|
Plans are incomplete as to dimensioning and occupancy use of each area; details of changes made as a result of the code analysis but with out approved plans or permits or inspections. Ward had discussed this with me on two sepaerate occations, 4/14/99 & 4/29/00 as to what steps would be required for a new tenant to occupy this building site. We went through the things he would need to address in the code analysis and in the way of plans as this facility was constructed in Ada County prior to plan review process and there are no plans availble for reference or review. One of the methods for working with the tenant to obtain an occupancy was to use Resolution 13534, adopted specifically created for buildings annexed into the city and not in compliance with building standards. As Ward Schwinder did not contact me back after the preliminaries, the project was set aside and basically cancelled, gathering that the proposed tenant had not desired to pusue the matter since an existing building would need to be sprinkled or demolished.
On 3/13/00, Ward Schwinder called, at which time he said the work was completed and he had reviewed the work and they were ready for a certificate of occupancy. Ward was told he had never presented the plans required or the application for said proposed project and the work or occupancy should not have taken place until such time as approved.
Plans are to be prepared and presented for review and a permit for the proposed occupancy use with code compliance changes shown on plans and methods of correction.
|
Pending Assignment by MYS | 3/15/2000 | | 3/17/2000 | | DONE |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 3/17/2000 | | DONE |
|
|
|
Route to PLAN CHECK and FIRE.
|
Plans ACCEPTED BY PLAN TECH | | | 3/16/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/22/2000 | | | | FAIL |
|
|
|
9/22/00 - Fire code analysts failed resubmittals as incomplete. This is the second fail. Plans on hold behind my desk.
|