Fee Review-notes | 3/15/2000 | 3/15/2000 | 1/28/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/14/2003 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | | | 3/7/2002 | | DONE |
|
|
|
Permanent Occupancy signed by Brian Murphy 03/07/02.
|
BLD-Final | 3/5/2002 | 3/5/2002 | 3/5/2002 | P | PASS |
Dave Hannah
|
|
|
###-####
|
FIRE-Final Inspection | 11/1/2001 | 11/2/2001 | 11/2/2001 | A | PASS |
Troy Cobbley
|
|
|
Fire/life safety OK 11/2/2001 9:28:22 AM
|
BLD-Final | 11/1/2001 | 11/2/2001 | 11/2/2001 | P | PART |
Dave Hannah
|
|
|
###-#### ok to final after public works signs off per occ 11/2/2001 4:07:53 PM
|
FIRE-Final Inspection | 11/1/2001 | 11/1/2001 | 11/1/2001 | P | FAIL |
Troy Cobbley
|
|
|
tim- ###-####-- Contractor to remove hardware from inner doors of weather vestible and install Fire Lane sign at entrance 11/1/2001 11:41:27 AM
|
BLD-Framing/Rough-in | 12/21/2000 | 12/21/2000 | 12/21/2000 | P | PASS |
Dave Hannah
|
|
|
shear Brian ###-#### need engineering for two hold downs one se one nw corner of bldg ok to cover if they use a inter type hold down 12/21/2000 1:31:30 PM
|
BLD-Foundation | 5/8/2000 | 5/8/2000 | 5/8/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### Found walls; hold downs "wet-set" as brick ledge installed. 5/9/00 11:31:18 AM
|
BLD-Footing | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | PART |
|
|
|
ready at 3pm ###-#### done by 316 5/4/00 6:19:17 PM
|
BLD-Footing | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | PART |
Jim Sly
|
|
|
Footing appears ok.
|
BLD-Footing | 5/3/2000 | 5/3/2000 | 5/3/2000 | P | CANC |
Tom Arcoraci
|
|
|
brian ###-#### ft Not ready 5/4/00 11:40:23 AM
|
Issue PAID IN FULL permit | | | 4/24/2000 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 3/16/2000 | 3/16/2000 | 4/18/2000 | | PASS |
John Menard
|
|
|
4/18/00 11:40:43 JCM - activity updated through activity BLDA022 from case BLD00-00663.
|
Routing - PLAN CHECK | 4/17/2000 | | 4/18/2000 | | PASS |
|
|
|
PLANS APPROVED FOR ISSUE PRIOR TO SUBDIVISION BEING RECORDED PER KAREN GALLAGHER AND PUBLIC WORKS APPROVAL. PRELIMINARY PLAT INDICATES A MINIMUM OF TWENTY FEET BETWEEN BUILDINGS AND PROPOSED COMMON LOT LINE.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2000 | | PASS |
|
|
|
|
Print Occupancy Form | | | 4/18/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/18/2000 | | DONE |
|
|
|
|
Telephone call | | | 4/18/2000 | | DONE |
|
|
|
told brian about achd
|
Routing - PLAN CHECK | 4/10/2000 | | 4/14/2000 | | PEND |
|
|
|
|
Routing - PUBLIC WORKS | 4/14/2000 | | 4/14/2000 | | PASS |
|
|
|
Allowed to construct two commercial buildings on one lot. Setbacks will be verified prior to final plat approval.
|
Routing - FIRE | 4/7/2000 | 4/7/2000 | 4/7/2000 | | FAIL |
Bill Alexander
|
|
|
Need hydrant flows for this project as requested in site grading permit BLD00-00688
|
Routing - FIRE | 4/7/2000 | 4/7/2000 | 4/7/2000 | | PASS |
Bill Alexander
|
|
|
PROVIDED water supply information 04/07/00, 3000 gpm hydrant flow and 50 psi static, 3000 gpm @ 20 psi residual.
|
Plan Reviewer's activity | | | 4/7/2000 | | PASS |
|
|
|
PLANS APPROVED AS SUBMITTED WITH ATTACHED COMMENT LIST.
|
Plan Review Completed(1st rev) | | | 4/7/2000 | | FAIL |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 3/24/2000 | | 4/7/2000 | | PEND |
|
|
|
|
Routing - PLANNING | 3/21/2000 | | 3/24/2000 | | PASS |
|
|
|
Approve per DRH99-262
|
Routing - PLUMBING | 3/21/2000 | | 3/22/2000 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 3/16/2000 | | 3/21/2000 | | FAIL |
|
|
|
SUB DIVISION NOT RECORDED PER JIM RICH. 3/21/00
|
Plans ACCEPTED BY PLAN TECH | | | 3/16/2000 | | DONE |
|
|
|
|
Application received | | | 3/15/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/15/2000 | | DONE |
|
|
|
|