Permit Information
Permit NumberBLD00-00662
StatusFinaled
Name WALT MORROW CONSTRUCTION
Site Address 380 S 4TH ST
Project NameHOWELL ELLEDGE BLDG
Customer Number 
ePlanReviewNo
Description
HOWELL-ELLEDGE OFFICE BUILDING * TO CONSTRUCT A NEW 8, 927 SQ. FT. 2 STORY TYPE VN OFFICE BUILDING SHELL WITH BASEMENT. ALL WORK IS PER APPROVED PLANS AND ATTACHMENTS DRH99-0201 CVA99-0018 PC#188-00 NO OCCUPANCY OF TENANT SPACES IS AUTHORIZED PER THIS PERMIT. SEPARATE PERMITS AND PLANS ARE REQUIRED FOR EACH FINISHED SPACE. AREAS: BASEMENT - 1250 SQ. FT - FIRST FLOOR - 5,928 SQ. FT. - SECOND FLOOR - 1749 SQ. FT.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes3/15/20003/15/20009/17/2001 DONE
Letter of compliance  9/13/2001 DONE
Letter of Compliance #21954 issued 9-13-01.
BLD-Final8/31/20019/4/20019/4/2001APASS
DetailsCarl Dependahl
FN OCC- WALT-- ###-####, c/n ok, ok for final, Walt has card ? 9/4/2001 11:45:56 AM
BLD-Final8/20/20018/20/20018/20/2001PPASS
DetailsCarl Dependahl
WALT ###-#### FN
Code Occupancy Approval  8/13/2001 PASS
Inspected and passed.
Code Occupancy Approval  6/15/2001 FAIL
Inspection indicates that N/E corner landscaping not complete. Call to Earl, ###-####, and he said that ACHD work slowed work. I left bonding infor for him to discuss with the "boss."
BLD-Conference6/14/20016/14/20016/14/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 6/14/2001 9:56:36 AM w/Earl; need all finals prior to occupancy.
BLD-Final6/14/20016/14/20016/14/2001PNR
DetailsCarl Dependahl
Added by Inspector: 340 On 6/14/2001 2:25:04 PM recall when other finals complete
Telephone call  6/13/2001 DONE
left mess that permit is ready
FIRE-Final Inspection6/6/20016/6/20016/6/2001PPASS
DetailsRick Jackson
reinspection ###-####
FIRE-Final Inspection5/31/20016/1/20016/1/2001AFAIL
DetailsRick Jackson
Lori ###-#### main entry/exit locks; fire extinguishers 6/1/2001 10:20:47 AM
BLD-Conference4/26/20014/26/20014/26/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/26/2001 4:50:52 PM w/ cont. re rest rm walls...epoxy paint or equal ok
BLD-Conference3/27/20013/27/20013/27/2001PPART
DetailsTom Arcoraci
###-####\\conf only handrail ext conf need app plans for detail to meet cabo ansi 3/27/2001 1:42:21 PM
BLD-Framing/Rough-in3/14/20013/15/20013/15/2001APART
DetailsCarl Dependahl
framing in the basement Lori ###-####..ok to cover 3/15/2001 10:46:58 AM
BLD-Framing/Rough-in3/8/20013/9/20013/9/2001APART
DetailsCarl Dependahl
FR INSP --WALT-- ###-#### ok to cover except bsmt... 3/9/2001 11:18:06 AM
BLD-Conference3/7/20013/7/20013/7/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/7/2001 4:58:08 PM w/ Lynn Brown & bldr at site re c/n...wip
BLD-Framing/Rough-in3/6/20013/6/20013/6/2001PPART
DetailsCarl Dependahl
Walt ###-#### ok to cover 1st fl and bsmt; keep c/n re 1hr walls at stairs,complete draft stop, etc. 3/6/2001 6:37:26 PM
Override - Parcel Holds  3/6/2001  
BLD-Framing/Rough-in2/27/20012/28/20012/28/2001PPART
DetailsCarl Dependahl
###-####ok to insul ext walls, c/n re shear walls ; no trusses insp'd2/28/2001 4:44:36 PM 2/28/2001 4:47:48 PM
BLD-Conference11/7/200011/7/200011/7/2000PPASS
DetailsJim Storey
FOR CONF-- WARREN-- ###-#### need nail to stapple converition. 11/7/2000 3:27:36 PM
Inspection Record Card- Bld  10/30/2000 DONE
Print Occupancy Form  10/30/2000 DONE
Telephone call  10/30/2000 DONE
called Lynn Brown Architect permit ready for pickup
Routing - PLAN CHECK10/9/2000 10/30/2000 PASS
PLAN MODIFICATION
BLD-Foundation10/18/200010/19/200010/19/2000APASS
DetailsJim Storey
FOUND WALL STEVE ###-####
BLD-Footing10/17/200010/17/200010/17/2000PPASS
DetailsJim Storey
ft insp robert ###-#### pending soil report. 10/17/2000 3:22:55 PM
Routing - PLUMBING10/6/2000 10/9/2000 PASS
PLAN MODIFICATION
Plans ACCEPTED BY PLAN TECH  10/6/2000 DONE
PLAN MODIFICATION
Routing - PUBLIC WORKS10/6/2000 10/6/2000 PASS
PLAN MODIFICATION
BLD-Foundation9/21/20009/21/20009/21/2000PPART
DetailsJim Storey
###-#### basement walls ok 9/21/2000 1:46:37 PM
BLD-Conference9/18/20009/18/20009/18/2000PFAIL
Details
Scheduled by a contractor via Hello! on 09/18/2000 at 11:24:00. Contact: ###-####. must submit plans to the plans review dept, per 325 9/19/2000 9:58:12 AM
BLD-Footing9/7/20009/8/20009/8/2000APART
Details
Dave ###-#### ok to pour perimiter footers need details for th interior bearing footers for the two stairways leftmessage with the arch lynn brown 9/8/2000 10:49:50 AM
(F) Reprint permit  6/26/2000 DONE
Issue PAID IN FULL permit  6/22/2000 DONE
Inspection Record Card- Bld  6/15/2000 DONE
Print Occupancy Form  6/15/2000 DONE
Routing - PUBLIC WORKS6/9/2000 6/14/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/14/2000 DONE
Plan assigned to (MLO)3/16/2000 6/14/2000 PASS
DetailsMike Otto
6/14/2000 16:12:14 MLO - activity updated through activity BLDA022 from case BLD00-00662.
Routing - PLAN CHECK6/8/2000 6/9/2000 PASS
Plan resubmittals received  6/8/2000 PASS
RECEIVED PLAN RESUBMITTALFROM LYNN BROWN TWO SETS OF A SHEETS, L SHEETS C SHEETS, MP SHEETS M SHEETS P SHEETS AND E SHEETS. FROWARDED SAME TO MIKE OTTO. 6/8/00 DAR
Routing - FIRE5/2/20005/2/20005/2/2000 PASS
DetailsBill Alexander
Provided cedrtification of hydrant fire flows.
Routing - FIRE4/25/20004/28/20004/28/2000 FAIL
DetailsBill Alexander
Need fire flow certification for hydrant shown.
Plan Review Completed(1st rev)  4/28/2000 FAIL
DetailsBill Alexander
Meeting  4/27/2000 PEND
HAD MEETING WITH ARCHITECT. WENT OVER REQUIRED SECOND EXIT FROM SECOND STORY AND OTHER CORRECTIONS. MLO
Plan resubmittals requested  4/25/2000 FAIL
UBC CORRECTIONS
Routing - PLAN CHECK4/18/2000 4/25/2000 FAIL
CORRECTIONS MAILED AND FAXED TO ARCHITECT.
Routing - PUBLIC WORKS4/3/2000 4/18/2000 FAIL
Requires drainage plan revision sw system in achd right of way. Brian Murphy. KMM
Routing - PLUMBING3/27/2000 4/3/2000 DONE
ROUTE BACK TO PW WHEN DONE IN PLUMBING. KMM
Plan resubmittals received  3/30/2000 DONE
RECEIVED FIVE COPIES OF REVISED CIVIL SHEETS C-1, C-2. PUT WITH PLANS. KMM
Routing - PLANNING3/23/2000 3/26/2000 DONE
approved.
Plan resubmittals received  3/24/2000 DONE
Received three copies of revised sheet C-1 addressing JJ of PW'S sewer concerns. Lynn still has drainage issues with Brian Murphy to address. Lynn is working on those issues and will submit five revised drainage plans when they are done. Routed to Mike O. kmm
Routing - PUBLIC WORKS3/16/2000 3/23/2000 FAIL
REQUIRES SW SYSTEM IN ACHD RIGHT OF WAY. REQUIRES DRAINAGE PLAN REVISION. BM SHOW SEWER ON CIVIL SITE PLAN. JJ KMM
Plan routing begun/NEW & ADDTN  3/16/2000 DONE
JOHN M. STATED ENG. WILL BE DONE INHOUSE. PUT EXTRA COPY IN MY HOLD BOX. KMM
Plans ACCEPTED BY PLAN TECH  3/16/2000 DONE
Received Certificate of Value  3/15/2000 DONE
Application received  3/15/2000  
Pending Assignment by MYS3/15/2000    
DetailsMarlene Southard
Case Summary (BLD)     
Case Summary (BLD)     
PLAN MODIFICATION